Lesson · 6 min Stretch
Departments by Skill
In one line Grouping people by skill builds deep expertise, but leaves work that crosses departments with no single owner.
Walk through most factories, universities or ministries and you find people grouped by what they know. Engineers sit with engineers, accountants with accountants, chemists in the chemistry department. This is the functional organization, the oldest way of arranging a large body of work, and it rests on the division of work that Henri Fayol praised, as Fayol's Principles described. Its strengths are plain: people learn from colleagues who do the same job, a head who understands the craft judges their work and plans their careers, and the organization builds deep skill in each field.
Projects in such an organization borrow people. A manufacturer designing a new pump needs designers, buyers, production engineers and sales staff, and each stays in their own department, lent to the project for some hours a week. For work that sits mostly inside one department, this suits well. The trouble comes with work that needs every department at once. Each head guards their people's time for their own priorities, questions climb up one department and down another, and nobody below the top is in charge of the whole. A problem that falls between departments waits, since each can say that it did its part.
The business historian Alfred Chandler, in his 1962 book Strategy and Structure, traced how large American firms such as DuPont and General Motors moved in the early 1920s from a central office running functional departments to separate divisions for each line of business, as their range of products grew. His conclusion was that an organization's arrangement develops in response to its strategy, so a structure built for one kind of work strains when the work changes.
Defenders of departments by skill say no other arrangement grows expertise as well or keeps standards as high. Critics say it serves the departments better than the customer. The rest of this week looks at arrangements built to fix its weakness, each with costs of its own.
The course that belonged to nobody

Gifty, a lecturer in civil engineering at a university in Kumasi, Ghana, was asked to launch a new master's course in water supply. It needed teaching from four departments: civil engineering for pipes and pumps, chemistry for water testing, public health for disease, and economics for tariffs. Each head agreed warmly at the first meeting. Then the chemistry head gave the teaching to a junior lecturer who was already overloaded, public health timetabled its module against the civil engineering one, and nobody would pay for a shared laboratory, since it sat in no department's budget.
Gifty had no authority over any of them. After a term of chasing, she took the dean a one-page list of the decisions that fell between departments: the timetable, the laboratory and who would mark the final projects. The dean set up a course committee with a small budget of its own and asked each head to commit one named lecturer for two years. Gifty noticed that the chemistry teaching was the best on the course: the department knew its subject far better than any newcomer could.
Try this today Pick one piece of work that crosses departments where you are, and ask who below the top is in charge of all of it.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Departments by Skill.” https://quest2plan.com/learn/lesson/departments-by-skill. Accessed 29 November 2026.
Sources
- Organizational structure — Functional, divisional and matrix structures, with the strengths and weaknesses of each.
- Multidivisional form — How DuPont and General Motors moved from functional departments to divisions in the early 1920s.
- Alfred D. Chandler Jr. — The business historian whose Strategy and Structure (1962) linked a firm's organization to its strategy.