
Lesson · 6 min Stretch
Promises Made in Public
In one line Professional oaths and rings enforce nothing by themselves, but they mark a duty and give colleagues words to hold each other to.
Professions bind their members with public promises. Doctors have long sworn versions of the Hippocratic Oath; in 1948, after the trials of Nazi doctors, the World Medical Association adopted the Declaration of Geneva. In its current form doctors pledge, among other things, to put the patient's health first, to keep confidences even after the patient has died, and not to use their knowledge to violate human rights, even under threat.
Canadian engineers have their own. In 1922 H. E. T. Haultain, a mining professor at the University of Toronto, proposed an ethical oath for engineers and asked Rudyard Kipling to write it. The first Ritual of the Calling of an Engineer was held in Montreal on 25 April 1925. Graduates promise not to let poor work or faulty material pass, and receive an iron ring for the little finger of the working hand, where it brushes the page as they write. Many link the ring with the Quebec Bridge, whose collapse opened this week in When Schedule Pushes Safety, and some say the first rings were cut from its steel; in fact war veterans made them at a Toronto military hospital. The United States took up a similar ring in 1970.
What do such promises add? Sceptics note that an oath enforces nothing: licences, codes and courts do that, and the Quebec inquiry found errors of judgement, not greed, which no ring would have corrected. Supporters answer that a public promise marks the moment a person accepts a duty, gives colleagues words to hold each other to, and is there at the moment of pressure, as the ring scrapes across a drawing.
Project leads take no common oath. A personal code can still help if it is short and specific: what you will report, what you will not sign, when you will halt work, how you will treat bearers of bad news. Shared with the team, it becomes a promise they can hold you to.
Line two of the code

Siham is a structural engineer in Casablanca, Morocco, made lead for the first time on a new secondary school. In her first week she writes five lines on a card and reads them to the team: she will report what she believes, sign nothing she has not checked, halt work she thinks unsafe, answer bad news with thanks, and give credit by name. A few of the older engineers smile at the ceremony of it.
Two months later, on the evening before a large concrete pour, the contractor's manager asks her to sign the reinforcement inspection so the trucks can be booked. She has not seen the second floor's steel. Before she can answer, a junior engineer on her team says quietly, 'Line two.' Siham laughs, goes up with a torch, and finds a row of missing bars at the edge of a beam. The pour goes ahead the next afternoon instead of the morning.
Try this today Write three lines you would be willing to promise your team as their lead. Make each specific enough that someone could tell if you broke it.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Promises Made in Public.” https://quest2plan.com/learn/lesson/promises-made-in-public. Accessed 29 November 2026.
Sources
- Iron Ring — The Ritual of the Calling of an Engineer: Haultain, Kipling, the first ceremony in 1925, and the myth about Quebec Bridge steel.
- Declaration of Geneva — The World Medical Association's pledge of 1948, a modern restatement of the Hippocratic Oath.
- Order of the Engineer — The American ring ceremony begun in 1970, modelled on the Canadian ritual.