The One Best Way

In one line Taylor held that study and timing could find the best method for any job, and that managers should plan it.

In the 1890s a steel works in Pennsylvania kept hundreds of labourers shovelling coal and ore across its yards. Each man brought his own shovel and worked the way he had learned. Frederick Winslow Taylor, an engineer hired by Bethlehem Steel in 1898, saw this as the problem: nobody had ever studied the job. In The Principles of Scientific Management, published in 1911, he argued that any task could be studied like a problem in engineering, and that study would beat rule of thumb. His followers spoke of finding 'the one best way'.

The method ran in steps. Watch good workers and break the job into its motions. Time each motion with a stopwatch, drop the slow and useless ones, and write down the quickest sequence. Choose the right tool: trials at Bethlehem showed a shoveller did most in a day with loads of about 21 pounds, so the yard supplied small shovels for heavy ore and large ones for light coal. Then select and train men for the task and pay extra to those who met it. Taylor reported that the yard gang fell from between 400 and 600 men to about 140, while average pay rose from $1.15 to $1.88 a day.

The boldest step was splitting thinking from doing. A planning office would work out each job in advance and hand the worker written instructions to carry out. Earlier in the course, Drawing Time met Henry Gantt, who worked beside Taylor on exactly these planning problems.

The idea spread fast. Engineers in Europe and Japan took it up, Lenin urged Soviet industry in 1918 to adopt what was useful in it, and by 1917 an American book was applying it to typing and filing in offices. It promised higher wages and lower costs at once. Whether the people being timed agreed was another matter.

The scarf-packing bench

Illustration: The scarf-packing bench

Gulbahor supervises the packing room at a silk workshop in Margilan, Uzbekistan. Some packers fold and box three hundred scarves a shift, others barely two hundred, and orders from abroad are piling up. Her manager suggests hiring more packers. Gulbahor wants to know first why the gap is so wide.

For two days she watches and times the steps: fetching a scarf, folding, tissue, label, box. The fastest packers keep tissue and labels within reach and fold on a marked board, while the slowest walk to a shelf for each box. Gulbahor writes the fastest sequence on a card, lays every bench out the same way and trains the whole room. Output rises by a third without a single new hire. Then one older packer asks a question Gulbahor had not considered: who decided that this card was the best way, and could the packers have written it themselves?

Try this today Time yourself doing one small routine task three ways. Write down which steps the fastest way left out.

Question 1 of 2

At a mail sorting centre in Penang, Malaysia, each clerk sorts letters in a personal way, and the number sorted per hour varies widely between clerks.

What would Taylor have done first?

Question 2 of 2

A tile factory in Fez, Morocco, adopts Taylor's system in full. Under it, the ___ decides how each job is to be done, and the worker carries out the written instructions.

Which word or phrase fills the gap?