The master builders
Overview
A great work can be organized by a master who knows the craft by hand and carries the whole design in their head. Vitruvius wrote down Roman building knowledge, cathedral masons trained apprentices in their lodges and Brunelleschi raised Florence's dome. Critics say it rested on secrets and on rare people who could not be replaced.
The master builders' tradition holds that a great work is organized by a master of the craft: someone who learned with their hands, carries the design in their head and directs everyone on site. In Rome, Vitruvius wrote De architectura, a handbook of building and engineering, in the reign of Augustus. In medieval Europe, masons worked from lodges beside each cathedral, where a master trained apprentices and kept the drawings. In Istanbul, Mimar Sinan, chief architect to the Ottoman court from 1538, led a corps of builders across an empire.
Read more (2 more paragraphs)
Its key ideas are long apprenticeship, knowledge passed on by example, and one master who answers for the whole. Vitruvius asked that a building be strong, useful and beautiful, and that its architect know drawing, geometry, history and law. Filippo Brunelleschi entered the 1418 contest to vault Florence's cathedral, was put in charge in 1420, at first jointly with Lorenzo Ghiberti, and built the dome from 1420 to 1436 without a wooden frame beneath it. He laid bricks in a herringbone pattern so each ring held itself, and designed an ox-driven hoist to lift the stone. Much of this knowledge lived in models, templates and talk, not in books.
Critics point out that the tradition kept its knowledge secret, guarded by guilds that also kept outsiders out, and that it depended on rare people. When a master died, a project could stall for years, and many cathedrals took centuries to finish. Cost and time were seldom counted the way a modern client would want. Defenders reply that deep skill on site still prevents failures no plan foresees, and that today's apprenticeships, site engineers and design reviews descend from the lodge. The habit worth keeping: put someone who truly knows the work where the work is done.
Where it answers
Who should plan the work?
The most experienced master, who has learned the craft over years on real sites, should work it out and guide the rest.
See how other practices answer “Who should plan the work?” →
When it goes wrong
At the skill: who learned the craft, how well, and whether the tried ways of the trade were followed.
Key terms
- Master mason
- The leading craftsman of a medieval building site, who designed the work, drew the templates and directed the other masons.
- Lodge
- The workshop and meeting place beside a cathedral site, where masons cut stone, kept drawings and trained apprentices.
- Apprenticeship
- Learning a craft over years by working beside a master, from simple tasks to the hardest ones.
- Firmitas, utilitas, venustas
- Vitruvius's three tests of a building: it should be strong, useful and beautiful.
- Centring
- The temporary wooden frame that holds up an arch or vault until it can stand; Brunelleschi built his dome without one.
In their words
“For neither talent without instruction nor instruction without talent can produce the perfect craftsman.”
Further reading
- De architectura · Vitruvius
- The Cathedral Builders · Jean Gimpel
- Brunelleschi's Dome · Ross King
Learn this
3 lessons on the voyage