The age of big programmes · 1950s to 1970s
Systems engineering and the critical path
Overview
A project too big for any one head can be managed by breaking it into parts, mapping how they depend on each other and watching the longest chain of tasks. It grew in the 1950s and 1960s in the US Navy's nuclear and Polaris programmes, the critical path method and NASA's Apollo. Critics say its charts can show control more than create it.
Systems engineering and the critical path came out of the giant defence and space projects of the 1950s and 1960s, when no single engineer could hold the whole design in mind. In the United States, Admiral Hyman Rickover built the navy's nuclear propulsion programme, and its first submarine, Nautilus, went to sea in 1955. The navy's Polaris missile programme created the Program Evaluation and Review Technique, PERT, in 1958, while the chemical firm DuPont and Remington Rand developed the critical path method in 1957 to plan work on industrial plants.
Read more (2 more paragraphs)
Its key ideas are breaking the whole into subsystems, defining the interfaces between them and scheduling by network. In a network chart every task is linked to those it waits on, and the longest chain, the critical path, sets the finish date. PERT added three estimates for each task: optimistic, likely and pessimistic. Rickover demanded technical mastery and personal responsibility from his engineers. At NASA, administrator James Webb ran Apollo as a vast programme of centres and contractors; Katherine Johnson calculated flight paths, and Margaret Hamilton led the team at MIT that wrote Apollo's onboard flight software.
Critics say the charts can become theatre. The political scientist Harvey Sapolsky found that PERT helped Polaris less by steering the work than by impressing outsiders and keeping them away. Others note that big programmes still overrun their budgets, that detailed networks go stale as soon as plans change, and that the approach can bury people in reports. Defenders reply that submarines, rockets, power stations and large hospitals cannot be built without knowing which parts depend on which, and that the critical path is still the clearest picture of what is late. The habit worth keeping: find the chain of tasks that sets the finish date and watch it.
Where it answers
Who should plan the work?
A central office should break the whole into parts, map how they depend on each other and find the critical path.
See how other practices answer “Who should plan the work?” →
When it goes wrong
At the interfaces and the schedule network: which parts fail to fit, and which late task holds up the whole.
Key terms
- Critical path
- The longest chain of linked tasks in a project; any delay on it delays the finish.
- PERT
- Program Evaluation and Review Technique: a network method from 1958 that uses three time estimates per task to judge likely finish dates.
- Float
- How long a task can slip without delaying the project's finish; tasks on the critical path have none.
- Work breakdown
- Splitting a large project into smaller and smaller pieces until each can be planned, given to someone and tracked.
- Interface
- The point where two parts of a system meet, such as a plug, a data link or a handover, and where many faults hide.
In their words
“If the practical-reactor designer errs, he wears the mistake around his neck; it cannot be erased. Everyone sees it.”
Further reading
- The Polaris System Development · Harvey M. Sapolsky
- Critical-Path Planning and Scheduling · James E. Kelley and Morgan R. Walker
- System Engineering: An Introduction to the Design of Large-Scale Systems · Harry H. Goode and Robert E. Machol
Learn this
Compare
Cite or share this page