Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Stretch

Getting Better at Something

In one line Feeling yourself improve is a strong motivator, and a lead can build growth into the work itself.

Few feelings at work are as strong as noticing that you can now do what you could not do last month. Self-determination theory calls the need behind it competence. For a lead, the question is how to build that growth into work that also has deadlines.

The Swedish psychologist K. Anders Ericsson spent his career studying how experts become expert. In a 1993 study with Ralf Krampe and Clemens Tesch-Römer, he asked violin students at the Music Academy of West Berlin to estimate how much they had practised alone. By the age of twenty, the best of them had practised on average more than 10,000 hours, far more than those training to teach music. Ericsson's key word was deliberate: practice aimed at a particular weakness, a little beyond what you can already do, with quick feedback and usually a teacher's design. Repeating what you already do well brings far less.

The writer Malcolm Gladwell later turned the figure into a '10,000-hour rule', and Ericsson objected. The number was an average, not a threshold; half of the best group had not reached it; and the hours needed differ widely between fields. Later reviews found that practice explains a good part of the differences in skill in games and music, and much less in many jobs.

Apprenticeships worked on the same principle long before the research. A master set tasks just beyond the learner's reach, watched, corrected and gradually handed over more. A project lead can do the same: give a stretch task with support close by, pair a newer person with an experienced one, and make feedback quick and specific rather than saving it for a yearly review.

Go deeper

Ericsson's own account of what makes practice deliberate had several parts. The task has a clear goal that the learner understands. It is a little harder than what the learner can already do. Feedback comes quickly, so mistakes can be corrected while the attempt is fresh. It can be repeated, with small changes, until it improves. And it is usually designed by a teacher who knows where the learner's weak points lie. Much of what people call practice, at work and at home, has only one or two of these parts.

At the fistula hospital in Addis Ababa, Catherine Hamlin and her husband built growth into the work. Mamitu Gashe came as a patient in 1962, stayed on to help on the wards, and from 1974 was taught surgery a step at a time until she became a senior surgeon who trained doctors from other countries.

Brackets before pump frames

Illustration: Brackets before pump frames

Somsak is the foreman of a small engineering workshop in Rayong, Thailand. When a school leaver joined as an apprentice, the old habit would have been months of sweeping and watching. Somsak set out a sequence instead: first, cuts and welds on scrap, each checked by him within the hour; then simple brackets for a real order, with him inspecting the first few pieces and showing exactly where a weld had run too hot.

By the third month the workshop won an order for irrigation pump frames for a farmers' cooperative. Somsak gave the apprentice one part of it that stretched her: the base plates, which had to sit flat within a millimetre. He paired her with the workshop's most careful welder for the first week and checked her plates every afternoon. Two plates had to be redone. The rest passed inspection, and at the end of the job she asked what she could learn next.

Try this today Pick one skill you want to improve this month. Name the part you find hardest, and find someone who could watch you do it and say what to change.

Question 1 of 2

Yakubu teaches carpentry at a technical college in Tamale, Ghana, and wants his students' joints to improve before their final assessment.

Which practice plan is closest to deliberate practice?

Question 2 of 2

A training manager in Johor Bahru, Malaysia, tells new staff that 10,000 hours of practice will make anyone an expert in any job.

How would Ericsson have answered this claim?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Getting Better at Something.” https://quest2plan.com/learn/lesson/getting-better. Accessed 29 November 2026.

Sources
  • K. Anders Ericsson — His life, the 1993 study of deliberate practice, and his objections to the 10,000-hour rule.
  • Practice (learning method) — What makes practice deliberate, and later reviews of how much it explains in different fields.
  • Catherine Hamlin — The fistula hospital in Addis Ababa and the surgeons it trained.