The master builders
Vitruvius, Filippo Brunelleschi, the cathedral masons' lodges
The most experienced master, who has learned the craft over years on real sites, should work it out and guide the rest.
Antiquity to the RenaissanceIdeas
Pick a question and see how the practices answer it, one line each.
Vitruvius, Filippo Brunelleschi, the cathedral masons' lodges
The most experienced master, who has learned the craft over years on real sites, should work it out and guide the rest.
Antiquity to the RenaissanceZheng He, Roald Amundsen, Ernest Shackleton, Tenzing Norgay
The leader should plan every stage before setting out, with stores, spares and fallbacks, then trust the team on the ground.
1400s to 1950sAndean ayni and minka, Kenyan harambee, Indonesian gotong royong, Wangari Maathai
The neighbours who share the need should agree it together, each giving work now and getting it back later.
Centuries old, still practisedFrederick Taylor, Henry Gantt, Frank and Lillian Gilbreth
Someone who has studied the job closely should work out the best way, write it down and teach it.
1880s to 1930sHenri Fayol, Max Weber, Luther Gulick, Lyndall Urwick
Managers, following clear principles, should divide the work, set the lines of authority and write down who does what.
1910s to 1950sMary Parker Follett, Elton Mayo, Chester Barnard, Douglas McGregor
The people doing the work should work it out together, because the situation, not rank, gives the orders.
1918 onwardWalter Shewhart, W. Edwards Deming, Joseph Juran, Kaoru Ishikawa
Management should design the system, but with the people who run it, testing each change in small cycles.
1924 onwardSakichi Toyoda, Taiichi Ohno, Shigeo Shingo
The people doing the work, coached by leaders who come and see, should improve their own standard a little every day.
1940s onwardPeter Drucker, George Odiorne
Each manager should agree clear objectives with their own boss, then be free to choose how to meet them.
1954 onwardHyman Rickover, James Webb, Katherine Johnson, Margaret Hamilton
A central office should break the whole into parts, map how they depend on each other and find the critical path.
1950s to 1970sWinston Royce, Barry Boehm, Robert Cooper
Specialists should settle the requirements and design up front, approved at formal gates, before any building starts.
1970 onwardHerbert Simon, Horst Rittel, Donald Schön, Nigel Cross
Before planning the answer, go and watch the people with the problem, then try rough versions with them until the problem is clear.
1960s onwardEliyahu Goldratt
Find the one step that limits the whole job, plan everything around keeping it busy, and keep the safety time in one shared buffer.
1984 onwardHirotaka Takeuchi, Ikujiro Nonaka, Ken Schwaber, Jeff Sutherland
The team doing the work decides how; the Product Owner decides what comes next; and both are rechecked every sprint.
1986 onwardKent Beck, Ward Cunningham, Alistair Cockburn, the authors of the Agile Manifesto
Plan a little, build a small working piece, show it to the customer, and let what you learn shape the next piece.
1990s onwardTaiichi Ohno, John Little, Donald Reinertsen
Nobody plans it all in advance: map how work really flows, cap what is in progress, and pull the next item when there is room.
2000s onwardPatrick Debois, Jez Humble, Nicole Forsgren
The people who build a thing should also run it, and every step from idea to users should be automated and repeatable.
2009 onwardThomas Carlyle, Francis Galton, Ralph Stogdill
The most capable person available should decide how it is done, so the first job is to find that person.
1840s to 1940s, and again since the 1980sFred Fiedler, Paul Hersey, Ken Blanchard
It depends: read the task and the people, then choose how much to direct and how much to leave to them.
1960s onwardRobert Greenleaf
The team should decide how; the leader asks what it needs and clears away whatever stands in its path.
1970 onwardJames MacGregor Burns, Bernard Bass
The leader should paint the goal so clearly that people want to find the way there themselves.
1978 onwardRonald Heifetz, Marty Linsky
Those who must live with the change have to work it out; the leader frames the question and holds them to it.
1994 onwardBruce Avolio, Fred Luthans, William Gardner
Whoever leads should say openly what they think and why, then let people test the plan in the open.
2003 onwardKees Boeke, Gerard Endenburg, Mary Parker Follett
The circle doing the work should decide by consent, within limits agreed with the circles linked to it.
1945 onwardKurt Lewin, John Kotter, William Bridges
A small guiding group should plan it in stages, building urgency and early wins so that others come along.
1947 onwardFrederick Herzberg, Edward Deci, Richard Ryan
The people doing it should have a real say, because choice is what makes them care about the result.
1959 onwardBruce Tuckman, Meredith Belbin, J. Richard Hackman, Amy Edmondson
The team should plan its own work, once someone has given it a clear goal, the right members and support.
1965 onwardEdgar Schein, Geert Hofstede
Whoever plans it should first learn how things are really done here, because unwritten habits decide what sticks.
1980 onwardChris Argyris, Donald Schön, Peter Senge, Ikujiro Nonaka
Plan it, try it, then review it together and change the plan; the learning matters more than the first version.
1970s onwardDaniel Kahneman, Amos Tversky, Bent Flyvbjerg
Whoever plans should first look up how similar jobs really went, and start the estimate there before trusting their own picture.
1979 onwardKarl Weick, Kathleen Sutcliffe, Karlene Roberts, Todd La Porte
Plan carefully, but expect the plan to fail somewhere; when it does, let the person closest to the problem decide.
1987 onwardCharles Perrow, James Reason, Diane Vaughan, Sidney Dekker, Erik Hollnagel
Plan with the people at the sharp end, assume errors will happen, and build defences in depth rather than relying on care alone.
1984 onwardDave Snowden, Ralph Stacey, Karl Weick
In uncertain work no one can plan it fully: run small, safe experiments, watch what emerges, and build on what works.
1999 onwardVitruvius, Filippo Brunelleschi, the cathedral masons' lodges
At the skill: who learned the craft, how well, and whether the tried ways of the trade were followed.
Antiquity to the RenaissanceZheng He, Roald Amundsen, Ernest Shackleton, Tenzing Norgay
At the preparation: what was not foreseen, packed, tested or rehearsed before we set out.
1400s to 1950sAndean ayni and minka, Kenyan harambee, Indonesian gotong royong, Wangari Maathai
At the ties between people: who has stopped turning up, and whether the giving still runs both ways.
Centuries old, still practisedFrederick Taylor, Henry Gantt, Frank and Lillian Gilbreth
At the method: measure each step, find the wasted motion and set a better standard.
1880s to 1930sHenri Fayol, Max Weber, Luther Gulick, Lyndall Urwick
At the structure: unclear roles, a person with two bosses giving clashing orders, or a broken chain of command.
1910s to 1950sMary Parker Follett, Elton Mayo, Chester Barnard, Douglas McGregor
At the group: how people are treated, how they talk and whether they feel part of the work.
1918 onwardWalter Shewhart, W. Edwards Deming, Joseph Juran, Kaoru Ishikawa
At the system and its variation, before blaming anyone: most faults are built into the process.
1924 onwardSakichi Toyoda, Taiichi Ohno, Shigeo Shingo
At the floor itself: go and see where work waits, piles up or gets redone, and stop to fix it at once.
1940s onwardPeter Drucker, George Odiorne
At the objectives: are they clear, agreed and measured, and does each person know what they are aiming at?
1954 onwardHyman Rickover, James Webb, Katherine Johnson, Margaret Hamilton
At the interfaces and the schedule network: which parts fail to fit, and which late task holds up the whole.
1950s to 1970sWinston Royce, Barry Boehm, Robert Cooper
At the early stages: requirements that were vague, missed or changed late, when each fix costs far more.
1970 onwardHerbert Simon, Horst Rittel, Donald Schön, Nigel Cross
At the problem statement: we may be solving the wrong problem well, so reframe it with the people who live with it.
1960s onwardEliyahu Goldratt
At the constraint: the single step that holds back everything else, not the places that are easiest to improve.
1984 onwardHirotaka Takeuchi, Ikujiro Nonaka, Ken Schwaber, Jeff Sutherland
At the last sprint review and retrospective: what did the finished work, and the team's own habits, show us?
1986 onwardKent Beck, Ward Cunningham, Alistair Cockburn, the authors of the Agile Manifesto
At how long it has been since anyone saw working results: the gap between building and feedback has grown too wide.
1990s onwardTaiichi Ohno, John Little, Donald Reinertsen
At the queues: find where work waits longest, because the step where items pile up is where to act.
2000s onwardPatrick Debois, Jez Humble, Nicole Forsgren
At the time from a change to users and back: long, rare, manual releases hide the faults that frequent small ones expose.
2009 onwardThomas Carlyle, Francis Galton, Ralph Stogdill
At who is in charge: the wrong person in the lead role spoils everything below.
1840s to 1940s, and again since the 1980sFred Fiedler, Paul Hersey, Ken Blanchard
At the fit between the leader's style and the situation, and change one or the other.
1960s onwardRobert Greenleaf
At what the team lacks from me: tools, time, cover from outside pressure or a clear reason.
1970 onwardJames MacGregor Burns, Bernard Bass
At belief: people who no longer see why the work matters stop giving their best.
1978 onwardRonald Heifetz, Marty Linsky
At what people would rather not face: the hard choice hiding behind the quick technical fix.
1994 onwardBruce Avolio, Fred Luthans, William Gardner
At honesty: whether people have been told the truth and felt free to tell it back.
2003 onwardKees Boeke, Gerard Endenburg, Mary Parker Follett
At how the decision was made: who was heard, who could object, and whether that circle had the right to decide.
1945 onwardKurt Lewin, John Kotter, William Bridges
At the transition: what people are being asked to give up, and whether anyone has helped them let go.
1947 onwardFrederick Herzberg, Edward Deci, Richard Ryan
At the job itself: whether it gives people anything to achieve, learn or own.
1959 onwardBruce Tuckman, Meredith Belbin, J. Richard Hackman, Amy Edmondson
At the conditions: whether the team has a shared goal and is safe enough for people to speak up.
1965 onwardEdgar Schein, Geert Hofstede
At the unspoken assumptions: what everyone here takes for granted and nobody has questioned.
1980 onwardChris Argyris, Donald Schön, Peter Senge, Ikujiro Nonaka
At the last review: what we learned last time, and whether we actually changed anything because of it.
1970s onwardDaniel Kahneman, Amos Tversky, Bent Flyvbjerg
At the estimate itself: the plan was probably too hopeful from the start, so compare it with what similar projects actually took.
1979 onwardKarl Weick, Kathleen Sutcliffe, Karlene Roberts, Todd La Porte
At the small surprises and near misses we stopped noticing; big failures usually announce themselves in small ones first.
1987 onwardCharles Perrow, James Reason, Diane Vaughan, Sidney Dekker, Erik Hollnagel
At the system, not the person: what pressures, designs and habits made the error likely, and why did it make sense then?
1984 onwardDave Snowden, Ralph Stacey, Karl Weick
At whether we misread the situation: we may be treating a complex problem as a merely complicated one.
1999 onward