
Lesson · 6 min Stretch
Five Ways to Handle a Conflict
In one line People handle conflict in five broad ways, and each suits some situations; the skill lies in choosing.
When two people want different things, each has two concerns: how much they care about getting what they want, and how much they care about the other person getting what they want. In 1974 Kenneth Thomas and Ralph Kilmann, building on an earlier grid by Robert Blake and Jane Mouton, called these two concerns assertiveness and cooperativeness, and used them to describe five ways of handling a conflict.
Competing means pressing your own view and accepting that the other side loses. Accommodating is the reverse: giving way so that the other person gets what they want. Avoiding means stepping back from the conflict for now, neither pressing nor yielding. Collaborating means working with the other person to find an answer that meets both sets of needs in full. Compromising sits in the middle: each side gives up part of what it wanted, to reach a deal both can live with.
None of the five is the right one. Competing suits an emergency, or a safety rule that cannot bend. Accommodating suits a point that matters far more to the other person, or a moment when you realize you were wrong. Avoiding suits a trivial issue, or tempers too hot for a useful talk. Collaborating is worth its cost when both sides' needs are important and there is time to work them through; compromising suits a short deadline when a fair split is good enough. Most people lean on one or two ways out of habit, and a habit used everywhere becomes a blind spot.
Some writers argue that collaboration should be the default, since it alone satisfies both sides fully. Others reply that it is slow, and that treating every small dispute as a joint project wears people out. Nothing here depends on any questionnaire: the five ways work as a list to check before you act, alongside the kind of conflict described in Two Kinds of Conflict.
Five choices in two weeks

Dzifa manages the operating theatres at a teaching hospital in Tamale, Ghana. One morning a surgeon wanted to start a list before the instrument count was finished; she refused flatly, because the count is a safety rule, and the list waited ten minutes. Later that week a senior anaesthetist asked to swap holiday weeks with her so that he could attend his daughter's wedding. The week mattered far more to him, and she gave way. A heated row about the colour of new theatre clogs she left alone until everyone had calmed down.
In Amman, Jordan, Celestine runs a charity that teaches refugee children to read. Her two funders wanted different things: one asked for reading scores, the other for stories from families. Instead of splitting the difference, she spent an afternoon with both and designed one review that gave each what it needed, with short tests and a few family interviews. The next week, with a deadline the following morning, she and a partner charity simply split a shared van's hours down the middle.
Try this today Recall a recent disagreement and name which of the five ways you used. Would another way have fitted it better?
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Five Ways to Handle a Conflict.” https://quest2plan.com/learn/lesson/five-ways-to-handle-conflict. Accessed 29 November 2026.
Sources
- Thomas-Kilmann Conflict Mode Instrument — The two dimensions and five modes Thomas and Kilmann described in 1974, and their roots in Blake and Mouton's grid.
- Conflict management — Several schemes of conflict styles, including Blake and Mouton's, Thomas and Kilmann's and Rahim's.
- Managerial grid model — Blake and Mouton's grid of concern for people and concern for results, which the five modes built on.