Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Stretch

Making Sense Under Pressure

In one line Teams act on a shared picture of what is happening; when events break it, they need ways to rebuild it together.

On 5 August 1949 fifteen smokejumpers parachuted into Mann Gulch, in Montana in the United States, to fight what looked like a manageable fire. With a fire guard already on the ground they were sixteen. Later that afternoon the fire crossed the gulch and raced uphill towards them. The foreman, Wagner Dodge, ordered the men to drop their heavy tools; some did, some would not. He then lit a fire in the grass ahead, lay down in its burned patch and called the crew to join him. Nobody did. Thirteen men died. Dodge survived, as did two men who reached the ridge.

Karl Weick, the American organizational theorist and author of Sensemaking in Organizations (1995), reread the disaster in a 1993 paper, The Collapse of Sensemaking in Organizations. Sensemaking is the constant work by which people turn a stream of events into a story of what is going on, and then act on that story. The crew expected a fire they could handle. As the cues stopped fitting, their picture of the situation and the group's roles collapsed together. Dodge's escape fire made no sense to men who no longer shared a picture, and with the crew's structure gone his order carried no weight.

Weick named four things that help a group hold together. Improvisation: making do with what is at hand, as Dodge did. A virtual role system: each person carries the whole team in mind and can step into a missing role. An attitude of wisdom: holding what you know loosely, ready to find you are wrong. And respectful interaction: people report honestly what they see and take others' reports seriously.

For a project lead, the lesson is to make the shared picture spoken, so that its cracks show early. Earlier in the course, Trust Before You've Met drew on Weick's work on trust in new groups. Next, the week turns to order that nobody plans.

The stream turns brown

Illustration: The stream turns brown

Bassam leads a road-repair crew working in a dry riverbed near Nizwa, Oman. On a cloudy morning he gathered the six workers and said aloud what he thought was happening: rain was falling in the mountains upstream, water might arrive within a couple of hours, and if the trickle in the channel turned brown they would leave the machines and climb to the track on the eastern bank. He named who would take his place if he were cut off, and asked whether anyone had seen anything he had missed. The youngest worker said the birds had gone quiet. Bassam said that was worth watching.

Two hours later Bassam was on the far side checking a culvert when the stream turned brown. His deputy, who had heard the plan and knew she was next in line, called everyone off the machines at once. The crew climbed while the first flood wave rolled through the place where the grader had stood. Nobody waited for orders, because the picture had been shared before it was needed.

Try this today At your next meeting, say in one sentence what you think is going on, and ask what anyone has seen that does not fit.

Question 1 of 2

A mountain rescue team in the Alay valley, Kyrgyzstan, loses radio contact with its leader during a storm. A junior member, who knows each role from the morning briefing, takes over navigation and keeps the group moving.

Which of Weick's sources of resilience does this show?

Question 2 of 2

Ayşe leads a team inspecting an old bridge in Izmir, Turkey. After the first day she tells them: 'My reading is that the cracks are old and stable, but I could be wrong. Tell me anything you see that does not fit.'

What is she doing, in Weick's terms?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Making Sense Under Pressure.” https://quest2plan.com/learn/lesson/making-sense-under-pressure. Accessed 29 November 2026.

Sources