The Pyramid Crews

In one line The Giza pyramids were raised by fed, housed and named crews, organized in groups inside groups.

For centuries the popular story was that the pyramids of Giza were built by slaves under the whip. Digging over the last few decades tells a different story. South of the pyramids, a team led by the archaeologist Mark Lehner uncovered a planned town from Egypt's Fourth Dynasty, about 4,500 years ago, with long galleries where workers slept, bakeries, breweries, kitchens and a copper workshop. Animal bones show that thousands of people ate beef, mutton and goat as well as fish. Nearby, workers were buried in their own tombs, with bread and beer for the afterlife.

The crews were organized in layers. Marks daubed on the stones name the gangs: one called itself the Friends of Khufu, another the Drunkards of Menkaure. Each gang was split into five divisions, and those into smaller working groups. Most Egyptologists now think the labour came in rotating turns: people served for a spell and went home, in a land where almost everyone owed service to someone above them. Papyri found in recent years at Wadi al-Jarf, on the Red Sea, hold the logbook of an inspector named Merer, whose crew of about forty men spent months ferrying limestone from the quarries at Tura to Giza.

What did this take? Grain and cattle arriving every day, bread baked in standard pots, beds, tools, boats, and people keeping count. Feeding the crews was as much a part of the work as cutting stone. And a name gave each small group something to belong to and to be proud of.

Much is still unknown: how many people worked at once, how the stones were raised, and how free those who served really were. The honest answer to several big questions is that we are not sure.

Go deeper

Estimates of the workforce show how much rests on assumptions. Herodotus, writing some two thousand years after the building, was told of gangs of 100,000 men working three-month shifts. A study in 1999 by construction planners working with Egyptologists, Lehner among them, put the average workforce for the Great Pyramid at about 13,200, with a peak of perhaps 40,000. The galleries Lehner excavated look built for a rotating crew of a couple of thousand. Each figure depends on how long the work took and how the stones were moved.

Three hundred volunteers

Illustration: Three hundred volunteers

Abena coordinates the rebuilding of a flooded primary school near Bolgatanga, in northern Ghana. On the first Saturday, three hundred volunteers turned up at once. They stood in one large crowd while a few people shouted instructions, lunch ran out by noon, and by evening half had gone home and not come back.

For the second Saturday, Abena split the crowd into six crews of about fifty, each with a lead, and each crew into small groups of eight who would work side by side all day. She let every crew pick its own name, and the Mango Tree crew and the Harmattan crew were soon arguing about who laid blocks more neatly. She also put the kitchen in the plan, with its own crew, its own budget and a cooking fire lit at dawn. Most of the volunteers came back the next week, and many brought friends.

Try this today Think of a team you belong to. Count the layers between you and the whole job, and ask whether your smallest group has a name.

Question 1 of 2

A fruit cooperative near Chiang Rai, Thailand, takes on 600 seasonal pickers. Last year they worked as one great crowd, and nobody knew who answered to whom.

Which change follows the way the Giza crews were organized?

Question 2 of 2

Bekzod's plan for a two-month canal repair in the hills near Osh, Kyrgyzstan, lists every load of cement, every machine and every shift for its 200 workers.

The plan says nothing about where the workers will sleep or eat. Why is that a flaw?