
Lesson · 6 min Stretch
Learning From Your Own Work
In one line Experience teaches only when you stop to reflect on it; a short journal of decisions and results turns years into learning.
Two leads can each have ten years of experience, and one may have learned ten years' worth while the other repeated one year ten times. The difference is reflection. David Kolb, an American educational theorist, drew on John Dewey, Kurt Lewin and Jean Piaget in his book Experiential Learning (1984) and described learning as a cycle: a concrete experience, reflection on what happened, a general idea formed from it, and a trial of that idea in a new situation, which becomes the next experience.
A short journal is one of the simplest ways to turn the cycle. For each decision that matters, write a few lines at the time: what you decided, what you expect to happen and why. Later, add what did happen and what you will do differently. Writing the expectation first is the key step, because memory quietly rewrites it once the result is known, and we come to feel we saw it coming. It works like The After-Action Review for one person: what was meant to happen, what did, why, and what next.
Reflection alone has limits. We remember our successes more kindly than our failures and explain away what does not fit, so a journal works best when checked against evidence and against what others see, as Seeing Yourself suggested at the start of this week. Ten minutes a week is enough; the habit matters more than the length.
The week's tools fit different needs. Asking others reveals blind spots, and humility keeps you open to what they say. A steady pace and an eye on workload guard against burnout. A time record shows where your week goes, and a journal shows what your decisions taught you.
Go deeper
The Brazilian educator Paulo Freire called this loop praxis: action and reflection on it, each feeding the other. In Pedagogy of the Oppressed (1968) he warned that action without reflection becomes mere activism, and reflection without action mere talk. His literacy circles applied the idea to groups: people looked together at their own work and lives, named what they saw, and then acted on it.
A notebook in Samarkand

Ozoda teaches mathematics at a secondary school in Samarkand, Uzbekistan. At the start of the year she began a small notebook. Every Friday she wrote down two or three decisions from the week, what she expected each to do, and why. In October, for instance, she let a struggling class use calculators in a test, expecting less anxiety and better marks.
At the end of term she read the notebook through. The marks had risen, but the same class could not do the mental arithmetic the next topic needed. Other entries showed the same pattern: her quick fixes helped that week and cost her the next month. Ozoda now adds one line to each entry, 'What will this do in a month?', and each half-term she goes through the notebook with a colleague who teaches the class after her.
Try this today Write three lines about a decision you made today: what you expect to happen, why, and the date you will check.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Learning From Your Own Work.” https://quest2plan.com/learn/lesson/learning-from-your-own-work. Accessed 29 November 2026.
Sources
- Experiential learning — Kolb's four-stage cycle and the thinkers he drew on.
- Reflective practice — Reflection in teaching, nursing and other work, with its limits.
- David A. Kolb — The educational theorist behind the experiential learning model.