
Lesson · 6 min Stretch
Speaking Up to Rank
In one line Rank makes juniors hesitate to challenge, so good teams agree in advance how to speak up and how to listen.
On 27 March 1977 two jumbo jets collided on a fog-bound runway at Los Rodeos airport on Tenerife, and 583 people died. Both had been diverted there after a bomb at Gran Canaria. The KLM captain, the airline's chief flight instructor, began his take-off without clearance while the Pan Am jet was still on the runway in cloud. His flight engineer asked whether the Pan Am plane was clear; the captain answered firmly that it was, and the engineer said no more. The first officer had questioned an earlier start, but not this one.
Investigators suggested that the captain's seniority and standing made his crew hesitate to press. With other crashes, such as the fuel accident in Pushing Back Upward, it pushed airlines towards crew resource management: juniors are trained to state a concern plainly and keep pressing, and captains to invite challenge and treat it as information, not insubordination.
Hospitals borrowed the idea. One American training programme teaches graded phrases: 'I am concerned', then 'I am uncomfortable', then 'this is a safety issue'. Because the words are agreed in advance, saying them is a signal, not an insult. Its two-challenge rule says that a concern voiced twice and still ignored justifies stronger action, up to stopping the work or calling a supervisor.
The same trap works far from cockpits. When the most senior person speaks first and firmly, others adjust their views or keep their evidence to themselves, often without the senior person noticing; it is nicknamed the highest-paid person's opinion. The remedy is for the senior person to speak last and to ask those nearest the work for their facts first. Seniority still counts: experience often knows things others do not, and someone must decide. The aim is a decision made after the others have truly been heard.
The wrong knee

Ilkay is a junior anaesthetist at a hospital in Bursa, Turkey. As a senior surgeon prepares to operate on a patient's knee, she notices that the mark on the skin is on the left leg, while the list on the wall says right. The surgeon is already reaching for the drape. Her first, quiet remark that the list looks odd gets a nod and nothing more.
She uses the words the hospital trained everyone in: 'I am concerned. I am uncomfortable. This is a safety issue.' The surgeon stops. The team checks the consent form and the scan, finds that the list was typed wrongly, and the operation goes ahead on the correct leg. At the debrief the surgeon thanks her, and from then on he asks the most junior people at each pre-operation briefing for their concerns before he speaks.
Try this today In your next meeting, if you are the most senior person there, ask others for their view and speak last.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Speaking Up to Rank.” https://quest2plan.com/learn/lesson/speaking-up-to-rank. Accessed 29 November 2026.
Sources
- Tenerife airport disaster (Wikipedia) — The 1977 collision at Los Rodeos, the cockpit exchanges, the investigators' findings and the move to crew resource management.
- Crew resource management (Wikipedia) — How the training began, what it teaches, and how hospitals adapted it.