
Lesson · 6 min Stretch
A Few Simple Rules
In one line A clear purpose and a handful of firm rules let people adapt when plans break; too many rules stop them thinking.
Detailed instructions work until the world changes, and then they leave people stuck. The alternative is to give a clear purpose and a few firm rules, and to let people work out the rest. Armies call the first part commander's intent: a short statement of what the operation is for and what success looks like, so that juniors can act sensibly when the plan breaks. It grew from the Prussian army's mission-type tactics in the nineteenth century, and earlier in the course, Deciding With No Time showed it at work in a crisis.
Simple rules can produce surprisingly rich behaviour. In 1986 the computer scientist Craig Reynolds made a program called Boids in which each simulated bird followed three rules: keep a little apart from neighbours, steer the way they are heading, and move towards the middle of the group. With no leader bird, the screen filled with lifelike flocks that split round obstacles and joined again.
A hospital can work the same way. A ward might keep a few rules that everyone knows by heart, such as checking each patient's identity before any drug, handing over in person at each shift, and letting anyone stop a procedure if they fear for the patient. Because they are few, they are remembered and kept. Pile on a rule after every incident and something else happens: rules start to clash, nobody can hold them all in mind, and people follow the letter while losing sight of the purpose. They stop thinking because the rulebook seems to have done the thinking for them.
There is a strong case the other way. Routine, high-risk tasks such as sterilizing instruments need exact steps, as The Humble Checklist showed. The balance is between steps for the clear parts of the work and purpose for the rest.
Go deeper
The Brazilian paediatrician Zilda Arns built a national network on a few simple rules. In the Pastoral da Criança, which she founded in 1983, each volunteer leader followed a handful of neighbouring families, weighed the children every month, taught home rehydration for diarrhoea, and encouraged breastfeeding and vaccination. Leaders sent a few numbers upward each month and decided most other things locally, which let tens of thousands of volunteers work to one purpose without detailed orders.
Across the river by Friday

Boubacar commands a company of army engineers sent to Kolda, Senegal, after a flood swept away the road bridge. His plan was to lift a temporary steel bridge into place with a crane. Before leaving camp he gave his lieutenants the intent in three lines: by Friday night, lorries carrying grain must be able to cross the river; nobody works in the water without a line; do not cut the trees beside the mosque.
On Wednesday the crane broke down, and the radio to headquarters failed with it. Boubacar was at the far end of the site. Without waiting for him, his lieutenants worked from the intent. They used the old ford downstream, lashed fuel drums under timber decking to make a raft, and roped every soldier who waded in. On Friday evening the first grain lorry crossed on the raft. The steel bridge went in the following week, once the crane was repaired.
Try this today Write your team's purpose in one sentence and its three most important rules. If you need more than three, ask which ones matter most.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “A Few Simple Rules.” https://quest2plan.com/learn/lesson/a-few-simple-rules. Accessed 29 November 2026.
Sources
- Intent (military) — What commander's intent states and why it supports initiative.
- Boids — Craig Reynolds's 1986 flocking program and its three rules.
- Mission-type tactics — The Prussian roots of setting the aim and leaving the means to juniors.