Lesson · 6 min Stretch
The Hiding Hand
In one line Hirschman said that underrating difficulty gets good projects started; Flyvbjerg replies that most find only higher costs.
The economist Albert Hirschman, born in Berlin in 1915, spent years studying development projects. In his book Development Projects Observed (1967) he made a surprising claim, which he called the principle of the Hiding Hand. If people saw in advance every difficulty a project would bring, they would often refuse to start it. Because the difficulties are hidden, they begin; and once committed, they find creative ways around problems they could never have planned for. In his essay on the idea he wrote that "creativity always comes as a surprise to us".
His best-known case was the Karnaphuli paper mill in East Pakistan, now Bangladesh, built to make paper from local bamboo. Soon after it opened, most of the bamboo flowered and died. Instead of closing, the managers found other raw materials and kept the mill running. To Hirschman, ignorance of the risk had been useful: it got a valuable project started.
Bent Flyvbjerg tested the idea against a large set of projects, about two thousand of them, by asking how often benefits outran costs. He found that about one project in five fitted Hirschman's story. In the other four, costs rose and no saving creativity arrived. With the legal scholar Cass Sunstein he called this the Malevolent Hiding Hand. Earlier in the course, Over Budget, Over Time, Over and Over set out the record of overruns behind his view.
Hirschman's defenders reply that the test misses his point. He wrote about learning in poor countries, where a project's real gain may be the skills and institutions it builds, not its budget. Some worthwhile projects would never pass an honest estimate. The question each side leaves you is this: when you underrate a task, are you making room for creativity, or just postponing the bill?
Go deeper
The debate has its own critics on both sides. Some defenders of Hirschman argue that Flyvbjerg's test treats a book about learning as a forecast to be checked, which they call a straw man. Flyvbjerg answers that the Hiding Hand does happen, in about a fifth of projects, but is not typical, so it is a poor guide to planning; he also notes that the paper mill's later history was troubled.
The reservoir that leaked

Delfino chairs a farmers' cooperative in the hills of Oaxaca, Mexico. In a dry year the members voted to build a small reservoir to water their maize and beans, expecting six months of weekend work and a modest loan. Nobody had tested the soil.
The first winter the reservoir leaked through its clay floor, and the cost of a liner was more than the whole loan. Delfino feared the project was finished. Then an older member remembered how her grandparents had sealed ponds with layers of local clay packed down by cattle. The cooperative tried it on one corner, then the whole floor, and the reservoir held. It had taken two years, not six months, and the loan had doubled. At the annual meeting some members called it the best thing the cooperative had done; others said they would never have voted for it had they known.
Try this today Recall a task that proved harder than you expected. Ask whether you would have started it if you had known.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “The Hiding Hand.” https://quest2plan.com/learn/lesson/the-hiding-hand. Accessed 29 November 2026.
Sources
- Hiding hand principle — Encyclopedia article on Hirschman's principle and the Malevolent Hiding Hand.
- Albert O. Hirschman — The economist's life and works, including Development Projects Observed.
- Planning Fallacy or Hiding Hand: Which Is the Better Explanation? — Flyvbjerg's reply to Hirschman's defenders, in World Development.