Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Steady

What Agile Was Reacting Against

In one line Agile grew out of decades of late, costly software and anger at heavy documents, but not every failure was the plan's fault.

In October 1968 more than fifty experts from eleven countries met at Garmisch, in Germany, for a NATO conference on what they boldly called software engineering. Some spoke of a software crisis: programs arrived late, cost far more than planned, broke in use and were hard to change. In 1972 Edsger Dijkstra argued that the crisis grew with the machines, since bigger computers invited bigger programs. In 1975 Fred Brooks, who had managed a huge operating system project at IBM, added a lesson many managers learned the hard way: adding people to a late software project makes it later.

The main answer of the next twenty years was to make software more like other engineering. Write down every requirement and have it signed, then design, then code, then test, with a document and a review closing each stage. A 1970 paper by Winston Royce is often blamed for this one-way sequence, though Royce himself warned against running it in a single pass. Large defence and government contracts wrote such stages into their rules, and by the 1990s many programmers felt the documents had become the work.

The reformers who later wrote the agile manifesto made a clear charge. Users rarely know what they want until they see something working; needs change while the paperwork is written; knowledge leaks away at every handover; and a plan that counts finished pages cannot say whether the software works. Earlier in the course, The Cost of Late Faults showed why problems found late cost so much.

They were not right about everything. Many failures came from vague goals, politics, wishful estimates or sheer size, which no process cures. Some heavy processes existed for good reasons, as in flight control or medical devices, where a checked written design protects lives. And some historians argue the crisis itself was overstated by people with remedies to offer.

Go deeper

A figure quoted for years came from a 1994 survey by an American research firm: only about 16 per cent of software projects were judged fully successful, 53 per cent were late, over budget or cut down, and 31 per cent were cancelled. It was repeated as proof of the crisis. Later researchers questioned how success had been defined, since a project was judged largely by how closely it matched its first estimates of time, cost and features, however poor those estimates had been. The survey showed something was wrong, but not how much.

Four hundred pages of rain

Illustration: Four hundred pages of rain

In the mid-1990s Kemi led a small team at a government weather office in Accra, Ghana, building a system to collect rainfall readings from stations across the country. Her contract followed the rules of the time: first a full requirements document, signed by every department, then design, then programming. The document took fourteen months and ran to four hundred pages.

By the day it was signed, twenty of the stations had switched from paper forms to new electronic gauges, and the forms the document described so carefully were already out of date. Kemi did not ask for another rewrite. She went to her director with a smaller idea: let the team build a rough version that took readings from ten stations within three months, show it to the clerks who typed in the readings, and write the rest of the requirements as they learned what was really needed.

Try this today Find a document at work or at home that nobody reads. Ask what problem it was first written to solve, and whether that problem still exists.

Question 1 of 2

In the 1980s a defence contractor writing radar software in Bristol had to deliver, and get approved, 2,000 pages of documents before any code could be written. Its progress reports counted documents approved.

Which complaint of the later reformers does this fit most closely?

Question 2 of 2

A railway ticketing system in Lahore, Pakistan, is three months behind. To catch up, the manager adds twelve programmers who have never seen the code.

What would Fred Brooks have expected to happen next?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “What Agile Was Reacting Against.” https://quest2plan.com/learn/lesson/what-agile-was-against. Accessed 29 November 2026.

Sources