Design thinking

Overview

Many problems cannot be solved by analysis alone, because the problem itself has to be framed, tried and reframed through quick prototypes and close attention to the people affected. Its roots are in Herbert Simon's 1969 science of design and Rittel and Webber's wicked problems. Critics say it is often sold as a workshop routine that skips the slow parts.

Design thinking is the claim that the way designers work, framing a problem, making something quickly and learning from how people respond, can help with problems far beyond products. Its intellectual roots are older than its popularity. In The Sciences of the Artificial (1969) the American scholar Herbert Simon argued that design, concerned with how things ought to be, is a discipline in its own right. In 1973 Horst Rittel and Melvin Webber, planners at Berkeley, called many social problems "wicked": they have no final definition and no right answer. Donald Schön's The Reflective Practitioner (1983) showed how professionals think while acting, and the British researcher Nigel Cross studied how designers actually reason.

Read more (2 more paragraphs)

Accounts of the practice differ, but most share a few moves. Spend time with the people who face the problem, watching what they do as well as what they say. Frame the problem more than once, because the first statement is often the wrong one. Generate many ideas before choosing. Make cheap prototypes, such as paper screens, cardboard rooms or a role-played service, and test them early. Hospitals have used this to redesign wards and patient journeys, city governments to rethink forms and services, and charities to shape programmes with the communities they serve. Cross argued that designers reason by proposing solutions in order to learn what the problem is, rather than studying it fully first.

Critics, including design scholars, say design thinking is often sold as a two-day workshop with sticky notes and a five-step diagram, stripped of the craft skill and long immersion that make design work. Some argue that a short visit to "empathize" with users can flatter the visitors while the people affected have little real say, and that the method tends to leave existing power untouched. Evidence on results is mostly case studies. Defenders reply that the core ideas (frame carefully, test early, stay close to the people concerned) are sound even when the packaging is thin, and that they correct the habit of planning everything at a desk. The habit worth keeping: make a rough version early and watch real people use it.

Where it answers

Key terms

Wicked problem
Rittel and Webber's name for a problem with no final definition and no right answer, where every attempt changes the problem.
Framing
Deciding what the problem is and what would count as better; designers often change the frame as they learn.
Prototype
A quick, cheap version of an idea, made to learn from people's reactions before much is spent.
Reflection-in-action
Schön's term for skilled people thinking while they work, testing moves and adjusting as the situation responds.
Empathy
In design practice, close study of the people who will live with a solution: watching, asking and sharing their tasks.

In their words

“Everyone designs who devises courses of action aimed at changing existing situations into preferred ones.”
Herbert A. Simon, The Sciences of the Artificial (1969)

Further reading

  • The Sciences of the Artificial · Herbert A. Simon
  • Dilemmas in a General Theory of Planning · Horst W. J. Rittel and Melvin M. Webber
  • The Reflective Practitioner · Donald A. Schön

Learn this

1 lesson on the voyage

Compare