Ideas
Topics
54 lesson paths, with every lesson of each in the order of the year, 394 in all, and the week it comes in. Anyone can read a lesson.
Foundations · 3 lessons
What a project is, what it is for and who it serves.
- What a Project Is · Week 1
A project is temporary work that makes something new and has an end; ongoing work keeps things running. - Why Before What · Week 1
A project serves a purpose; name the outcome you want and a way to check it before choosing what to make. - Who It's For · Week 1
Stakeholders are the people a project is for and the people it touches; find and ask them early.
Plans and charts · 10 lessons
Seeing the work: charts, flows and going to look for yourself.
- Drawing Time · Week 1
A Gantt chart puts work on a timeline, so everyone can see what happens when and what is running late. - Go and See · Week 1
Before deciding about work, go to where it happens and look for yourself, rather than relying on reports. - What Must Come First · Week 11
Dependencies say which pieces of work must wait for which, and the order of a plan comes from them. - Drawing the Network · Week 11
A network diagram draws tasks as boxes and links as arrows, so every route from start to finish shows. - The Critical Path · Week 11
The longest chain of linked tasks sets the shortest time a project can take, so delay there moves the end. - Room to Slip · Week 11
Float is how long a task can slip without moving the finish, and once it is spent it is gone. - Reading a Gantt Chart Well · Week 11
A Gantt chart shows a schedule at a glance, but read it with questions about links, certainty and people. - People Are Dependencies Too · Week 11
A schedule can be in perfect order and still impossible, because one person cannot be in two places at once. - Milestones People Can See · Week 11
A milestone is a moment anyone can recognize, and a few of them let outsiders follow a project. - The Building That Took a Year · Week 11
The Empire State Building rose in about 410 days because its builders treated the schedule as a sequence to feed.
Leading people · 3 lessons
How one person helps a group do its best work.
- The Law of the Situation · Week 1
Follett argued that good orders come from the facts of the work, shared by all, not from the rank of the giver. - The System, Not the Person · Week 1
Deming argued that most problems come from how the work is set up, not from the people doing it. - Your First Time Leading Peers · Week 7
Leading former peers means letting go of doing it all yourself and saying plainly how things will change.
Plans as guesses · 7 lessons
Why a plan is a shared guess, and how a team keeps it honest.
- A Plan Is a Shared Guess · Week 2
A plan is the team's best shared guess about the future, to be tested and improved, not a promise to defend. - Planning Is Everything · Week 2
Plans soon change; the worth of planning together is that people learn the goals and options well enough to replan fast. - Plan Near, Sketch Far · Week 2
Detail the next few weeks closely and keep later work as rough blocks, filling each in as it comes near. - Changing the Plan Without Shame · Week 2
A changed plan is news, not failure; say plainly what changed, why, and what it means for each group affected. - Writing Down Your Assumptions · Week 2
Every plan rests on things taken for granted; list them, with who checks each and when, so they can be tested. - Plans Made With the Team · Week 2
People who help make a plan understand it, believe it and spot its flaws; people handed a plan rarely do. - The Map and the Territory · Week 2
A plan is a map and the work is the territory; compare them often and calmly, and act when they part.
Scope, time and cost · 8 lessons
What you give up to get what you want, and who chooses.
- Scope, Time and Cost · Week 3
Scope, time and cost are tied: change one and at least one of the others moves, so every change is a choice. - Quality, the Hidden Fourth · Week 3
When scope, time and cost are squeezed, quality quietly pays; name it as a trade, not a silent loser. - Fast, Cheap, Good: Pick Two? · Week 3
The pick-two slogan is a fair warning but not a law: waste can be cut for free, and buying speed can backfire. - What Is Fixed Here? · Week 3
Most projects have one thing that truly cannot move; find it first, say it aloud, and let the rest bend. - Asking the Sponsor to Choose · Week 3
When something must give, the person who owns the money and the goal should choose, from clear options. - The Cost Nobody Budgets · Week 3
Overtime and exhaustion are spending too: tired teams make more mistakes, leave, and take their knowledge. - Good Enough for Whom? · Week 3
Quality is set by the people the work serves; ask them what matters, then stop polishing where nobody cares. - The Lost Mars Orbiter · Week 3
A Mars spacecraft was lost to a units mismatch between two teams, one that thinly staffed checks failed to catch.
Why projects go wrong · 7 lessons
The ordinary ways good projects go wrong.
- The Planning Fallacy · Week 4
We plan our own work from the best case; asking how long similar jobs really took gives a truer estimate. - Fog at the Start · Week 4
A vague goal lets each person picture a different result; concrete examples of done clear the fog early. - The Risk Nobody Mentioned · Week 4
Someone usually sees trouble coming but stays quiet; a lead who asks for worries hears them while there is time. - Too Many Cooks · Week 4
When everyone shares a task, each assumes another has it; give every piece of work a single named owner. - Starting at the Last Minute · Week 4
Work tends to start late and swell to fill the time it is given, so padded deadlines often finish later. - The Ship That Sank on Launch · Week 4
The warship Vasa sank in 1628 because several ordinary failings met in one hull, each making the others worse. - What a Failed Project Teaches · Week 4
Projects fail in ordinary, repeating ways, so a review that asks what happened, not who is to blame, can teach.
Teams · 14 lessons
What turns a group of people into a team, and keeps it one.
- A Team or Just a Group? · Week 5
A team shares a goal, needs each other's work and answers for the result together; a group need not. - Who Does What · Week 5
Most projects need a sponsor, a lead, a team, users and experts, and each part owes the others something. - The Sponsor · Week 5
A real sponsor wants the project, pays for it and clears the way; without one, a project drifts. - Experts and Newcomers · Week 5
Experts see what newcomers miss, and newcomers ask what experts stopped asking; a team needs both kinds. - Why Small Teams Work · Week 5
Each new member adds many new lines of talk; keep working units small and link them when the work grows. - The Orchestra Without a Conductor · Week 5
Leadership is a set of jobs that can be shared out, as one orchestra has shown without a conductor since 1972. - The Stages of a Team, and Their Limits · Week 37
Tuckman's stages give useful words for how groups develop, but teams do not pass through them in a fixed order. - Teams Wake Up at the Midpoint · Week 37
Many project teams keep their first approach until about halfway to the deadline, then change course sharply. - How Big Should a Team Be? · Week 37
Teams sharing one piece of work do best at about five to nine people; when one grows past that, split it along the work. - Roles in a Team, With an Evidence Note · Week 37
Belbin's nine roles give teams a handy language for what each person contributes, but the questionnaire behind them is weak. - Different Minds, Better Answers? · Week 37
Groups who think differently can beat groups of the individually best, on hard problems where people feel safe to disagree. - Keep Teams Together · Week 37
Teams that stay together learn each other's ways; reshuffling people costs more than it seems, though a few newcomers help. - The Team Charter · Week 37
A team charter is the team's own short record of why it exists, its goals, who does what, and how it decides and settles conflict. - Temporary Teams · Week 37
Crews formed for one job can work well at once when everyone shares a clear system of roles and keeps it clear on the spot.
Stakeholders · 3 lessons
Finding the people a project serves and touches, and working with them.
- Power and Interest · Week 5
Sort stakeholders by their power over a project and its effect on them, then choose how to involve each. - The People Not in the Room · Week 5
Those most affected often have the least power; go looking for them and bring their voices in on purpose. - Telling the Neighbours · Week 16
People who live beside a project pay for it in noise and disruption; they are owed warning and someone to call.
Goals and done · 7 lessons
Saying what success looks like before the work starts.
- Outputs and Outcomes · Week 6
An output is what a team makes; an outcome is the change it should bring. Projects can deliver one and miss the other. - Goals You Can Check · Week 6
A useful goal says what will change, by how much and by when, and aims at the point, not just what is easy to count. - Accepted or Not · Week 6
Acceptance criteria say, before work starts, what the customer will check before calling a piece of work finished. - A Shared Definition of Done · Week 6
A definition of done is a team's own short list of what every piece of work includes before anyone calls it finished. - Saying What's Out · Week 6
Say early what the project will not do; the not-list saves later arguments and lets the team say no. - Done in Whose Eyes? · Week 6
Funders, users and teams often judge done in different ways; ask each early, while the gaps can still be closed. - The Moving Finish Line · Week 6
Scope creep is a project growing through small additions nobody decided as a whole; decide each change in the open.
Managing and leading · 6 lessons
Keeping order and setting direction, with or without a title.
- Managing and Leading · Week 7
Managing keeps complex work in order; leading points it somewhere new. A project needs both, from anyone. - Order and Direction · Week 7
A project can fail from too little order or too little direction; the cure depends on which is missing. - Leading Without a Title · Week 7
People without rank lead through what they know, how they help others and whether they keep their word. - Fayol's Five Jobs of a Manager · Week 7
Fayol said a manager plans, organizes, commands, coordinates and controls; project leads still do most of it. - The Leader Who Serves · Week 7
A servant leader wants to serve first and leads in order to help others; the test is whether they grow. - Doing the Right Things · Week 7
Efficiency is doing things right; effectiveness is doing the right things, and it starts with your time.
Trust · 7 lessons
How trust is built, lost and rebuilt in a team.
- What Trust Is Made Of · Week 8
Trust rests on three judgements about a person: their skill, their goodwill and their integrity. - Keep Promises Small · Week 8
Reliability grows from small promises kept, so a new lead does well to promise little and keep it. - Saying the Hard Thing Kindly · Week 8
Candour builds trust when the listener can see you say the hard thing for their sake, not your own. - The First Week With a New Team · Week 8
In your first week leading a team, listen more than you change, and tell people what you heard. - When the Leader Gets It Wrong · Week 8
A leader who owns a mistake quickly and plainly tends to gain trust, and makes it safer for others to own theirs. - Trust Before You've Met · Week 8
Strangers in a temporary team can trust at once by trusting roles and norms, then keep it by acting reliably. - Trust Makes Plans Honest · Week 8
A plan is only as honest as the bad news people dare to report, so trust decides whether it stays true.
Starting well · 7 lessons
Business cases, charters, kick-offs and the first weeks of a project.
- The Business Case · Week 9
A business case weighs costs, benefits, risks and options, doing nothing included, so someone can decide well. - One Page to Begin · Week 9
A one-page charter states the purpose, the edges, the limits and who decides; signing it gives the lead authority. - Saying No Before Saying Yes · Week 9
Every yes takes people from something else, so decide what not to start, and say no or not yet with care. - The Kick-off Meeting · Week 9
A kick-off gathers the people doing the work so they leave sharing the why, the plan, the roles and how to work. - Talk to Users First · Week 9
A few talks with the people who will use the result, held before building, can save months spent on the wrong thing. - How We'll Work Together · Week 9
A working agreement is a team's own short list of how it will work, written together and changed when it stops fitting. - A Small Win Early · Week 9
Plan an early, visible step forward: small progress on work that matters lifts people's whole working day.
Breaking work down · 7 lessons
From one big job to pieces that people can actually do.
- The Work Breakdown Structure · Week 10
A work breakdown splits a project into pieces, then smaller pieces, until each can be estimated and owned. - Nouns Before Verbs · Week 10
Break work first into the things to be delivered, then into the tasks that make each one. - Nothing Left Out · Week 10
The 100 per cent rule: the pieces of each branch must add up to all of its work and nothing more. - How Small Is Small Enough? · Week 10
Split work until each piece can be estimated, owned and finished within one reporting period, then stop. - The Invisible Work · Week 10
The work between the pieces, such as joining, testing, training and moving data, is often larger than the pieces. - Breaking It Down Together · Week 10
A breakdown made by the people who will do the work finds more of it and finds owners for its pieces. - Slices That Matter · Week 10
Work can also be cut into thin slices that each give a user something whole, rather than into its parts.
Estimating · 8 lessons
How long, how much, and how sure anyone can be.
- Ranges, Not Points · Week 12
Give an estimate as a range with a likely point; a single number hides how unsure everyone really is. - Last Time, How Long? · Week 12
How long similar work really took before is often the best estimate, so keep a record of actual times. - Three Numbers Are Better Than One · Week 12
Ask for a best, a most likely and a worst case; the spread between them shows where the risk lies. - Those Who Do the Work Estimate It · Week 12
The people who will do the work usually estimate it better, and believe the number more, than anyone else. - Estimating Together · Week 12
When a group estimates, each person should choose privately first, because the first number said aloud anchors the rest. - Why Hidden Padding Fails · Week 12
Time quietly added to each task tends to be spent anyway; one visible reserve shared by the team protects the date. - When the Boss Wants a Smaller Number · Week 12
An estimate is a forecast, a target is a wish and a commitment is a promise; keep them apart when pressed. - It Always Takes Longer · Week 12
Estimates fail in the same direction, and the answer is a habit of comparing plans with what happened.
Budgets and money · 7 lessons
Budgets, reserves and money talked about honestly.
- What a Budget Is · Week 13
A budget is the estimates turned into money and laid out over time, and each line in it is a choice. - Money for the Unknown · Week 13
Contingency pays for known risks if they strike; a reserve covers what nobody foresaw. Keep both apart. - When the Money Moves · Week 13
A project inside its total can still run dry, because bills come due before income lands. - A Line to Measure Against · Week 13
A baseline is the approved spending plan, held still so real spending can be compared with it. - Earned Value in Plain Words · Week 13
Earned value compares work planned, work done and its cost, to show both lateness and overspending. - Most Projects Are Mostly People · Week 13
People's time is usually the biggest cost, so waiting and rework drain the budget though nothing is bought. - Talking About Money Honestly · Week 13
Report an overrun early, with its cause and options; hiding it until it shows costs more than money.
Risk · 8 lessons
Seeing trouble early and deciding what to do about it.
- A Risk or an Issue? · Week 14
A risk might happen and is planned for ahead; an issue has happened and is dealt with now. - The Risk Register · Week 14
A risk register lists each risk with its cause, effect, rating, owner and response, and stays in use. - How Likely, How Bad? · Week 14
Rating risks for likelihood and impact shows which come first, but the grid can hide rare disasters. - Every Risk Needs an Owner · Week 14
A risk with no named owner is watched by nobody; give each to the person best placed to see it and act. - Avoid, Reduce, Share, Accept · Week 14
Each risk gets one of four responses: change the plan to avoid it, reduce it, share it, or accept it knowingly. - Imagine It Already Failed · Week 14
In a pre-mortem the team pictures the project already failed and writes why, surfacing risks people keep quiet. - Risks Worth Taking · Week 14
An opportunity is an uncertain event that would help, and it can be planned for as carefully as a threat. - The Event Nobody Expected · Week 14
The rare events no register lists can matter most; prepare by keeping slack, avoiding ruin and keeping options.
Quality · 7 lessons
Building things well instead of finding the faults late.
- Build It In, Don't Inspect It In · Week 15
Quality comes from how the work is done; checking at the end finds faults but does not stop them being made. - The Cost of Late Faults · Week 15
A fault costs more to fix the later it is found, because more work has been built on top of it. - The Humble Checklist · Week 15
A short list of the steps that must not be missed catches what skilled people forget under pressure. - A Second Pair of Eyes · Week 15
A colleague who did not do the work sees what is really there, and a review spreads knowledge too. - Test as You Go · Week 15
Testing each piece as it is made finds faults while they are small and cheap, and gives a project a steady rhythm. - The User Decides What Good Is · Week 15
Quality is judged in the end by the people who use the result, so let them test it before handover. - Pride in the Work · Week 15
Most people want to do good work, and a system that takes away their pride in it takes away quality too.
Keeping people informed · 6 lessons
Reports, updates, listening, and bad news told early.
- Who Needs to Know What · Week 16
A communication plan matches each group to the news it needs, when it needs it, in a form that reaches it. - A Status Report That Tells the Truth · Week 16
A good status report says, on one page, where things stand, what changed, what is at risk and what help is needed. - Green Outside, Red Inside · Week 16
A watermelon project reports green for months and turns red at once, because hopeful rounding stacks up. - Bad News Early · Week 16
Bad news gets worse with age; raise problems while they are small, and welcome the person who raises them. - Write It Down · Week 16
Agreements kept only in memory drift apart; a short decision log and action list keep a team's story straight. - Communication Is Mostly Listening · Week 16
Leads learn most by listening to understand rather than to reply, and by checking what they heard.
Meetings · 7 lessons
Meetings that decide things, and fewer of them.
- Does This Need a Meeting? · Week 17
A meeting earns its cost when people must decide, solve or connect together; plain news travels better in writing. - An Agenda With Questions · Week 17
Write each agenda item as a question to answer, so people know what to prepare and when the item is done. - Leaving With Decisions and Actions · Week 17
Before people leave, read back what was decided and who will do what by when, so everyone carries the same list. - The Daily Stand-up · Week 17
A stand-up is a short daily meeting where a team looks at its work together, names what is stuck and gets back to it. - Hearing Every Voice · Week 17
Quiet people often know something the meeting needs; simple turns and silent writing let it come out. - Chairing Without Dominating · Week 17
A chair serves the meeting: keeping time and order, drawing people out, and holding back their own view. - Fewer, Better Meetings · Week 17
Count all a team's meetings together, cut or merge the ones it does not need, and guard long blocks for real work.
Finishing well · 8 lessons
Handover, closing down and learning from the work.
- The Last Ten Per Cent · Week 18
Work reaches ninety per cent quickly and then stalls, because the last tenth was never counted as real work. - Handing It Over · Week 18
A project's result must pass to the people who will run it, with training, papers, spares and support planned early. - Getting It Signed Off · Week 18
Sign-off is the customer's recorded agreement that the work is complete, checked against the criteria set at the start. - Closing the Books · Week 18
A project should be closed on purpose: money settled, contracts ended, records stored and people released. - Lessons That Change Something · Week 18
A lessons-learned review is worth holding only if a named change reaches the next plan and is checked. - Saying Thank You · Week 18
Thanks at a project's end tells people their work mattered, and it lands best when specific, personal and shared. - Letting a Project End · Week 18
Some projects should stop early and some should not linger; ending well takes honesty about the future and respect. - The After-Action Review · Week 18
Four short questions, asked at once by the people who did the work, with rank set aside, turn an event into learning.
The first builders · 9 lessons
How the ancient and medieval world organized great works.
- The Pyramid Crews · Week 19
The Giza pyramids were raised by fed, housed and named crews, organized in groups inside groups. - Firmness, Usefulness, Delight · Week 19
Vitruvius judged a building by three tests, sound, useful and beautiful, and wrote down how to run the work. - The Grand Canal · Week 19
The Sui Grand Canal served China for centuries, yet the labour drafted to dig it helped bring down its builders. - The Inca Road and the Mit'a · Week 19
The Inca ran a vast road network on labour turns owed by communities and on records kept in knotted cords. - Building for Your Grandchildren · Week 19
A project longer than a lifetime lasts through a kept plan, a body that owns it, and masters who train successors. - The Dome Without Scaffolding · Week 19
Brunelleschi raised Florence's dome by inventing the means, sharing command with a rival and caring for his crews. - The Master Builder · Week 19
One master builder once designed, ran and answered for a work; splitting the role gained skill but scattered blame. - The Great Church in Five Years · Week 19
Hagia Sophia rose in under six years under two mathematicians; about twenty years later part of its dome fell. - The Village Nobody Wanted · Week 19
A project can meet every technical goal and still fail if the people it serves never chose it.
Expeditions · 9 lessons
Planning for the unknown, from the poles to the open Pacific.
- Preparation Is Most of It · Week 20
The riskiest parts of a project are won in preparation: learn, test and rehearse them until the day itself is dull. - Two Plans for One Pole · Week 20
Judge a plan by what its makers knew and the margins they left, not only by whether luck went its way. - Keeping Everyone Alive · Week 20
When a project's goal is lost, a leader's job becomes holding people together: routines, fair shares and a steady face. - The Rope Team · Week 20
Summits are reached by a few and carried by many; share credit by naming who did what, and agree how before success comes. - Fleets Across Oceans · Week 20
Great efforts run on logistics, and they can end for reasons that have nothing to do with how well they were run. - The Journeys Nobody Saw · Week 20
When failure is costly and nobody may know your plan, timing, trusted helpers and agreed rules do what luck cannot. - The Courage to Turn Back · Week 20
Sometimes stopping short of the goal is the success; set your turn-back point before the pull to keep going begins. - Finding Tahiti Without Instruments · Week 20
Some vital knowledge lives in people rather than documents, and it survives only when they are given learners and time. - The Hotel at Balaclava · Week 20
A venture that lives on one customer needs a plan for the day that customer leaves.
Scientific management · 8 lessons
Measuring work, and what it cost the people who did it.
- The One Best Way · Week 21
Taylor held that study and timing could find the best method for any job, and that managers should plan it. - What Taylorism Cost the Workers · Week 21
Taylor's methods sped up work but took judgement from workers, who fought back; both sides had a real case. - Motion Study at Home and Work · Week 21
The Gilbreths studied motions to cut wasted effort, and Lillian asked how the work felt to the person doing it. - Gantt's Task and Bonus · Week 21
Gantt paid a bonus for meeting a task but kept a day's wage for those who missed it, and asked why they missed. - Fayol's Principles · Week 21
Fayol's principles include one boss per person and a bridge for direct talk; projects test both. - Rules Instead of Favourites · Week 21
Weber saw bureaucracy's written rules and merit as protection against favouritism, at the cost of rigidity. - What Survives of Scientific Management · Week 21
Measurement, standard methods and planning ahead live on; the split between thinkers and doers mostly did not. - The Moving Assembly Line · Week 21
Ford's line brought the work to each worker and cut assembly time hugely, but people quit until pay rose.
The human side · 7 lessons
When management discovered that workers are people.
- Power With, Not Power Over · Week 22
Power built together lasts longer than power imposed, and a conflict can be integrated instead of won or split. - What Happened at Hawthorne · Week 22
The Hawthorne studies became a story that attention raises output; the evidence behind that story is much thinner. - Why People Cooperate · Week 22
An organization lasts only while people choose to give it effort, and an order has authority only when it is accepted. - Theory X and Theory Y · Week 22
What a manager assumes about people shapes how they are managed, and how they are managed tends to prove the assumption. - Satisfied, or Merely Not Dissatisfied · Week 22
Herzberg argued that fixing complaints only removes unhappiness, and that satisfaction comes from the work itself. - The Pyramid Maslow Never Drew · Week 22
Maslow described needs that overlap; the famous pyramid, with its strict floors, was drawn by someone else. - Human Relations Then and Now · Week 22
The human relations movement taught managers to attend to people; its critics warned that attention can stand in for change.
The quality movement · 7 lessons
Variation, systems and Japan's quality revolution.
- Two Kinds of Variation · Week 23
Some variation is built into a process and some has a cause you can find; mistaking one for the other makes things worse. - Deming in Japan · Week 23
Deming's 1950 lectures helped Japan's industry change, but one teacher explains only part of a country's recovery. - Fourteen Points, Retold · Week 23
Deming's fourteen points tell managers to banish fear, drop quotas and join up departments: widely praised, seldom followed. - The Red Beads · Week 23
Deming's bead game shows that praising, ranking and blaming people for results the system decides changes nothing but the mood. - Planning, Control, Improvement · Week 23
Juran saw quality as three jobs, planning, holding steady and raising it, and urged teams to tackle the biggest causes first. - Everyone Owns Quality · Week 23
Ishikawa put quality in the hands of the people doing the work, with small circles and a fishbone diagram to trace causes. - Plan, Do, Study, Act · Week 23
Test a change small, predict what it will do, compare the result with the prediction, then adopt, adapt or abandon it.
The systems era · 9 lessons
Missiles, moonshots and the birth of project management.
- PERT and the Polaris Missile · Week 24
PERT made Polaris famous for its planning, but its biggest effect may have been on the people watching. - DuPont's Critical Path · Week 24
The critical path was born in plant shutdowns, where jobs were familiar, their order fixed and every lost day priced. - Total Responsibility · Week 24
On work that cannot be allowed to fail, each part needs one person who answers for it and understands it. - How Apollo Was Run · Week 24
Apollo was run as one system across government, industry and universities, held together by strict control of change. - Software Becomes Engineering · Week 24
Design for the error someone will make: decide in advance what keeps running under overload and what can wait. - Seeing the Whole · Week 24
Systems fail most often at the joins between parts, so watch the interfaces and test upward from parts to whole. - Adding People to a Late Project · Week 24
Adding people to late, tightly linked work tends to slow it further, unless the new work can stand apart. - The Human Computers · Week 24
Before electronic machines, teams of people did the sums, and their careful checking was what others trusted with their lives. - The Railway Through the Pass · Week 24
With the money fixed and mountains in the way, Zhan Tianyou bent the design rather than the budget.
Lean · 8 lessons
Flow, waste and respect for people, from Toyota outward.
- Stop the Line · Week 25
Build a stop into the work, so that a fault halts things at once instead of travelling on. - Just in Time · Week 25
Make only what the next step needs, when it needs it, and let low stock show the problems that big piles hide. - Seeing Waste · Week 25
Ohno's seven wastes give names to the time and effort that add nothing for the person being served. - Ten Minutes, Not Four Hours · Week 25
Shingo showed that quick changeovers make small batches pay, and that a step can be designed so a mistake cannot be made. - Anyone Can Pull the Cord · Week 25
A cord anyone may pull is worth little unless leaders answer it fast and treat the person who pulled it as a help. - Respect for People · Week 25
Lean stands on improvement and on respect for people; copies that keep only the first often fail the workers. - Lean Outside the Factory · Week 25
Lean has helped hospitals and public offices that learned its habits, and disappointed those that copied only its tools. - Small Improvements Every Day · Week 25
Kaizen is improvement by everyone, through many small changes made by the people who do the work.
Plan-driven methods · 7 lessons
Phases, gates and plans made in full before the work.
- The Paper Everyone Misread · Week 26
The paper credited with the waterfall method called the strict sequence risky and argued for trial versions. - Phases and Gates · Week 26
A gate is a real decision to continue, change or stop; gates that never stop anything are only paperwork. - The V · Week 26
The V writes each test when its matching design is written, which is why high-stakes, regulated fields favour it. - Managing by Stages and Exceptions · Week 26
Give a manager clear limits, let them decide freely inside them, and have the board decide only what falls outside. - When a Full Plan First Fits · Week 26
Where change after starting is costly, regulated or physically impossible, planning in full before building pays. - How Contracts Shape Methods · Week 26
Who carries the risk of overruns decides how much must be planned up front, so contracts often choose the method. - Documents That Help and Documents That Hide · Week 26
A document earns its place when someone reads it and acts differently; otherwise it may be there to hide or to shield.
Reading the numbers · 7 lessons
What project numbers show and what they hide.
- What Ninety Per Cent Done Hides · Week 27
Per cent complete is usually a guess; counting items that are wholly finished shows progress more honestly. - Burn-down and Burn-up Charts · Week 27
A burn-down shows work left over time; a burn-up shows work done against a total, so added work shows. - Reading the Earned Value Numbers · Week 27
Two ratios from earned value show the health of cost and schedule and forecast the final bill, if read with care. - Velocity and Its Abuse · Week 27
Velocity helps a team forecast its own work; used to compare or push teams, it inflates and stops meaning anything. - How Long Things Actually Take · Week 27
Cycle time is the work itself, lead time adds the wait before it, and throughput counts what finishes each week. - When a Measure Becomes a Target · Week 27
Once people are judged by a number, they find ways to move the number without moving the work behind it. - Numbers That Change Minds · Week 27
Florence Nightingale chose and drew her death figures for the people who had to act, and changed their minds.
Reading the evidence · 7 lessons
What research on teams can and cannot tell you.
- What Counts as Evidence · Week 28
Before building on a claim about teams, ask what kind of evidence stands behind it. - The Conditions for a Good Team · Week 28
Leaders help a team most by setting up the conditions in which it can manage its own work. - The Study That Found More Errors · Week 28
A count of reported mistakes measures both the mistakes made and people's willingness to own up. - Who Should Be on the Team · Week 28
Mixing people of different backgrounds can help a team or hurt it; how they work together decides which. - Beware the Small Study · Week 28
A striking finding from a small study is a reason to look again, not a rule to follow. - Studying Only the Winners · Week 28
Lessons drawn from successes alone miss the failures that did the same things and vanished. - Happy Teams or Good Teams? · Week 28
When morale and results rise together, ask which drives which, and what might be driving both.
Agile · 8 lessons
Short cycles, working results and the people who build them.
- The Rugby Approach · Week 29
Fast product teams work like a rugby side, not a relay: one mixed team carries the work together from start to finish. - What Agile Was Reacting Against · Week 29
Agile grew out of decades of late, costly software and anger at heavy documents, but not every failure was the plan's fault. - Four Values From a Ski Lodge · Week 29
The agile manifesto prizes people, working results, collaboration and change, while still valuing plans and documents. - Turning Good Habits Up · Week 29
Extreme Programming took habits programmers knew were good, such as testing and review, and did them all the time. - Scrum in Brief · Week 29
Scrum runs work in short fixed cycles, with a product owner, developers and a scrum master, and leaves much to the team. - Agile Outside Software · Week 29
Short cycles and regular reviews travel well beyond software; releasing the real thing every few weeks often does not. - What Agile Became · Week 29
As agile spread, critics including its founders said it turned into ritual; defenders say the ideas still did much good. - Other Agile Families · Week 29
Crystal fitted process to team and risk, DSDM fixed time and money and let scope give, and FDD built in small features.
Flow · 8 lessons
Queues, bottlenecks and finishing before starting.
- Make the Work Visible · Week 30
Put every piece of work on a card in a column for its stage, so the whole team can see the flow. - Stop Starting, Start Finishing · Week 30
Capping how much is started but unfinished makes work finish sooner and shows where it gets stuck. - Little's Law · Week 30
On average, the work inside a system equals its arrival rate times its time inside, so less work in means shorter waits. - The Goal and the Bottleneck · Week 30
Every system has one step that limits its output, so gains made anywhere else change little for the whole. - Critical Chain · Week 30
Cut the hidden padding from tasks, pool the safety in a buffer at the end, and watch how fast it is used. - What Waiting Costs · Week 30
Put a price on each week a piece of work is late, and let that price decide what goes first. - The Cost of Switching · Week 30
Every change of task costs time and attention, and people spread across many projects lose much of their week to it. - Lean Software · Week 30
Lean's wastes and its pull carried over to software, but writing code is design work, not repeating one part.
Theories of leadership · 8 lessons
A century of ideas about what makes a leader.
- Born Leaders? · Week 31
Decades of research found no trait that makes a leader; a few traits help a little, and the situation matters. - It Depends on the Person · Week 31
Situational leadership says to match how much you direct and support to each person's skill and confidence. - Lifting People Up · Week 31
Transactional leaders trade rewards for effort; transforming ones raise what people aim for, for good or ill. - Servant Leadership, Examined · Week 31
Servant leadership now has research behind it, and critics who ask whether serving can dodge hard choices. - Technical and Adaptive Problems · Week 31
Technical problems can be solved by experts; adaptive ones need the people with the problem to change. - Being Yourself, at Work? · Week 31
Authentic leadership asks leaders to know and act on their values; critics say the self is less fixed than that. - Followers Make Leaders · Week 31
Leaders depend on followers who think for themselves and still back the work; following well is a skill. - Leadership and Gender · Week 31
Research finds small average differences in how women and men lead, and some bias in how leaders are judged.
Leadership around the world · 9 lessons
How leading and deciding differ across cultures.
- Preparing the Roots · Week 32
Nemawashi talks a proposal over with each person it touches first; ringi then circulates it in writing for approval. - I Am Because We Are · Week 32
Ubuntu holds that a person is a person through other people; as a way of leading, it asks for gathering, listening and sharing. - Teams That Run Themselves · Week 32
People and machines form one system; groups that share a whole task and run it themselves can do better than narrow jobs. - Making Do Brilliantly · Week 32
Jugaad, ingenious making-do, can yield brilliant frugal designs, but improvising where safety is at stake is a gamble. - A Million Farmers' Project · Week 32
Kurien built India's dairy boom on cooperatives the farmers owned, which meant leading owners who could say no. - The Long View · Week 32
Germany's family firms plan for decades and share decisions with elected staff councils, trading speed for support. - Measuring Culture · Week 32
Hofstede scored national cultures on dimensions like power distance; the scores describe large groups, never one person. - Pulling Together · Week 32
Kenya's harambee built schools and clinics by local self-help, and showed how politics can capture a shared effort. - In Front, in the Middle, Behind · Week 32
There are three places to lead from: ahead as a model, among people to stir their will, and behind them as support.
Plan first or learn first · 7 lessons
Choosing between predictive and adaptive ways of working.
- Two Ways to Face the Unknown · Week 33
A predictive approach plans the whole job first; an adaptive one plans a little, builds, learns and plans again. - The Cone of Uncertainty · Week 33
Early estimates can miss by a factor of four either way; the range narrows only as decisions get made. - The Case for Planning First · Week 33
Where change is ruinous, approvals are needed, many must coordinate or lives are at stake, a full plan earns its cost. - The Case for Learning First · Week 33
When nobody knows what will work, a detailed plan hides ignorance; small, cheap experiments find out faster. - Boehm's Spiral · Week 33
In Boehm's spiral each loop finds the biggest risk, reduces it with a prototype or study, then plans the next loop. - Mixing the Two · Week 33
Most projects mix the two approaches; the trouble lies at the seams, where a fixed rhythm meets a changing one. - Choosing for This Project · Week 33
Ask how stable the needs are, how dear change is, who must approve what and how seasoned the team is; then choose.
Forecasting · 7 lessons
Estimates, forecasts and commitments, and the argument about them.
- Why Estimate at All? · Week 34
An estimate serves a decision, so the decision sets how much effort and precision the estimate deserves. - The Case Against Estimating · Week 34
Critics of estimating say slice work small and count what finishes; defenders reply that budgets and dates still need forecasts. - Forecasting From What Already Happened · Week 34
Count what a team finishes each week and what is left, and you can forecast a range of dates without estimating tasks. - Monte Carlo in Plain Words · Week 34
A Monte Carlo simulation plays a plan out thousands of times with random durations and counts how often each date comes up. - Look at Projects Like Yours · Week 34
Forecast a project from how similar finished projects turned out, then adjust for real differences, not the other way round. - A Forecast Is Not a Promise · Week 34
A forecast says what will probably happen and moves with the facts; a promise is what people commit to keep. - Estimates and Trust · Week 34
Many fights about estimates are about trust, so mend what each side fears before arguing about the method.
Structures · 8 lessons
How organizations arrange people around projects.
- Departments by Skill · Week 35
Grouping people by skill builds deep expertise, but leaves work that crosses departments with no single owner. - Two Bosses · Week 35
In a matrix people answer to a department head and a project lead, which works only when each boss's say is clear. - The Project as the Organization · Week 35
When the project is the organization, its team gains focus and speed, and loses its home when the work ends. - The Project Office · Week 35
A project office may advise projects, set and check their rules, or run them, and each kind is easy to cut. - Teams That Keep the Product · Week 35
Some organizations swap temporary projects for lasting teams that own a product and keep improving it. - Responsible but Not in Charge · Week 35
Most project leads answer for results without authority over the workers, so they work through influence and agreements. - Structure Shapes Behaviour · Week 35
Organizations tend to build systems that copy their own lines of communication, so how teams are drawn shapes what they make. - Running Things With Volunteers · Week 35
Volunteer projects last when roles are small and clear, thanks are real, commitment is flexible and no one is irreplaceable.
Programmes and portfolios · 8 lessons
Many projects at once, and choosing among them.
- A Programme Is Not a Big Project · Week 36
A programme runs related projects together for a benefit none could bring alone, and steers by that benefit. - Choosing Among Projects · Week 36
Portfolio management looks at every project at once and decides which to start, which to keep and which to stop. - Too Many Projects · Week 36
Start more projects than you have people for and everything slows; leaders at the top have to limit what runs at once. - Projects Carry Strategy · Week 36
Strategy becomes real only through the projects that get money and people; objectives link the two, unless they become quotas. - Scaling Agile and Its Critics · Week 36
Scaling frameworks try to coordinate many agile teams on one product; critics say they rebuild the weight agile set out to shed. - Many Teams, One Thing · Week 36
When many teams build parts of one thing, the hard work is at the joins, so interfaces and integration are planned from the start. - Who Steers? · Week 36
A steering group exists to decide, unblock and ask hard questions; many only listen to reports, and then nobody steers. - Twelve Million Mothers · Week 36
When a programme grows beyond what you can watch, what you pay for and check is what you get.
Motivation · 7 lessons
What moves people to do good work, and what does not.
- Autonomy, Competence, Relatedness · Week 38
People bring their own energy to work that gives them some choice, lets them feel capable and connects them to others. - When Rewards Backfire · Week 38
Paying people for work they already enjoy may weaken their own interest in it, though how far is still argued. - Pay and Fairness · Week 38
People judge their pay by comparing what they give and get with others, and act when the balance feels unfair. - Work That Matters · Week 38
Meeting the people your work helps can change how hard and how carefully you work. - Getting Better at Something · Week 38
Feeling yourself improve is a strong motivator, and a lead can build growth into the work itself. - Thanks That Lands · Week 38
Recognition motivates when it is specific, timely and sincere, and fails when it is generic or a technique. - What Does Not Motivate · Week 38
Some of the most popular ideas about motivation have little evidence behind them, and the ones that do fit different work.
Conflict · 7 lessons
Disagreement that helps and disagreement that harms.
- Two Kinds of Conflict · Week 39
Arguing about the work differs from friction between people, and the first helps only when the second stays low. - Five Ways to Handle a Conflict · Week 39
People handle conflict in five broad ways, and each suits some situations; the skill lies in choosing. - Interests, Not Positions · Week 39
Behind each position lies an interest, and looking for interests opens options that a clash of positions closes. - When Someone Steps In · Week 39
A mediator helps people in conflict reach their own agreement without deciding for them, and needs both sides' trust. - Disagree and Commit · Week 39
Argue openly, then carry out the decision fully: a rule that speeds action but can silence warnings that matter. - The Conflict Nobody Has · Week 39
A group can agree to something nobody wants when each member keeps quiet, thinking the others want it. - Having the Conversation · Week 39
A clash between two people often needs one private, structured talk: facts, effect, their view and a clear next step.
Deciding together · 7 lessons
Who decides, and how a group reaches a decision.
- Who Decides? · Week 40
Many team quarrels are about whose call a choice is; naming who decides, who is asked and who is told heads them off. - Consensus · Week 40
In consensus a group acts only when all can accept the choice; it builds ownership but costs time and hands one person a veto. - Consent · Week 40
Under consent a proposal passes unless someone can show it would do harm, which lets groups decide faster than consensus. - Ask, Then Decide · Week 40
In the advice process anyone may decide, after asking those affected and those who know most, and then answers for the choice. - Who Does, Who Decides, Who Is Asked · Week 40
A responsibility chart sets tasks against people and marks who does each, who answers for it, who is asked and who is told. - When the Group Thinks Too Alike · Week 40
A close group under pressure can hide its doubts and agree on a poor plan; built-in dissent and outside views help. - Deciding With No Time · Week 40
Under time pressure experts recognize a situation and act on the first workable option; a shared purpose lets others act too.
Hard conversations · 8 lessons
Feedback, one-to-ones and the conversations people avoid.
- Feedback That Lands · Week 41
Useful feedback points at one moment, what was done and what it caused, instead of passing a verdict on someone. - The One-to-One · Week 41
A regular one-to-one is the team member's meeting: their worries, growth and questions, not a status report. - How Much to Hand Over · Week 41
Handing over a decision is a matter of degree, and saying which degree is meant saves both sides from disappointment. - When Someone Is Not Delivering · Week 41
Before treating poor work as a flaw of character, find out whether the cause is clarity, skill, tools, will or life. - Hearing It Yourself · Week 41
Leads hear the truth about themselves only if they ask pointed questions often and take the answers well. - Pushing Back Upward · Week 41
When a boss asks for something unwise, a lead owes them the facts, some options and respect, not silence or defiance. - Letting Someone Go · Week 41
Ending someone's place on a team should be fair, lawful and humane, and its preparation starts long before the meeting. - The Surgeon Who Had Been a Patient · Week 41
A skill can be handed over one small step at a time, each step given when the learner has shown she is ready for it.
Influence and politics · 8 lessons
Power, coalitions and persuasion, used fairly.
- Mapping Power · Week 42
Power at work comes from several sources, and much of it sits with people whose title does not show it. - Building a Coalition · Week 42
Changes last when enough people with influence back them, and that support is gathered one conversation at a time. - When Someone Resists · Week 42
Resistance often carries useful news, so find out what lies behind it before trying to overcome it. - The Sponsor Who Vanishes · Week 42
When a sponsor fades away, a lead can ask for a clear decision, name the cost of silence, or help find a new sponsor. - How People Are Persuaded · Week 42
A few well-studied habits of mind make people more likely to say yes, and each can be used honestly or as a trick. - Influence or Manipulation? · Week 42
Honest influence offers good reasons and leaves the choice to the other person; manipulation works around their judgement. - Politics Is Not a Dirty Word · Week 42
Where interests differ, politics happens anyway; the choice is whether to take part openly and fairly or to leave it to others. - Organizing Those Nobody Counted · Week 42
People with no rank and no employer can still build power, by joining together and owning the bodies that serve them.
Distance and difference · 8 lessons
Remote teams, time zones and working across cultures.
- Working Apart · Week 43
Distance takes away quick questions, shared context and easy trust, so distant teams must rebuild them on purpose. - Time Zones · Week 43
Time zones can pass work around the clock or leave questions waiting a day, so guard the overlap and share awkward hours. - A Team That Writes · Week 43
Distant teams work largely in writing, so messages must stand alone, decisions must be recorded and papers must come first. - In the Room and on the Screen · Week 43
In mixed meetings the people on the screen are easily left out, so give everyone the same voice, view and record. - Saying It Plainly or Saying It Softly · Week 43
Hall described cultures that leave much unsaid and ones that spell it out; treat it as a loose tendency and check meaning. - Working in a Second Language · Week 43
Many people work in a learned language, so use plain words, write key points down and check understanding. - Trust Across Distance · Week 43
Trust is harder to build at a distance, but meeting early, replying reliably and making time to talk can build it. - Coordinating Thousands of Volunteers · Week 43
Open-source projects coordinate thousands who never meet through open talk, small reviewed changes and written rules.
Complexity · 8 lessons
Work where cause and effect show only afterwards.
- Four Kinds of Situation · Week 44
Before choosing a method, ask what kind of situation you are in: clear, complicated, complex or chaotic. - Complicated Is Not Complex · Week 44
A complicated system can be worked out by experts; a complex one changes as you act on it and is understood only afterwards. - Small Experiments · Week 44
Where cause and effect show only afterwards, run several cheap trials at once, then grow what works and stop what does not. - Making Sense Under Pressure · Week 44
Teams act on a shared picture of what is happening; when events break it, they need ways to rebuild it together. - Order Without a Planner · Week 44
Some order comes from many people following local habits; a lead can shape those conditions but not command the result. - A Few Simple Rules · Week 44
A clear purpose and a handful of firm rules let people adapt when plans break; too many rules stop them thinking. - Planning in Fog · Week 44
When the future is unclear, keep options open, favour choices you can undo, and commit as late as is responsible. - Weighing Every Child · Week 44
A handful of simple tasks, repeated faithfully by thousands of neighbours, can reach further than any central plan.
Megaprojects · 8 lessons
The biggest projects, and why they so often overrun.
- Over Budget, Over Time, Over and Over · Week 45
Most very large projects run over budget and late, fall short of their promised benefits, and the pattern keeps repeating. - The Opera House · Week 45
Sydney's opera house missed every cost and date in its plan, and still became one of the world's best-loved buildings. - The Channel Tunnel · Week 45
Between Britain and France, rules that changed after the price was set helped push the tunnel's cost far above plan. - Panama, Twice · Week 45
The second attempt at Panama succeeded because it stopped, prepared, fought disease and changed the design before it dug. - The Hiding Hand · Week 45
Hirschman said that underrating difficulty gets good projects started; Flyvbjerg replies that most find only higher costs. - Lying to Get Started · Week 45
Some low estimates are not honest mistakes but numbers shaded to win approval, and a project lead may be asked to present one. - The People Megaprojects Move · Week 45
Dams, railways and new cities can move whole communities, and fairness depends on how they are counted, heard and repaid. - The Big Dig · Week 45
Boston buried a highway in tunnels at five times its first estimate, and still argues over whether the result was worth it.
Failure and safety · 8 lessons
How accidents happen and how organizations learn from them.
- The Launch Decision · Week 46
Disasters often grow from small risks accepted so many times that they stop looking like risks at all. - Accidents That Are Normal · Week 46
In some systems, small failures combine faster than anyone can understand them, so accidents are built in. - Holes in the Cheese · Week 46
Harm gets through when the weak spots in several defences happen to line up at the same moment. - A Review Without Blame · Week 46
After a failure, ask why each action made sense at the time, so people tell the truth and the system gets fixed. - Where Blame Belongs · Week 46
A just culture separates honest mistakes, risky choices and reckless acts, and answers each one differently. - Organizations That Rarely Fail · Week 46
Some organizations run dangerous work with few accidents by staying uneasy, curious and ready to let experts lead. - It Looked Obvious Afterwards · Week 46
Knowing how a story ended makes its warning signs look louder than they were, and reviews turn unfair. - A Successful Failure · Week 46
When Apollo 13's mission failed, its teams split the crisis into problems and brought the crew home.
Speaking up · 7 lessons
Psychological safety, silence and the courage to speak.
- What Psychological Safety Is, and Is Not · Week 47
Psychological safety is a team's shared belief that speaking up is safe, not a promise of comfort or easy standards. - Why People Stay Silent · Week 47
People keep quiet about problems when speaking seems risky or pointless, and each cause needs its own remedy. - Your First Reaction · Week 47
How a leader reacts to the first person who brings bad news teaches the whole team whether to speak next time. - Asking So People Answer · Week 47
Questions asked out of real curiosity, before giving your own view, draw out what people actually see. - Safe Is Not Soft · Week 47
The strongest teams pair high standards with the freedom to admit problems; either one alone falls short. - Speaking Up to Rank · Week 47
Rank makes juniors hesitate to challenge, so good teams agree in advance how to speak up and how to listen. - Checking the Climate · Week 47
A short survey can show how safe a team feels, but it misses what people will not write, so pair it with talk.
Leading change · 7 lessons
Why change is hard and how people get through it.
- Unfreeze, Change, Refreeze · Week 48
Old habits must be loosened before new ones can settle, though Lewin himself wrote only a few lines on it. - Eight Steps and Their Critics · Week 48
Kotter's eight steps name the usual mistakes in leading change, but they are a guide built on experience, not a law. - Endings Come First · Week 48
A change is an event, but people go through a transition, and every transition starts with letting something go. - Why Change Efforts Stall · Week 48
The famous claim that most change efforts fail has no sound source; the useful question is why particular ones stall. - Listening to Resistance · Week 48
Across a whole change, sort the pushback: some protects something worth keeping, and some protects only comfort. - A Movement One Tree at a Time · Week 48
A large change can spread through small, paid, local actions that anyone can take and everyone can see. - Small Changes That Spread · Week 48
Positive deviance finds people already succeeding against the odds and helps their neighbours learn what they do.
Culture · 7 lessons
The unwritten rules of a team or an organization.
- Three Levels of Culture · Week 49
Culture shows on three levels: what you can see, what people say they value, and what they take for granted. - What Leaders Pay Attention To · Week 49
People learn what really matters from what leaders notice, measure, reward and do in a crisis, not from what they say. - Rituals and Stories · Week 49
Rituals and the stories people retell carry a culture further than any policy, and they can be retired with care. - The Learning Organization · Week 49
Senge pictured an organization that learns as a whole; a lessons register is one plain tool for getting closer to it. - Questioning the Rules · Week 49
Single-loop learning fixes errors within the rules; double-loop learning asks whether the rules themselves are right. - Changing a Culture Slowly · Week 49
A failing car plant changed its culture by changing daily work first; belief followed, slowly, and was hard to copy. - Many Cultures in One Place · Week 49
Most organizations hold several cultures at once, and projects often sit at the seams between them.
The leader's self · 8 lessons
Self-awareness, energy and a pace you can keep.
- Seeing Yourself · Week 50
Others see parts of us we cannot; the Johari window maps them, and a few honest questions to others shrink that gap. - Reading Feelings, With an Evidence Note · Week 50
Reading and handling feelings is a real skill that matters most in emotional work, but popular claims oversell it. - The Humble Leader · Week 50
Leaders who own their limits and credit others tend to build teams that learn, though the famous evidence is shaky. - A Pace You Can Keep · Week 50
Work at a rate the team could hold for months; leads set that pace mostly by what they do themselves. - Burnout · Week 50
Burnout is exhaustion, cynicism and a sense of futility that grow mostly from how work is set up, not from weakness. - Your Own Week · Week 50
A lead who has lost control of their own week cannot guard the team's; track it, sort it, and fence off real work. - Learning From Your Own Work · Week 50
Experience teaches only when you stop to reflect on it; a short journal of decisions and results turns years into learning. - Sleep and Judgement · Week 50
Sleep loss blunts judgement well before the tired person notices, so a team at a deadline needs rules, not self-reports.
Ethics · 7 lessons
Safety, honesty and duty to the people a project touches.
- When Schedule Pushes Safety · Week 51
When a safety warning and the schedule pull apart, the warning deserves a pause, a check and a decision someone owns. - Blowing the Whistle · Week 51
Some people take a warning outside when nobody inside will hear it; the better cure is listening before it comes to that. - Duty to the People You Touch · Week 51
A project answers to its sponsor, but it owes something to everyone it touches, including those who never asked for it. - Saying Stop · Week 51
Stop-work authority lets anyone halt unsafe work without penalty, but people use it only where stopping is welcomed. - Truth in Reports · Week 51
A report is a promise that its writer believes it; hopeful rounding becomes a falsehood once you know it is untrue. - Promises Made in Public · Week 51
Professional oaths and rings enforce nothing by themselves, but they mark a duty and give colleagues words to hold each other to. - Small Ethics · Week 51
Most ethical choices in a project are small and daily, and they teach a team what its lead values more than any code.
A week of practice · 7 lessons
Running a small real project, one step a day.
- Day 1: Pick a Project and Its Why · Week 52
Choose a small project you care about, then write why it matters and one result someone else could check. - Day 2: Name the People and What Done Means · Week 52
List everyone your project serves or touches, then write what done means, with checks and a short not-list. - Day 3: Break It Down and Put It in Order · Week 52
Break the project into deliverables and then tasks, put them in order, and find the few that must come first. - Day 4: Three Risks and a Pre-mortem · Week 52
Picture your project as already failed, write why, then pick the three likeliest, worst risks and decide a response to each. - Day 5: Agree How You Will Work Together · Week 52
Agree with the people involved when you will check in, who decides what, and how a problem gets raised. - Day 6: An Honest Check-in · Week 52
Write a short, true status report on your project, share it with someone, and notice any wish to make it look better. - Day 7: A Retrospective on Your Week · Week 52
Look back on the week: what helped, what got in the way, and the one or two changes you will carry into the next project.
The Launch · 1 lessons
The finale: two charters for a project of your own.
- The Launch · Finale
Write a project charter and a team charter for a project of your own, and test each line against the year's mentors.