The industrial age · 1880s to 1930s

Scientific management

Overview

Work can be studied, measured and planned, and the plan should come from study rather than habit. Taylor timed tasks with a stopwatch, the Gilbreths filmed motions and Gantt charted work against time. Its critics answered that it treated workers as parts of a machine, and much of later management began as a reply.

Scientific management is the idea that work can be studied like any other part of nature, and that the best way to do a job should come from measurement rather than habit. It grew in American steel mills and machine shops in the 1880s and 1890s, where Frederick Winslow Taylor timed each step of a task with a stopwatch. His 1911 book, The Principles of Scientific Management, made the approach famous far beyond the factory, and engineers in Europe, Russia and Japan took it up within a generation.

Read more (2 more paragraphs)

Its key ideas are standard work, planning separated from doing, and pay tied to output. Frank and Lillian Gilbreth filmed bricklayers and surgeons to strip out wasted motion. Henry Gantt drew bar charts of work against time so that managers and workers could see what was late. In France, Henri Fayol wrote down what a manager does: plan, organize, command, coordinate and control. The project schedule, the job description and the work study all descend from this school.

Critics began at once. Workers and unions said it took their skill away and drove the pace past what bodies could bear, and a United States congressional committee investigated the stopwatch in 1911 and 1912. Later writers argued that it ignored how people feel and think, and much of modern management began as a reply. Yet the habit of looking closely at the work, instead of guessing, outlived its harshness. The habit worth keeping: measure the work before you argue about it.

Where it answers

Key terms

Time study
Timing each step of a task with a stopwatch to find how long it should take and set a standard.
Motion study
Watching or filming a task to strip out needless movements; the Gilbreths' method.
Gantt chart
A bar chart of tasks against time, showing what should be done when and what is running late.
Standard work
The one written, agreed way to do a task, taught to everyone who does it.
Differential piece rate
Taylor's pay scheme: a higher rate per piece for workers who meet the standard, a lower rate for those who do not.

In their words

“In the past the man has been first; in the future the system must be first.”
Frederick Winslow Taylor, The Principles of Scientific Management (1911)

Further reading

  • The Principles of Scientific Management · Frederick Winslow Taylor
  • Motion Study · Frank B. Gilbreth
  • Work, Wages, and Profits · Henry L. Gantt