Go and See

In one line Before deciding about work, go to where it happens and look for yourself, rather than relying on reports.

Taiichi Ohno spent his working life in the Toyota group in Japan, where from the late 1940s onwards he led the development of what became known as the Toyota Production System. Much of that system, with its small batches and its cards that signal when to make more, is about how a factory flows. But underneath it was a habit Ohno insisted on, and it applies to any kind of work.

The habit is called genchi genbutsu, roughly 'the actual place, the actual thing'. If there is a problem, go to where the work is done, look at the real thing, and talk to the people doing it, before deciding anything. Reports, meetings and numbers summarize the work, and every summary leaves something out. The leak, the awkward reach, the form that nobody fills in properly are visible only on the spot.

A story often told about Ohno shows how he taught this, though like many such stories it may have grown in the telling. He would draw a chalk circle on the factory floor and tell a young engineer or manager to stand in it and watch, sometimes for hours, until they saw what he saw. The circle was not a punishment. It was a lesson that looking closely is itself work, and that the answer is often in plain view to anyone patient enough.

Going to see has a cost: it takes time, and leaders cannot be everywhere. A project manager in an office cannot stand on every site. The point is not to distrust every report but to know what your reports cannot tell you, and to go and look whenever a decision rests on something you have not seen. Earlier in the course, The Law of the Situation asked people to take their orders from the facts; going to see is how you find them.

The scale at the end of the corridor

Illustration: The scale at the end of the corridor

Wulan was leading a small project to cut waiting times at a district health clinic in Surabaya, Indonesia. The monthly reports were clear: mothers with babies waited longest at registration, often for over an hour. The obvious fix, already in the draft plan, was to hire a second registration clerk.

Before signing, Wulan spent a morning on a bench by the registration desk. The clerk was quick. The trouble was the scale: every baby had to be weighed before registering, and the only scale was in a room at the far end of the corridor, shared with the vaccination nurse. Mothers queued twice and lost their place in between. Moving the scale next to the desk cost almost nothing. No report had mentioned it, because no report had a column for it.

Try this today Pick one problem you know only from reports. Go and watch the work where it happens for fifteen minutes, and note what surprised you.

Question 1 of 2

The head office of a bus company in Casablanca, Morocco, gets complaints that drivers on one route keep falling behind schedule. The managers plan to redraw the timetable from the data.

What would Ohno have urged them to do first?

Question 2 of 2

A trainee engineer at a furniture workshop in Porto, Portugal, is told to stand in a chalk circle on the floor and watch one workstation for a whole morning.

Why would a trainee be asked to stand there all morning?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Go and See.” https://quest2plan.com/learn/lesson/go-and-see. Accessed 29 November 2026.

Sources
  • Taiichi Ohno — Ohno's life and his part in creating the Toyota Production System.
  • Genchi genbutsu — The 'go and see' principle, including the chalk circle story and its uncertain origin.
  • Toyota Production System — The wider system of flow, small batches and signalling cards that the habit sits within.