“All these must be built with due reference to durability, convenience, and beauty.”
— Vitruvius
De architectura, book 1, chapter 3 (translated by Morris Hicky Morgan, 1914)
Ideas
75 quotations from the mentors and practices on this site, each with where it comes from. Kept lines are saved on this device and collect in your notebook.
Line of the day
“Adding manpower to a late software project makes it later.”
— Fred Brooks, The Mythical Man-Month (1975), chapter 2
“All these must be built with due reference to durability, convenience, and beauty.”
— Vitruvius
De architectura, book 1, chapter 3 (translated by Morris Hicky Morgan, 1914)
“Through co-operation, the needs of a number of persons, many times greater than their own (number), can be satisfied.”
— Ibn Khaldun
The Muqaddimah, chapter 1, first prefatory discussion, translated by Franz Rosenthal (1958), volume 1, p. 91
“I desired and prayed to be an architect / To leave to the world works of perfection”
— Mimar Sinan
Risale-i Tezkiret ül-Ebniye, lines 60–61, as translated in Aptullah Kuran, "Early Works of the Architect Sinan", Belleten 37:148 (1973), pp. 545–556, note 13
“I made up my mind that if the army wanted nurses, they would be glad of me, and with all the ardour of my nature, which ever carried me where inclination prompted, I decided that I would go to the Crimea; and go I did, as all the world knows.”
— Mary Seacole
Wonderful Adventures of Mrs. Seacole in Many Lands (1857), chapter VIII
“I never lose an opportunity of urging a practical beginning, however small, for it is wonderful how often in such matters the mustard-seed germinates and roots itself.”
— Florence Nightingale
letter to a friend, quoted in Edward Cook, The Life of Florence Nightingale, volume 2 (1913), p. 406
“I never ran my train off the track and I never lost a passenger.”
— Harriet Tubman
as quoted in Mary Biggs, Women's Words: The Columbia Book of Quotations by Women (1996), p. 2
“To manage is to forecast and plan, to organize, to command, to coordinate and to control.”
— Henri Fayol
Administration industrielle et générale (1916), part 1, in the English translation by Constance Storrs, General and Industrial Management (1949)
“The principal object of management should be to secure the maximum prosperity for the employer coupled with the maximum prosperity for each employee.”
— Frederick Winslow Taylor
The Principles of Scientific Management (1911), chapter 1, p. 9
“We cannot drive people; we must direct their development.”
— Henry Gantt
Work, Wages, and Profits (1910), p. 116
“I prepared a scheme as promised to the President of the Commission and submitted it within the time agreed.”
— M. Visvesvaraya
Memoirs of My Working Life (1951), p. 12
“My solution is to depersonalize the giving of orders, to unite all concerned in a study of the situation, to discover the law of the situation and obey that.”
— Mary Parker Follett
The Giving of Orders (1926), in Dynamic Administration (1941)
“Victory awaits him who has everything in order — luck, people call it.”
— Roald Amundsen
The South Pole (1912), English translation by A. G. Chater
“Optimism is true moral courage.”
— Ernest Shackleton
as quoted in L. D. A. Hussey, South with Shackleton (1949)
“The fine art of executive decision consists in not deciding questions that are not now pertinent, in not deciding prematurely, in not making decisions that cannot be made effective, and in not making decisions that others should make.”
— Chester Barnard
The Functions of the Executive (1938), p. 194
“Ing ngarsa sung tuladha, ing madya mangun karsa, tut wuri handayani.”
— Ki Hajar Dewantara
the Taman Siswa motto associated with him ("in front, set an example; in the middle, build the will; from behind, encourage"); its first two clauses may be older
“A business man once stated that there is nothing so practical as a good theory.”
— Kurt Lewin
Psychology and the Process of Group Living, Journal of Social Psychology 17 (1943), p. 118
“Assignable causes of variation may be found and eliminated.”
— Walter Shewhart
Economic Control of Quality of Manufactured Product (1931), p. 8
“A system must have an aim. Without an aim, there is no system.”
— W. Edwards Deming
The New Economics for Industry, Government, Education (1993), chapter 3
“One man cannot build a house, but ten men can build ten houses very easily, even a hundred houses.”
— Hassan Fathy
Right Livelihood Award acceptance speech (1980)
“The man in charge must concern himself with details. If he does not consider them important, neither will his subordinates.”
— Hyman Rickover
Doing a Job, speech at Columbia University (5 November 1981)
“The servant-leader is servant first.”
— Robert Greenleaf
The Servant as Leader (1970)
“Behind every managerial decision or action are assumptions about human nature and human behavior.”
— Douglas McGregor
The Human Side of Enterprise (1960), p. 33
“There is surely nothing quite so useless as doing with great efficiency what should not be done at all.”
— Peter Drucker
Managing for Business Effectiveness, Harvard Business Review (May 1963)
“We must each respect others even as we respect ourselves.”
— U Thant
Portfolio for Peace (1968), p. 92
“I am fortunate to have had many occasions to share my opportunities with others.”
— Fe del Mundo
response on receiving the Ramon Magsaysay Award (1977)
“I always remember the regent's axiom: a leader, he said, is like a shepherd. He stays behind the flock, letting the most nimble go out ahead, whereupon the others follow, not realizing that all along they are being directed from behind.”
— Nelson Mandela
Long Walk to Freedom (1994), part one, chapter 3, recalling the regent who raised him
“Without dialogue there is no communication, and without communication there can be no true education.”
— Paulo Freire
Pedagogy of the Oppressed, chapter 3, translated by Myra Bergman Ramos (30th anniversary edition, 2005), pp. 92–93
“Success in the marketplace increasingly depends on learning, yet most people don't know how to learn.”
— Chris Argyris
Teaching Smart People How to Learn, Harvard Business Review (May 1991)
“If you want people to do a good job, give them a good job to do.”
— Frederick Herzberg
as quoted in Randall B. Dunham, Organizational Behavior (1984), p. 118
“Midwifery I believe is the answer – to put a well trained midwife in every village would soon eradicate obstetric fistulae!”
— Catherine Hamlin
Right Livelihood Award acceptance speech (2009), read on her behalf
“Do not monopolize your knowledge nor impose arrogantly your techniques, but respect and combine your skills with the knowledge of the researched or grassroots communities, taking them as full partners and co-researchers.”
— Orlando Fals Borda
"Research for Social Justice: Some North-South Convergences", plenary address to the Southern Sociological Society, Atlanta, 8 April 1995
“Culture is the collective programming of the mind that distinguishes the members of one group or category of people from others.”
— Geert Hofstede
Dimensionalizing Cultures: The Hofstede Model in Context, Online Readings in Psychology and Culture 2(1) (2011)
“I believe in this concept, but the implementation described above is risky and invites failure.”
— Winston Royce
Managing the Development of Large Software Systems (1970)
“Adding manpower to a late software project makes it later.”
— Fred Brooks
The Mythical Man-Month (1975), chapter 2
“There is no development without selfreliance.”
— Ela Bhatt
Right Livelihood Award acceptance speech (1984)
“A reliable way to make people believe in falsehoods is frequent repetition, because familiarity is not easily distinguished from truth.”
— Daniel Kahneman
Thinking, Fast and Slow (2011), chapter 5
“The leaders would have the mission of sharing with the families fraternal solidarity, love, and knowledge about caring for pregnant women and children, so that they would be healthy and happy.”
— Zilda Arns Neumann
her last speech, Port-au-Prince (January 2010), translated from the text released by the Brazilian bishops' conference, as quoted by Agência Senado (13 January 2010)
“In an economy where the only certainty is uncertainty, the one sure source of lasting competitive advantage is knowledge.”
— Ikujiro Nonaka
The Knowledge-Creating Company, Harvard Business Review (November 1991)
“From the very beginning we knew that if we wanted to have an impact in alleviating poverty, we had to be big and effective as opposed to small and beautiful.”
— Fazle Hasan Abed
interview with Mubin S. Khan (2009), published in The Business Standard, Dhaka (21 December 2019)
“Countermeasures are based on the assumption that although we cannot change the human condition, we can change the conditions under which humans work.”
— James Reason
Human error: models and management, BMJ 320 (2000), p. 768
“In the course of history, there comes a time when humanity is called to shift to a new level of consciousness, to reach a higher moral ground.”
— Wangari Maathai
Nobel Peace Prize lecture, Oslo (10 December 2004)
“Tell me how you measure me, and I will tell you how I will behave.”
— Eliyahu Goldratt
The Haystack Syndrome (1990), p. 26
“Management makes a system work. It helps you do what you know how to do. Leadership builds systems or transforms old ones.”
— John Kotter
Leading Change (1996)
“It is a testament to our naïveté about culture that we think that we can change it by simply declaring new values.”
— Peter Senge
The Fifth Discipline Fieldbook (1994)
“Every day, people have problems for which they do, in fact, have the necessary know-how and procedures. We call these technical problems.”
— Ronald Heifetz
Leadership on the Line, with Marty Linsky (2002), chapter 1
“Over budget, over time, over and over again.”
— Bent Flyvbjerg
What You Should Know About Megaprojects and Why, Project Management Journal 45 (2014), the iron law of megaprojects
“Wise executives tailor their approach to fit the complexity of the circumstances they face.”
— Dave Snowden
A Leader's Framework for Decision Making, with Mary E. Boone, Harvard Business Review (November 2007)
“It introduces the construct of team psychological safety, a shared belief held by members of a team that the team is safe for interpersonal risk taking.”
— Amy Edmondson
Psychological Safety and Learning Behavior in Work Teams, Administrative Science Quarterly 44 (1999), abstract
“Optimism is an occupational hazard of programming: feedback is the treatment.”
— Kent Beck
Extreme Programming Explained (2000 printing), p. 31
“Human error is not a cause of failure. Human error is the effect, or symptom, of deeper trouble.”
— Sidney Dekker
The Field Guide to Understanding 'Human Error' (third edition, 2014)
“For neither talent without instruction nor instruction without talent can produce the perfect craftsman.”
— Vitruvius
De architectura (c. 25 BC)
“Everything is on a reduced scale here in the Polar regions; we can't afford to be extravagant.”
— Roald Amundsen
The South Pole (1912)
“Until you dig a hole, you plant a tree, you water it and make it survive, you haven't done a thing. You are just talking.”
— Wangari Maathai
speech at the Goldman Environmental Prize (2006)
“In the past the man has been first; in the future the system must be first.”
— Frederick Winslow Taylor
The Principles of Scientific Management (1911)
“There is no one doctrine of administration for business and another for affairs of state; administrative doctrine is universal.”
— Henri Fayol
preface to Administration industrielle et générale (1917)
“There are three main ways of dealing with conflict; domination, compromise and integration.”
— Mary Parker Follett
Dynamic Administration (1942)
“The workers are handicapped by the system, and the system belongs to the management.”
— W. Edwards Deming
Out of the Crisis (1982)
“It does not follow from the separation of planning and doing in the analysis of work that the planner and the doer should be two different people.”
— Peter Drucker
The Practice of Management (1954)
“If the practical-reactor designer errs, he wears the mistake around his neck; it cannot be erased. Everyone sees it.”
— Hyman Rickover
Paper Reactors, Real Reactors (1953)
“The major distinguishing feature of the spiral model is that it creates a risk-driven approach to the software process rather than a primarily document-driven or code-driven process.”
— Barry Boehm
A Spiral Model of Software Development and Enhancement (1988)
“Everyone designs who devises courses of action aimed at changing existing situations into preferred ones.”
— Herbert A. Simon
The Sciences of the Artificial (1969)
“If the goal is to make money, then (putting it in terms Jonah might have used), an action that moves us towards making money is productive. And an action that takes away from making money is non-productive.”
— Eliyahu Goldratt
The Goal (1984)
“Empiricism asserts that knowledge comes from experience and making decisions based on what is observed.”
— Ken Schwaber
The Scrum Guide (2020)
“We are uncovering better ways of developing software by doing it and helping others do it.”
— The Agile Manifesto
Manifesto for Agile Software Development (2001)
“The history of the world is but the biography of great men.”
— Thomas Carlyle
On Heroes, Hero-Worship, and the Heroic in History (1841)
“The quality of leadership, more than any other single factor, determines the success or failure of an organization.”
— Fred Fiedler and Martin Chemers
Improving Leadership Effectiveness (1976)
“Do those served grow as persons? Do they, while being served, become healthier, wiser, freer, more autonomous, more likely themselves to become servants?”
— Robert Greenleaf
The Servant as Leader (1970)
“Just so far as people think that the basis of working together is compromise or concession, just so far they do not understand the first principles of working together.”
— Mary Parker Follett
The New State (1918)
“The study of the conditions for change begins appropriately with an analysis of the conditions for "no change," that is, for the state of equilibrium.”
— Kurt Lewin
Quasi-Stationary Social Equilibria and the Problem of Permanent Change (1947)
“The satisfiers relate to the actual job. Those factors that do not act as satisfiers describe the job situation.”
— Frederick Herzberg
The Motivation to Work (1959)
“Culture and leadership, when one examines them closely, are two sides of the same coin, and neither can really be understood by itself.”
— Edgar Schein
Organizational Culture and Leadership (1985)
“Systems thinking is a discipline for seeing the 'structures' that underlie complex situations, and for discerning high from low leverage change.”
— Peter Senge
The Fifth Discipline (1990)
“He's taking an inside view. He should forget about his own case and look for what happened in other cases.”
— Daniel Kahneman
Thinking, Fast and Slow (2011)
“Most normal accidents have a significant degree of incomprehensibility.”
— Charles Perrow
Normal Accidents (1984)
“Sensemaking is about the enlargement of small cues. It is a search for contexts within which small details fit together and make sense.”
— Karl Weick
Sensemaking in Organizations (1995)
No line matches. Try another name or word.