Endings Come First

In one line A change is an event, but people go through a transition, and every transition starts with letting something go.

A change is something that happens: two schools merge on the first of the month, a ward moves into the new wing. A transition is what people go through inside as they come to terms with it, and it takes much longer. The distinction belongs to William Bridges, an American writer and adviser to organizations, who set it out for managers in Managing Transitions (1991).

Bridges described three phases. Every transition begins with an ending: people let go of something, a team, a building, a way of working, a sense of who they are. Then comes what he called the neutral zone, a confusing in-between time when the old way has gone and the new one does not yet feel real. It is uncomfortable, but it is also when people are most open to new ideas. Only then comes a new beginning, when people take on the new ways as their own.

Most change plans start with the beginning: the new structure, the launch day. Bridges argued that leaders who skip the ending meet resistance they did not expect, because people are still mourning what they have lost, and nobody has admitted it was lost. His advice was practical: say what is ending and what is not, acknowledge losses openly, mark the ending in some way, and treat the past with respect rather than mocking it. Earlier in the course, When Someone Resists traced much pushback to losses nobody had named; Bridges gives those losses a place in the plan.

The model rests on Bridges' experience of working with people and organizations rather than on controlled studies, and the phases do not always come neatly in order. Some people move on in a week and others never fully do. Yet the core point, that an announcement is not an arrival, is one many leads learn the hard way.

A farewell before the merger

Illustration: A farewell before the merger

Khurshida was named head of a school in Sylhet, Bangladesh, formed by merging two primary schools a street apart. Her first plan was all beginnings: a new name, new uniforms and a launch assembly. A month in, teachers from the smaller school still sat together in the staff room, wore their old badges and turned down every joint activity. One of them told her that their founder's prize day, held for thirty years, had simply vanished from the calendar.

Khurshida changed course. She held an evening for the smaller school's families and staff, with old photographs and a speech by its retired founding teacher, and moved its old bell to the new gate. She told staff plainly what would end, the school's name, and what would stay: its reading method, which the merged school would adopt, and the founder's prize. She called the first term a trial timetable and asked for ideas. By the end of the year the staff room had mixed.

Try this today For a change near you, write down what is ending for the people in it, including things nobody has said aloud.

Question 1 of 2

Lebo, a nurse manager in Polokwane, South Africa, merged two medical wards into one. The new rota works well, but weeks later staff are short-tempered and talk often about how things used to be.

Which of Bridges' ideas best explains the mood on Lebo's ward?

Question 2 of 2

Linnea's college in Uppsala, Sweden, has closed its old engineering course, and the new one starts next year. Staff feel adrift, and some are proposing unusual ideas for the new course.

How would Bridges advise Linnea to treat this period?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Endings Come First.” https://quest2plan.com/learn/lesson/endings-come-first. Accessed 29 November 2026.

Sources
  • William Bridges (author) — Bridges' life and books, and his idea of transition as the inner process of adapting to change.
  • Change management — Places Bridges' Managing Transitions (1991) and its neutral zone among other change models.