Complicated Is Not Complex

In one line A complicated system can be worked out by experts; a complex one changes as you act on it and is understood only afterwards.

A jet engine has thousands of parts, and few people could build one. Yet it is complicated, not complex. Its parts do not change their minds. An expert can take it apart, find out how each piece works, and put it back, and it will behave as before. Knowledge about one engine holds for the next one of the same model.

A rainforest, a market or a farming community is different. Its parts are living things that adapt to one another and to whatever you do to them. Change one thing and the others shift in reply, so the same action can work in one village and fail in the next. Cause and effect can be traced afterwards, but not reliably predicted. In the terms of Four Kinds of Situation, the first calls for analysis and the second for small trials and close watching.

Mistaking one for the other is costly. In 1946 and 1947 the British government launched a scheme to grow groundnuts on about three million acres of Tanganyika, now Tanzania, with its main base at Kongwa. It was run like an engineering project: clear the bush with tractors, plant to plan, harvest at scale. Warnings about the soil and rainfall were overlooked, the imported machinery broke down, and a drought in 1949 ruined the crop. Only about 47,000 acres were ever cleared, and the scheme was abandoned in January 1951, with about 36 million pounds written off. A few trial plots first would have shown how the land and the weather behaved.

The opposite error is rarer but real: treating a complicated fault as a mystery, running endless experiments where an expert could simply find the answer. The skill is to ask which kind of problem you have before choosing how to work.

The drifting readings

Illustration: The drifting readings

Ardak leads a soil research team at an institute in Almaty, Kazakhstan. Their new mass spectrometer, bought for a study of fertilizer in wheat fields, began giving readings that drifted from day to day. Ardak had just come back from a course on complexity, and she treated the drift as an emergent puzzle. For six weeks the team tried small changes, one after another: different room temperatures, new sample trays, a fresh rota of operators. Each seemed to help for a day and then failed.

A visiting engineer from the instrument's maker spent one afternoon with the machine. She ran the standard calibration checks, found a worn seal in the vacuum line and replaced it. The drift stopped. The instrument had been complicated all along: a fault with one cause that expertise could find. Ardak wrote in the team's notes that the wheat farmers' response to the fertilizer would need small trials and patience, but the machine had only needed the right expert.

Try this today Ask of a problem you face: if we took it apart and put it back, would it behave the same? If not, it is probably complex.

Question 1 of 2

A regional office in Cebu, the Philippines, has four projects on its list for next year.

Which of them is complex rather than merely complicated?

Question 2 of 2

An agriculture ministry in Meknes, Morocco, hires engineers to design a drip irrigation scheme for smallholders. The detailed plan sets crops and water rotas for each farm, and it is to start in two hundred villages in the same season.

What is the weak point of this plan?