Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Gentle

Experts and Newcomers

In one line Experts see what newcomers miss, and newcomers ask what experts stopped asking; a team needs both kinds.

Experience is a team's richest store of knowledge and also a source of blind spots. An expert knows where the traps are, what has failed before and which shortcuts are safe. But long practice also makes some questions disappear. After years in a job, the odd step becomes normal and the clumsy form becomes invisible.

Psychologists have names for parts of this. In 1942 Abraham Luchins showed that people who had solved several puzzles one way kept using that method even when a much simpler one lay in front of them, an effect now called Einstellung, German for a fixed set of mind. In 1989 the economists Colin Camerer, George Loewenstein and Martin Weber described the curse of knowledge: once you know something, it is hard to imagine not knowing it. The Zen teacher Shunryu Suzuki put the other side in his 1970 book Zen Mind, Beginner's Mind: 'In the beginner's mind there are many possibilities, but in the expert's mind there are few.'

A newcomer has the opposite gift and the opposite weakness. In a research laboratory, a new technician may ask why samples sit on the bench for twenty minutes before freezing, and the answer may be that an old freezer once needed it. Some questions like this expose a habit that has outlived its reason. Others have a good answer the newcomer does not yet know, which is why the expert's knowledge matters just as much.

A lead's task is to keep both voices alive. Ask newcomers, early and on purpose, what puzzles them, before they stop noticing. Pair them with an expert who will explain the reason and not just the rule. And when a newcomer's question has a good answer, give it kindly, so that asking stays safe. Neither kind of knowledge should win by default.

Go deeper

At the fistula hospital in Addis Ababa that Catherine and Reginald Hamlin founded in 1974, newcomers learned beside qualified surgeons. Some had no medical background at all. Mamitu Gashe, a former patient with almost no schooling, learned by helping in the wards and assisting in the theatre, and became one of the most experienced fistula surgeons in the world. Expertise, there, was something experts willing to teach could pass to a newcomer, step by step.

Why the practicals came last

Illustration: Why the practicals came last

Lyazzat joined a secondary school in Almaty, Kazakhstan, as a chemistry teacher after ten years in a factory laboratory. At her first staff meeting, the head of science explained that all practical lessons for the older classes were packed into the last three weeks of each term, when the lab technician was free. Lyazzat asked why the technician was busy before then. The table went quiet.

Nobody quite knew. The timetable had been set years earlier, when the technician also ran stock-taking for the whole school, a job that had long since moved to the office. But the head of science, who had taught there for twenty years, saw at once what Lyazzat could not: which experiments were safe without a technician in the room and which were not. Together they spread the practicals across the term, keeping the riskiest ones for the weeks when the technician was free.

Try this today Ask the newest person you work with what puzzled them in their first week. Then find out why it is done that way.

Question 1 of 2

A new project lead in Kigali, Rwanda, wants to use both the long-serving engineers and two recent graduates on an upgrade to a water-treatment works.

Which order of steps best follows the lesson?

Question 2 of 2

Engineers at a firm in Hanoi have used one heavy steel design on twelve road bridges. Asked for a short footbridge over a canal, they draw the same heavy design, though a light timber span would serve.

Which idea from the lesson best explains this?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Experts and Newcomers.” https://quest2plan.com/learn/lesson/experts-and-newcomers. Accessed 29 November 2026.

Sources
  • Curse of knowledge — Why people who know something find it hard to imagine not knowing it, from Camerer, Loewenstein and Weber.
  • Shoshin — The Zen idea of beginner's mind, and Shunryu Suzuki's book Zen Mind, Beginner's Mind.
  • Einstellung effect — Luchins's 1942 water-jar experiments, where a practised method hid a simpler one.