Two Plans for One Pole

In one line Judge a plan by what its makers knew and the margins they left, not only by whether luck went its way.

About five weeks after Amundsen, on 17 January 1912, the Royal Navy officer Robert Falcon Scott and four companions reached the South Pole and found the Norwegian tent waiting. None of them survived the return. Edgar Evans died in February, Lawrence Oates walked out of the tent in March, and Scott, Edward Wilson and Henry Bowers were stopped by a blizzard about 18 kilometres short of a large depot of supplies.

Parts of the story are a weaker plan. Scott mixed his transport: three motor sledges, ponies, dogs, and men hauling the sledges themselves on the high plateau, as he had always intended. The motors broke down early and the ponies were shot for food. His men had little ski training, his fuel cans leaked through their leather seals, and by one member's later estimate his summit rations gave little more than half the energy the men burned. A late change from four to five men in the final party stretched food and fuel further.

Yet the other side deserves its full weight. Scott's expedition was also a scientific one, and his men hauled about 14 kilograms of rock samples whose fossils later supported the theory of continental drift. The atmospheric scientist Susan Solomon found that late February and early March 1912 were unusually cold, matched only once in fifteen years of records. Amundsen's base was also about 100 kilometres nearer the Pole. Historians still disagree about how much blame Scott carries.

Judging a decision only by how it turned out is called outcome bias: a lucky gamble looks wise and an unlucky sound choice looks foolish. A fairer review asks what each planner knew, which risks they chose to carry and how much margin they left. Earlier in this tour, Preparation Is Most of It showed Amundsen's margins; Scott's were thinner, and the weather found them. Both things can be true at once.

Two roads and one storm

Illustration: Two roads and one storm

After an unusual storm in the north of Ghana, one of two new rural roads near Tamale washed out and the other survived. The district board wanted to blacklist the contractor whose road had failed. Esinam, the district engineer, asked for a week to review both plans first.

She laid them side by side with the rainfall records each firm had been given. The failed road had been designed for the heaviest rain in twenty years of records, as the contract asked, and the storm was heavier than any on record. But its culverts were spaced at the very limit the contract allowed, with no margin. The surviving road had wider margins, and it had also been lucky: the worst of the storm fell ten kilometres away. Her report praised the second firm's margins, asked the first for closer culverts on its next job, and advised the board not to blacklist anyone on the strength of a single storm.

Try this today Think of a recent decision that turned out badly. Write what was known when it was made, and whether it was a poor choice or bad luck.

Question 1 of 2

Two footbridges were built over the same river near Lima, Peru. In a flood one stood and the other fell, and a newspaper calls one builder brilliant and the other careless.

What should a careful reviewer find out before agreeing?

Question 2 of 2

A survey team in the Pamir mountains of Tajikistan will move its gear by a hired truck, then pack horses, then porters, each carrying it over one stage of the route.

Which weakness of Scott's transport plan does this share?