
Lesson · 6 min Stretch
Keep Teams Together
In one line Teams that stay together learn each other's ways; reshuffling people costs more than it seems, though a few newcomers help.
Most people would bet on a rested crew over a tired one. A NASA study published in 1986 suggested otherwise. Researchers put twenty airline crews through a demanding flight in a simulator: half had just finished three days of short-haul flying, the other half had had at least three days off. The tired crews were rated as performing better, and they talked to each other more. J. Richard Hackman, who studied airline crews for years, drew the lesson: in his account, fatigued crews who had worked together made about half as many errors as rested crews who had not flown together before.
Hackman made stable membership one of the conditions for a good team, described in The Conditions for a Good Team. Newness, he argued, is a liability: crews need time to learn each other's habits, signals and strengths. Airlines reshuffle pilots to keep aircraft and staff fully used; an airline planner once estimated for him that two pilots paired on one trip would wait 5.6 years to fly together again.
Projects pay the same price. Each time a person moves between teams, someone must learn how the newcomer works, shortcuts the old team shared are lost, and nobody is sure who knows what. People split across several projects pay it every week.
Is there a case for rotation? Teams can grow comfortable and closed to new views, and rotation spreads knowledge, trains people and avoids depending on one team. Hackman found little evidence that teams go stale, with one exception: research and development teams seemed to need fresh members, but only about one every three to four years. A sensible balance keeps a stable core and brings in new people steadily, rather than reshuffling everyone at once.
Go deeper
Accident records point the same way. A safety study by the United States National Transportation Safety Board, published in 1994, looked at 37 major airline accidents in which the flight crew played a part. Of the 15 where the information was available, 11, or 73 per cent, happened on the first day the captain and first officer had flown together, and Hackman added that many came on the very first flight. The numbers are small, and a first day can be hard for other reasons, but the pattern matches the simulator study.
The same four on the orthopaedic list

Pranee schedules operating-theatre staff at a hospital in Chiang Mai, Thailand. For years the rota put nurses wherever there was a gap, so the orthopaedic surgeon might work with six different scrub nurses in a fortnight. Lists started late while nurses hunted for the instruments he preferred, and twice an implant of the wrong size was opened and wasted.
Pranee tried a fixed team for the orthopaedic list: the same surgeon, anaesthetist and two nurses for three months. Within weeks the team had a rhythm. The nurses laid out trays before being asked, and the surgeon and anaesthetist agreed changes with a glance. Late starts fell from most days to about one a week. To keep knowledge spreading and holidays covered, Pranee now moves one new nurse into each team every few months, one at a time.
Try this today Count how many times the membership of your main team changed in the last three months, and note what each change cost.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Keep Teams Together.” https://quest2plan.com/learn/lesson/keep-teams-together. Accessed 30 November 2026.
Sources
- Why Teams Don't Work (Harvard Business Review interview) — Hackman on newness as a liability, the NASA crews, the accident records and team size.
- Cockpit Teamwork (Harvard Magazine) — An account of Hackman's research on airline crews and the case for keeping crews intact.
- Crew factors in flight operations, part 3 (NASA) — The NASA report on tired and rested crews in a full-mission simulator.