Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Steady

Everyone Owns Quality

In one line Ishikawa put quality in the hands of the people doing the work, with small circles and a fishbone diagram to trace causes.

Kaoru Ishikawa, a professor of engineering at the University of Tokyo and a leading member of the Union of Japanese Scientists and Engineers, held that quality could not be left to specialists. People who do the work every day, once trained to study it, notice problems that no inspector or manager can see.

In 1962 he and JUSE launched quality circles: small groups of workers from one area, often led by their supervisor, who meet regularly to choose a problem in their own work, study it with simple tools and propose or make a fix. The idea spread through Japanese industry and was later copied in many other countries.

The tool most linked to his name is the cause-and-effect diagram, which he made popular in the 1960s and which is called a fishbone for its shape. The problem goes in a box at the head. Main bones slant back from the spine, one for each kind of cause: people, methods, machines, materials, measurement and surroundings, or whatever headings fit the work. The group adds possible causes to each bone, then asks why each one happens and adds smaller branches. The drawing shows possibilities, not proof, so the likely causes are checked with data or by going to look before anyone acts.

Circles worked well in many Japanese firms and faded in many Western ones by the end of the 1980s. Accounts of the failures describe circles set up by order, without training, whose proposals managers ignored, or which turned into fault-finding sessions. Defenders point to research finding that circles with strong backing from senior managers solved more problems. Whether a circle succeeds seems to depend less on the meetings than on what the organization does with what they find.

Go deeper

Ishikawa held that a handful of simple methods, which most workers could learn, would settle most everyday problems. In Japan these came to be taught as the seven basic tools of quality, a name he may have introduced: the fishbone diagram, check sheets for tallying, Pareto charts, histograms, scatter diagrams, control charts, and stratification, which means splitting data by source to see where a problem lives. His Guide to Quality Control (1968), a book of such methods, included one of the first printed Pareto charts.

Waiting to go home

Illustration: Waiting to go home

Nakato is the sister in charge of a medical ward at a hospital in Jinja, Uganda. The patients told they can go home in the morning often leave after dark. One Tuesday at the change of shift she gathers a nurse, a porter, a junior doctor, the ward clerk and a pharmacist, tapes brown paper to the wall and draws a fishbone with 'Discharge takes over six hours' at its head. The bones fill quickly: letters written only after the ward round, one doctor allowed to sign them, nobody recording when a patient is ready, and a pharmacy at the far end of the building.

The medicines bone is the most crowded, but Nakato does not act yet. For two weeks the clerk notes when each patient is declared ready and when their take-home medicines arrive. The times confirm it: the wait for medicines is most of the delay. The pharmacy agrees to prepare medicines the evening before for planned discharges, and the clerk keeps recording to see whether the change holds.

Try this today Write a problem you keep meeting at the head of a fishbone, with six bones, and ask a colleague who does the work to add causes.

In the Toolkit, step by step: Fishbone diagram →

Question 1 of 2

Orazbek leads a group at a flour mill in Kostanay, Kazakhstan, looking into why filled sacks keep splitting on the way to customers.

In which order should the group build and use its fishbone?

Question 2 of 2

A garment factory in Gazipur, Bangladesh, draws a full fishbone for a seam fault, picks the cause mentioned most often in the meeting, and orders new sewing machines the next morning.

What went wrong in the way the factory used the diagram?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Everyone Owns Quality.” https://quest2plan.com/learn/lesson/everyone-owns-quality. Accessed 29 November 2026.

Sources
  • Kaoru Ishikawa — His career at the University of Tokyo and JUSE, quality circles from 1962, and his books.
  • Ishikawa diagram — How the cause-and-effect diagram is drawn, its usual headings, and its limits.
  • Quality circle — Origins in Japan, spread and decline abroad, and research on what made circles succeed.