
Toolkit · Learning
Fishbone diagram
A diagram, devised by the Japanese quality engineer Kaoru Ishikawa in the 1940s, that lays out all the possible causes of one problem by kind, so a team looks wider than its first guess.
Who takes part
Team People who do the work Facilitator
How to do it
- Write the problem at the head
Draw a long arrow pointing right on a wall chart or large sheet, and write the problem in a box at its point. Keep it specific and measurable.
- Draw the main bones
Add slanting lines for the main kinds of cause, such as people, methods, machines and tools, materials, measurement and surroundings. Choose kinds that fit your work.
- Add causes to each bone
Ask what under each heading could lead to the problem, and write each idea as a small branch. Invite the people who do the work, who know the details.
- Go deeper on branches
For each cause, ask why it happens, and add smaller branches. A crowded bone shows where to look first.
- Choose the likely causes
Mark the few causes the team thinks matter most, then check them with data or by looking before you act. The diagram shows possibilities, not proof.
- Act and check
Fix the causes that are confirmed and watch whether the problem shrinks. Keep the diagram to compare if it returns.
Where it goes wrong
- The diagram is filled in and treated as the answer, though no cause on it was ever checked.
- Every bone gets the same number of causes because the team wants a tidy picture.
- It is drawn by managers alone, without the people who see the problem every day.
When to skip it
When a problem has one plain cause that everyone can see, the diagram is ceremony. Fix it and spend the time saved elsewhere.
The one-page template
The headings to put on one sheet. Print it with room to write, or copy them into whatever your team already uses.
- The problem (at the fish's head)
- People
- Methods
- Machines and tools
- Materials
- Measurement
- Surroundings
- Causes to check first
- How we checked, what we found
Cite or share this page
A plain reference you can paste into notes or an essay:
Quest2Plan. “Fishbone diagram.” https://quest2plan.com/learn/ideas/toolkit/fishbone. Accessed 29 November 2026.