Technical and Adaptive Problems

In one line Technical problems can be solved by experts; adaptive ones need the people with the problem to change.

Some problems have known answers. A pump breaks and a mechanic fixes it; a bridge needs a stronger beam and an engineer works one out. Ronald Heifetz, a psychiatrist who teaches leadership at Harvard's Kennedy School, calls these technical problems: the knowledge exists, and someone with authority can apply it. In his 1994 book Leadership Without Easy Answers he set beside them a second kind, adaptive challenges, where no expert holds the fix, because the problem lives in people's own habits, values and loyalties.

One of his illustrations is a heart patient. A surgeon can perform a bypass, which is technical work. But if the patient goes home and changes nothing about how he eats, smokes and moves, the operation buys little time, and changing how one lives is work only the patient can do. Many problems mix both: a town may need a new water main and also need households to stop tapping it illegally.

Heifetz argued that the most common failure of leadership is treating an adaptive challenge as a technical one: bringing in an expert, announcing a programme or issuing a rule while the people affected carry on as before. People often prefer this, because the technical fix spares them a painful loss. So leading, for him, means giving the work back to the people who have the problem, keeping the pressure high enough that they face it but not so high that they give up, and stepping back now and then to see the pattern, which he called getting on the balcony.

The distinction is widely used in public health, development and government, and it gives a leader a useful first question. Its evidence is mostly cases and teaching experience rather than controlled studies, and critics note that deciding which kind a problem is can itself be argued over.

Concrete that changed nothing

Illustration: Concrete that changed nothing

Ravshan is the engineer on an irrigation upgrade in Khorezm province, Uzbekistan. The canals leaked, and the project paid to line them with concrete and fit new gates, technical work his team knew well. A year after the lining was finished, farms at the tail of the canal were still getting too little water.

Walking the canal at night, Ravshan found out why. Farmers near the head opened the gates early and flooded their fields for longer than the crops needed, as their fathers had done, and the water users' committee had never agreed rules for taking turns. No amount of concrete would change that. He stopped proposing more works and asked the committee to take on the problem itself: to measure who took what, argue out a rota, and decide what would happen to anyone who broke it. The meetings were tense for a whole season. The engineering, he said afterwards, had been the easy part.

Try this today Take your team's hardest problem and ask: could an expert fix this for us, or would we have to change how we work?

Question 1 of 2

A secondary school in Antananarivo, Madagascar, has two problems: broken desks, and teachers who never plan lessons together, though the head has asked them to for years.

Which of the two is the adaptive challenge?

Question 2 of 2

In a herding district near Salta, Argentina, overgrazing is eroding the shared pasture. The ministry sends an expert who writes a careful grazing plan, and the herders ignore it.

In Heifetz's terms, what went wrong?