Unfreeze, Change, Refreeze

In one line Old habits must be loosened before new ones can settle, though Lewin himself wrote only a few lines on it.

Ask managers how change works and someone will draw three boxes: unfreeze, change, refreeze. First the old way is loosened, often by showing people why it no longer works. Then the new way is tried. Then it is fixed in place, through routines, measures and habits, so nobody slides back. In a factory, unfreezing might mean sharing the scrap figures with the line; in an office, letting staff see how long a customer waits.

The model is credited to Kurt Lewin, a German-born psychologist who moved to the United States in the 1930s and is often called a founder of group dynamics. Yet historians who went back to his writings found only a short passage, in one of his last papers, published in 1947, the year he died, on unfreezing a group's level, moving it and freezing it at the new one. They argue he never set out a neat three-step model; the boxes were built by later writers.

What Lewin did write about at length was how groups change. In wartime studies of food habits, he reported that housewives who talked over serving unfamiliar cuts of meat and decided as a group were far more likely to serve them than women who heard a lecture. He also drew force fields: a steady state is held in place by forces pushing for change and forces holding it back. Pushing harder often stiffens resistance; weakening a hindering force lets the level move. It looks at the situation rather than blaming people, as The System, Not the Person urged.

Why did the tidy version spread? Three boxes are easy to teach, draw and remember, and they give a manager a plan. Critics say they mislead, suggesting change is one event with a stable end. Defenders reply that people do need a settled way of working afterwards, and that Lewin's own work on groups repays reading.

Weakening the forces on a sewing floor

Illustration: Weakening the forces on a sewing floor

Kerim managed a garment factory in Zarqa, Jordan, whose buyers now wanted small orders in many colours instead of long runs of one shirt. For two months he tried posters and a talk from the sales director, and the lines kept running long batches. Then he sat down with two supervisors and drew a force field. Pushing for change: buyers' penalties for late small orders. Holding it back: piece-rate pay that rewarded long runs, supervisors afraid of losing output, and a forty-minute changeover between colours.

Instead of pushing harder, Kerim worked on the hindering forces. Pay was changed to count good pieces per shift with changeovers allowed for. A team of machinists redesigned the changeover and cut it to twelve minutes. Each line's group discussed the plan and chose for itself whether to try it first. Once two lines had shown it worked, the new pay rule and changeover sheet were written into the factory's standards, and a weekly review ran for three months so the old habit did not creep back.

Try this today Pick one change you want. List what pushes it forward and what holds it back, then choose one hindering force to weaken.

Question 1 of 2

Lesedi runs a claims office in Gaborone, Botswana, and plans a new checklist. Before showing it, she puts six months of returned claims on the table and asks her team to guess how many came back for missing papers.

Which stage of the popular three-step model is Lesedi working on?

Question 2 of 2

Min-jun, a trainer in Ulsan, South Korea, is revising her slides on change after reading about the history of Lewin's model.

Complete the more accurate statement: historians who read Lewin's papers argue that ___.

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Unfreeze, Change, Refreeze.” https://quest2plan.com/learn/lesson/unfreeze-change-refreeze. Accessed 29 November 2026.

Sources
  • Kurt Lewin — Lewin's life, his force-field analysis and the debate over whether he set out a three-step model.
  • Force-field analysis — Helping and hindering forces, as Lewin framed them.
  • Make change start in a crowd — Stanford SPARQ's account of Lewin's wartime study comparing group decision with a lecture.