Quest2PlanChart the course. Lead the crew.
← All mentors
Walter Shewhart

Grandfather of Quality Control

Walter Shewhart

1891–1967 · New Canton, Illinois, United States · North America

Your quest companion appears in the header, offers one of their ideas on your home page each day, and cheers you on in lessons. You can change companions at any time, and your progress stays the same.

An American physicist and statistician at Bell Telephone Laboratories who drew the first control chart in 1924, separating variation built into a process from variation with a special cause, and taught the idea to Deming.

Key work: Economic Control of Quality of Manufactured Product (1931)

“Assignable causes of variation may be found and eliminated.”

Economic Control of Quality of Manufactured Product (1931), p. 8

Key ideas, in brief (in our words)

  • Every process wobbles; learn its normal wobble before you react.

  • Chasing every small change in the numbers makes the process worse.

  • A test of a change is worth more than an argument about it.

Read more: Wikipedia

On the voyage

Two Kinds of VariationPlan, Do, Study, Act

Quest with Walter Shewhart above to set sail and open these lessons.