Quest2PlanChart the course. Lead the crew.

Ideas

Big questions

Pick a question and see how the practices answer it, one line each.

When work keeps going wrong, where do you look first?

33 practices answer this. See every practice

The master builders

Vitruvius, Filippo Brunelleschi, the cathedral masons' lodges

At the skill: who learned the craft, how well, and whether the tried ways of the trade were followed.

Antiquity to the Renaissance

Expedition leadership

Zheng He, Roald Amundsen, Ernest Shackleton, Tenzing Norgay

At the preparation: what was not foreseen, packed, tested or rehearsed before we set out.

1400s to 1950s

Shared labour traditions

Andean ayni and minka, Kenyan harambee, Indonesian gotong royong, Wangari Maathai

At the ties between people: who has stopped turning up, and whether the giving still runs both ways.

Centuries old, still practised

Scientific management

Frederick Taylor, Henry Gantt, Frank and Lillian Gilbreth

At the method: measure each step, find the wasted motion and set a better standard.

1880s to 1930s

Administrative management

Henri Fayol, Max Weber, Luther Gulick, Lyndall Urwick

At the structure: unclear roles, a person with two bosses giving clashing orders, or a broken chain of command.

1910s to 1950s
Show 28 more practices

Human relations

Mary Parker Follett, Elton Mayo, Chester Barnard, Douglas McGregor

At the group: how people are treated, how they talk and whether they feel part of the work.

1918 onward

The quality movement

Walter Shewhart, W. Edwards Deming, Joseph Juran, Kaoru Ishikawa

At the system and its variation, before blaming anyone: most faults are built into the process.

1924 onward

Lean and the Toyota Production System

Sakichi Toyoda, Taiichi Ohno, Shigeo Shingo

At the floor itself: go and see where work waits, piles up or gets redone, and stop to fix it at once.

1940s onward

Management by objectives

Peter Drucker, George Odiorne

At the objectives: are they clear, agreed and measured, and does each person know what they are aiming at?

1954 onward

Systems engineering and the critical path

Hyman Rickover, James Webb, Katherine Johnson, Margaret Hamilton

At the interfaces and the schedule network: which parts fail to fit, and which late task holds up the whole.

1950s to 1970s

Plan-driven methods

Winston Royce, Barry Boehm, Robert Cooper

At the early stages: requirements that were vague, missed or changed late, when each fix costs far more.

1970 onward

Design thinking

Herbert Simon, Horst Rittel, Donald Schön, Nigel Cross

At the problem statement: we may be solving the wrong problem well, so reframe it with the people who live with it.

1960s onward

Scrum

Hirotaka Takeuchi, Ikujiro Nonaka, Ken Schwaber, Jeff Sutherland

At the last sprint review and retrospective: what did the finished work, and the team's own habits, show us?

1986 onward

Agile software development

Kent Beck, Ward Cunningham, Alistair Cockburn, the authors of the Agile Manifesto

At how long it has been since anyone saw working results: the gap between building and feedback has grown too wide.

1990s onward

Kanban and flow

Taiichi Ohno, John Little, Donald Reinertsen

At the queues: find where work waits longest, because the step where items pile up is where to act.

2000s onward

DevOps and continuous delivery

Patrick Debois, Jez Humble, Nicole Forsgren

At the time from a change to users and back: long, rare, manual releases hide the faults that frequent small ones expose.

2009 onward

Trait theories of leadership

Thomas Carlyle, Francis Galton, Ralph Stogdill

At who is in charge: the wrong person in the lead role spoils everything below.

1840s to 1940s, and again since the 1980s

Servant leadership

Robert Greenleaf

At what the team lacks from me: tools, time, cover from outside pressure or a clear reason.

1970 onward

Transformational leadership

James MacGregor Burns, Bernard Bass

At belief: people who no longer see why the work matters stop giving their best.

1978 onward

Adaptive leadership

Ronald Heifetz, Marty Linsky

At what people would rather not face: the hard choice hiding behind the quick technical fix.

1994 onward

Authentic leadership

Bruce Avolio, Fred Luthans, William Gardner

At honesty: whether people have been told the truth and felt free to tell it back.

2003 onward

Sociocracy and self-management

Kees Boeke, Gerard Endenburg, Mary Parker Follett

At how the decision was made: who was heard, who could object, and whether that circle had the right to decide.

1945 onward

Change management

Kurt Lewin, John Kotter, William Bridges

At the transition: what people are being asked to give up, and whether anyone has helped them let go.

1947 onward

Motivation research

Frederick Herzberg, Edward Deci, Richard Ryan

At the job itself: whether it gives people anything to achieve, learn or own.

1959 onward

Team science

Bruce Tuckman, Meredith Belbin, J. Richard Hackman, Amy Edmondson

At the conditions: whether the team has a shared goal and is safe enough for people to speak up.

1965 onward

Organizational culture

Edgar Schein, Geert Hofstede

At the unspoken assumptions: what everyone here takes for granted and nobody has questioned.

1980 onward

The learning organization

Chris Argyris, Donald Schön, Peter Senge, Ikujiro Nonaka

At the last review: what we learned last time, and whether we actually changed anything because of it.

1970s onward

Behavioural forecasting

Daniel Kahneman, Amos Tversky, Bent Flyvbjerg

At the estimate itself: the plan was probably too hopeful from the start, so compare it with what similar projects actually took.

1979 onward

High-reliability organizing

Karl Weick, Kathleen Sutcliffe, Karlene Roberts, Todd La Porte

At the small surprises and near misses we stopped noticing; big failures usually announce themselves in small ones first.

1987 onward

Safety science: from blame to learning

Charles Perrow, James Reason, Diane Vaughan, Sidney Dekker, Erik Hollnagel

At the system, not the person: what pressures, designs and habits made the error likely, and why did it make sense then?

1984 onward

Complexity and sensemaking

Dave Snowden, Ralph Stacey, Karl Weick

At whether we misread the situation: we may be treating a complex problem as a merely complicated one.

1999 onward