Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Steady

Motion Study at Home and Work

In one line The Gilbreths studied motions to cut wasted effort, and Lillian asked how the work felt to the person doing it.

Frank Gilbreth began as a bricklayer's helper and noticed that no two bricklayers moved alike. By his own account he cut the motions needed to lay a brick from eighteen to five, and a bricklayer's output rose from about 120 bricks an hour to 350. With his wife, Lillian Moller Gilbreth, he went on to film workers with a camera that showed the time in fractions of a minute, and to break every task into a small set of basic motions they called therbligs, roughly Gilbreth spelled backwards.

They took the method into hospitals. Frank watched surgeons hunt through trays for instruments and proposed a 'caddy', an assistant who hands the surgeon each instrument as it is needed. The job is familiar now in every operating theatre.

Lillian was a psychologist. Her book The Psychology of Management appeared in 1914, and the next year Brown University awarded her a doctorate in applied psychology. Where Taylor asked how fast a job could go, she asked how it felt: what tired people, what kept their interest, how rest and good tools changed both. When Frank died in 1924 she carried on their consulting work while raising their large family. She turned motion study on the home, and in 1929, with a gas company in Brooklyn, showed the Kitchen Practical, laid out so the cook worked in a tight circle instead of walking back and forth. In 1935 Purdue University made her a professor of management, its first woman professor in engineering.

What did the humane version add? It treated fatigue and comfort as things to measure and improve, not side effects of speed, and it brought the worker's experience into the study. Yet the expert still watched and decided, and whether that was enough of a change is still argued.

The ward kitchen in Davao

Illustration: The ward kitchen in Davao

Imelda cooks for the children's ward of a hospital in Davao, in the Philippines. By ten each morning she is tired and behind, and the nurses complain that breakfast trays arrive cold. Her supervisor suggests she simply start earlier.

Instead, Imelda asks a nurse to follow her for one morning and mark her path on a plan of the kitchen. The sheet fills with lines to the far storeroom: rice, oil, trays, again and again. She and her two helpers move the daily supplies to shelves beside the stove and the rarely used ones to the storeroom. One helper says reaching up for the heavy rice sacks hurts her back, so the sacks go on a low trolley. Within a week breakfast leaves the kitchen twenty minutes sooner, and Imelda says the best part is that she no longer ends the morning exhausted.

Try this today Sketch your path around your kitchen while you make one meal. Mark the trip you made most often and ask why.

Question 1 of 2

A furniture workshop in Hanoi, Vietnam, films a carpenter's hands while he fits drawers, then plays the film slowly, frame by frame.

What is the workshop doing, in the Gilbreths' terms?

Question 2 of 2

In an operating theatre in Tashkent, Uzbekistan, a surgeon keeps turning away from the patient to search the tray for the next instrument.

Which change follows Frank Gilbreth's idea for surgery?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Motion Study at Home and Work.” https://quest2plan.com/learn/lesson/motion-study-at-home-and-work. Accessed 29 November 2026.

Sources