
Lesson · 6 min Steady
The Study That Found More Errors
In one line A count of reported mistakes measures both the mistakes made and people's willingness to own up.
In the early 1990s Amy Edmondson, then a doctoral student at Harvard, joined a study of medication errors led by the doctors Lucian Leape and David Bates. Trained investigators combed the records of eight units in two teaching hospitals for six months, counting drug errors. Edmondson surveyed the staff about their teams, with questions adapted from a survey J. Richard Hackman had built for airline crews. She expected the better-led units to make fewer errors.
The data said the opposite. The units with the strongest coaching from nurse managers and the best relationships had the highest rates of detected errors. Rather than drop the result, she asked what the number measured. A detected error rate mixes two things: how many errors are made and how many come to light. Perhaps in the well-led units people felt free to admit mistakes, while elsewhere errors went unspoken. To test this, another researcher, not told the error figures, visited each unit and ranked it on how openly people talked about mistakes. The ranking matched the error rates closely, with one exception.
She published the study in 1996, and in 1999 tested the idea in 51 work teams at a manufacturing company, naming it team psychological safety: a shared belief that the team is safe for interpersonal risks, such as asking a question or admitting an error. Teams with more of it did more learning, and learning went with better performance.
The hospital study had limits she stated herself: eight units is a small sample, and it could not show that the open units made fewer real errors. Its lasting lesson is that any measure built on what people choose to tell you also measures how safe they feel telling it.
Go deeper
Edmondson's puzzle has relatives well beyond hospitals. A rise in reported cases can mean more cases or better reporting: recorded crime tends to rise when a city makes reporting easier, and recorded rates of a disease climb when testing spreads. The gap between what happens and what gets recorded is a problem of measurement, and the usual remedy is the one she used: find a second measure that does not depend on the same people choosing to speak.
The rise in reports

Iman is the quality lead at a hospital in Irbid, Jordan. Six months after the surgical wards began using a simple near-miss form, reports have tripled, and a board member asks whether the wards have become careless. The figure is about to go into the annual report as a warning sign.
Iman checks two measures that do not depend on anyone choosing to report: patient harm found when pharmacists audit a sample of charts each month, and complaints about medication. Both are flat. She also finds that most new reports are near misses caught before they reached a patient, the kind that used to go unwritten. In the annual report she writes that reporting has risen while harm has not, and that the wards should be thanked for it rather than warned.
Try this today Look at one number your team tracks that depends on people reporting things. Ask what would make it rise even if things got better.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “The Study That Found More Errors.” https://quest2plan.com/learn/lesson/the-study-that-found-more-errors. Accessed 29 November 2026.
Sources
- Edmondson (1996): Learning from mistakes is easier said than done (Psychological Safety Field Guide) — A summary of the hospital study: eight units, six months of error data, the survey and the blind observer.
- Secret Errors Kill (Harvard Magazine) — Edmondson's work in the drug-error study led by Leape and Bates, and her reading of detected error rates.
- Psychological safety (Wikipedia) — The idea's history, Edmondson's 1999 study of work teams and later research.