What Taylorism Cost the Workers
In one line Taylor's methods sped up work but took judgement from workers, who fought back; both sides had a real case.
In August 1911 the moulders in the foundry of the Watertown Arsenal, an army works near Boston, walked off the job. The army's chief of ordnance, General William Crozier, had invited in Taylor's methods, and a time-study man had begun timing the moulders with a stopwatch. When one moulder refused to be timed and was dismissed, the others went out. A week later he was reinstated and an inquiry promised.
The workers' case went deeper than one stopwatch. Taylor's system moved the knowledge of a trade out of the workers' heads and into a planning office, so a moulder who had spent years learning to judge sand and metal would now follow a card. A pace set by timing the quickest men could turn into a speed-up for all, and the bonus pulled people to work harder until the faster pace was expected. Taylor had written that a man fit to carry pig iron was close to an ox in his mental make-up, and workers read in such lines what the system thought of them. In 1915 a report by Robert Hoxie for a federal commission recorded union objections, among them that the system treated workers as mere instruments of production.
Taylor answered in evidence to a special committee of the House of Representatives in 1912. His system paid more: the Bethlehem shovellers' daily pay had risen by more than half. It cut the waste that kept everyone poor, and it replaced a foreman's bullying with rules anyone could check. The real fight, he said, was over sharing out the gains, and study made the gains larger.
Congress was not convinced. By 1916 its army budget laws barred stopwatch time study in government works. Later, Harry Braverman argued in 1974 that splitting thinking from doing drained skill out of work. Measuring work and respecting those who do it pull against each other, and that tension runs through the rest of this week.
The two fastest packers

Hasna runs a shift at a sardine cannery in Agadir, Morocco. Head office sends a consultant to set a standard, and he times the two fastest packers on a good morning: forty tins a minute. From next month, he says, everyone will work to that rate, with a bonus above it. By lunchtime the older packers, who know at a glance which fish to reject, are angry. They say the rate leaves no time to check the fish, and that nobody asked them.
Hasna does not throw the measurement away. She asks the consultant to time a dozen packers across a whole shift, including the slow hour before the break, and to count rejected fish as part of the work. Two of the oldest packers join him to watch the timing. The new rate comes out at thirty-two tins, with the quality check built in. Nobody loves the stopwatch, but the packers can now see how the number was made.
Try this today Think of a target you work to. Ask who set it, how, and whether the people doing the work had any say in it.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “What Taylorism Cost the Workers.” https://quest2plan.com/learn/lesson/what-it-cost-workers. Accessed 29 November 2026.
Sources
- Watertown Arsenal — The army works where scientific management was brought in from 1908, and the resentment it caused.
- Scientific management — The movement's history, including the 1911 walkout, the House inquiry, Hoxie's report and later criticism.
- Labor and Monopoly Capital — Harry Braverman's 1974 book on how management control took skill out of work.