Firmness, Usefulness, Delight

In one line Vitruvius judged a building by three tests, sound, useful and beautiful, and wrote down how to run the work.

Some time between about 30 and 20 BC, a Roman architect and military engineer named Vitruvius wrote De architectura, ten books on building dedicated to the emperor Augustus. It is the only treatise on architecture to survive from the ancient world. Its most famous line says that buildings should have strength, utility and beauty. In 1624 the English writer Sir Henry Wotton rendered the three as firmness, commodity and delight, and builders have quoted them ever since.

Read today, the ten books are also a guide to running works. Book one tells how to choose a healthy site; the ancients, Vitruvius says, looked at the livers of animals that grazed there before settling a town. Book two covers materials such as brick, lime and timber. Later books deal with water supply and with machines, including hoists. Book one also says what an architect needs to know: writing, drawing, geometry, history, philosophy, music, some law and medicine, and the movements of the stars, joined with practice on real work.

The preface to book ten tells of an old law at Ephesus. An architect taking on a public work gave an estimate, and his property was held as security until the work was done. If the cost matched the estimate, he was honoured. If it ran over by up to a quarter, the public paid the extra. Beyond a quarter, he paid it himself. Vitruvius wished Rome had the same law.

Projects today check firmness through inspections and watch cost closely. Usefulness is tested less often, and delight is usually the first thing cut. Earlier in the course, Quality, the Hidden Fourth showed how quality pays when time and money are squeezed. Whether beauty is a luxury or part of what makes a building last is a question on which thoughtful builders still disagree.

The reading room in the afternoon

Illustration: The reading room in the afternoon

Bahar manages the building of a public library in Yazd, Iran. The design review had two parts: the structural engineer signed off on strength, and the finance office signed off on cost. Both were green. Bahar added a third and a fourth line to the review sheet, borrowed from Vitruvius: does it serve the people who will use it, and will they enjoy being there?

She took the drawings to the librarians and a class of eleven-year-olds. The children pointed out that the lowest shelves were the only ones they could reach and that those held the adult books. The librarians noticed that the reading room faced west, into the hottest afternoon sun, when the schoolchildren came. Moving the children's shelves cost nothing. Turning the reading room towards a shaded courtyard added two weeks to the drawings and very little to the budget. The engineer's test and the finance test had both been passed by a building that nobody would have wanted to sit in at four o'clock.

Try this today Pick something your team is making. Score it out of five for being sound, for being useful and for being a pleasure to use. Which score did nobody check?

Question 1 of 2

A new footbridge in George Town, Malaysia, passed every load test and came in on budget. It is so steep that people with prams, bicycles or wheelchairs walk a kilometre round instead.

Which of Vitruvius's tests did the bridge fail?

Question 2 of 2

A town council in Sfax, Tunisia, debates a rule for public works: if costs exceed the architect's estimate by more than a quarter, the architect pays the excess from their own fee.

Which old practice does this echo, and what was it for?