
Lesson · 6 min Stretch
Consent
In one line Under consent a proposal passes unless someone can show it would do harm, which lets groups decide faster than consensus.
Consensus asks whether everyone can agree. Decision by consent asks a narrower question: does anyone have a reasoned objection, a way in which this proposal would cause harm or stop them doing their part? If nobody does, it passes, even if some would prefer another. A preference is not an objection; a risk someone can explain is.
The best-known system built on consent is sociocracy. Its modern form was developed by Gerard Endenburg, a Dutch electrical engineer who ran his family's engineering firm. As a boy he had attended a school in Bilthoven run by the educator Kees Boeke, where pupils and staff made decisions together in a way drawn from Quaker practice. In the 1970s Endenburg began applying those ideas in his own company, and in 1978 he founded a centre to spread the method. In sociocracy, work is organized in circles, each setting policy for its own area by consent, and each linked to the circle above it by two people: its leader and a member it elects.
Consent groups often ask whether a proposal is good enough for now and safe enough to try. Decisions carry a date for review, so an imperfect plan can start and be improved, and an objection is answered by changing the proposal rather than by arguing until everyone is persuaded. That is why consent is usually quicker than consensus. Sociocracy also fills roles by consent, after open nominations.
The strongest case for consent is speed without silencing anyone, since every member can still stop a harmful plan. The strongest case against is that the line between a reasoned objection and a strong preference is hard to draw, and whoever judges it holds real power; a quiet member may also hesitate to call a worry an objection. Earlier in the course, Teams That Run Themselves looked at groups that manage their own work, and consent is one way such groups decide.
A second shift on the sanders

Gilang coordinates a cooperative furniture workshop in Jepara, Indonesia, whose finishing circle of nine carvers decides its own working methods by consent. He proposed a second shift on the sanding machines, so that a large order of hotel chairs could be finished in time. He asked first for questions, then for reactions, then for objections.
One carver objected: the dust extraction could not cope with longer running hours, and the evening shift would breathe the dust. That was a reasoned objection about harm, not a dislike, so the circle changed the proposal. The second shift would start only once a hired extraction unit was in place, and would run for two months before a review. Another carver said she would rather not work evenings; that was a preference, and the rota let her keep to days. The amended proposal passed in forty minutes.
Try this today When your group next debates a plan, ask: is it good for now, and safe to try until we review it? See whether the debate shortens.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Consent.” https://quest2plan.com/learn/lesson/consent. Accessed 29 November 2026.
Sources
- Sociocracy — Circles, double links and decision by consent, and the phrase good enough for now, safe enough to try.
- Gerard Endenburg — The Dutch engineer who developed the sociocratic method in his family firm.