Eight Steps and Their Critics

In one line Kotter's eight steps name the usual mistakes in leading change, but they are a guide built on experience, not a law.

Change efforts tend to fail in the same few ways. That was the claim of John Kotter, a professor at Harvard Business School, in 'Leading Change: Why Transformation Efforts Fail', published in the Harvard Business Review in 1995. Drawing on more than a hundred companies he had watched try to change, he named eight common errors, and turned them round into eight steps, which his book Leading Change set out at length the next year.

In brief: create a sense of urgency; build a guiding coalition with enough standing to lead; form a vision; communicate it again and again; remove obstacles so people can act on it; plan for early, visible wins; use that credibility to change more, rather than declaring victory too soon; and anchor the new ways in the culture so they outlast the people who brought them. In a city water service, urgency might come from publishing leak figures; in a hospital, from a review of avoidable falls. Earlier in the course, Building a Coalition showed how the second step is done, one conversation at a time.

The steps are widely taught, and they have critics. Some say they are too linear: real change loops back, and the steps overlap. Some say they are too top-down, treating staff as people to be moved rather than partners who may know better. And the model rests on Kotter's own observation, not controlled research. A review of the studies found support for most steps taken one at a time, but no study testing the whole sequence, and much of the evidence came from Kotter's own work.

Defenders answer that a model need not be a law to be useful. The steps name mistakes leaders really make, such as skipping the coalition or relaxing after the first success. Perhaps the fairest use is as questions to ask, not a recipe to follow.

Eight steps on a night shift

Illustration: Eight steps on a night shift

Kamande, the nursing director of a county hospital in Kisumu, Kenya, wanted every shift handover done with a written checklist after two patients missed doses in one month. He followed the steps closely. He shared the incident reports at a ward meeting, built a small coalition of a senior nurse, a pharmacist and a junior doctor, and summed up the aim in a line: no patient handed over without a checked list. The day staff on one ward tried it first, and missed doses fell.

Then the plan stalled. The night nurses, who had not been asked, found the checklist far too long to complete at three in the morning with half the staff, and quietly stopped using it. Kamande went back a step. He invited two night nurses into the coalition and they cut the list from twenty items to eight. The second version spread to four wards within two months. He came to treat the steps as a loop rather than a ladder.

Try this today Take a change you are part of. Which of the eight steps has been skipped, and which one is being treated as finished too soon?

Question 1 of 2

Kenan's water utility in Irbid, Jordan, has replaced meter readers' paper books with handheld readers. Three districts switched smoothly, and the board now wants to call the project complete and move the team to other work.

Which of Kotter's errors is the board about to make?

Question 2 of 2

Lalita, a planner in a city health department in Pune, India, lists four actions for moving clinics to booked appointment slots: (1) anchor the new booking in staff routines and training, (2) bring clinic heads and a respected doctor together to lead it, (3) show how long patients now wait, (4) open booking at two clinics and publicize the result.

Which order follows Kotter's sequence?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Eight Steps and Their Critics.” https://quest2plan.com/learn/lesson/eight-steps. Accessed 29 November 2026.