When Someone Resists

In one line Resistance often carries useful news, so find out what lies behind it before trying to overcome it.

When a plan meets pushback, the easy story is that the resister is stubborn, afraid of anything new or guarding their own patch. Sometimes that is true. More often the resistance carries information the lead does not have.

It tends to come from three places. A real problem: the person sees a flaw, a cost or a risk in the plan, because they do the work it changes. A loss: the change takes away something they value, such as a skill that will no longer count, a routine, standing or income, and nobody has said so aloud. A broken promise: the last change was sold with promises that were not kept, and they are waiting to see whether this one is the same.

A classic study makes the point. In 1948 Lester Coch and John French, the same French who later named the bases of power, reported on a textile factory in Virginia, in the United States, where workers moved to new jobs had resisted, with output falling and grievances rising. Groups simply told of a change did worst; groups that helped plan it recovered fastest. Critics note the factory was unusual, but the finding has worn well: much resistance is a reply to how a change is done. Later writers, Jeffrey and Laurie Ford among them, argued that resistance can even be a resource, since it keeps people talking about the change.

So listen first. Ask what the resister sees, what they would lose and what happened last time. Often they are right about something, and the plan improves. If, after listening, the change should still go ahead, say so plainly and say what will be done about the loss.

The foreman and the props

Illustration: The foreman and the props

Osman was running the build of a six-storey apartment block in Amman, Jordan, and the programme had slipped. He announced a faster cycle: a floor slab poured every week instead of every ten days. The formwork foreman, who had worked in the city for twenty-five years, refused to take the props out from under the slabs so soon, and his crew backed him.

Osman's first thought was that the foreman wanted to protect his crew's overtime. Instead of pressing, he asked him to explain. In winter, the foreman said, concrete gains strength more slowly on the city's cold nights, and on a job years before he had seen a slab sag when the props came out early. Osman asked the structural engineer to check. The engineer agreed and set a longer wait for cold weeks. They kept the faster cycle for the warm months, and the foreman suggested hiring a second set of props to win back some of the time.

Try this today Think of someone who pushed back on a recent change. Write down what they might know, or fear losing, that you did not.

Question 1 of 2

Quyen coordinates a rice farmers' cooperative near Can Tho, Vietnam. Older members oppose switching to a new short-season variety. They remind her that a 'better seed' ten years ago came with promised buyers who never appeared.

Which source of resistance is Quyen mainly hearing?

Question 2 of 2

Phindile is leading a clinic's switch to electronic records in Durban, South Africa. Her plan says: 'Resistance expected from senior nurses. Approach: move fast so they have no time to object.'

What does Phindile's plan get wrong?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “When Someone Resists.” https://quest2plan.com/learn/lesson/when-someone-resists. Accessed 29 November 2026.

Sources
  • Harwood research — The Harwood factory studies, including Coch and French's work on participation and resistance, and critiques of them.
  • Decoding resistance to change — Jeffrey and Laurie Ford on treating resistance as feedback rather than an obstacle.