Quality and lean · 1940s onward
Lean and the Toyota Production System
Overview
Work should flow to the customer with as little waste as possible, and the people doing it should stop and fix problems the moment they appear. It grew at Toyota in Japan from the late 1940s, where Taiichi Ohno and Shigeo Shingo built on Sakichi Toyoda's self-stopping loom. Critics say that, copied without its respect for people, it becomes a speed-up.
Lean is the name Western researchers later gave to the Toyota Production System, a way of making things built up at Toyota in Japan after the Second World War. Toyota was small and short of money, and could not afford the large stocks and long runs of American car plants. From the late 1940s, Taiichi Ohno, a machine-shop manager, worked out how to make many models in small batches with little stock. He built on two older ideas from the Toyoda family: Sakichi Toyoda's loom of 1924, which stopped itself when a thread broke, and Kiichiro Toyoda's call for parts to arrive just in time.
Read more (2 more paragraphs)
Its key ideas are just-in-time flow and jidoka, building in quality by stopping at the first sign of trouble. Any worker could pull a cord to halt the line, so problems were fixed, not passed on. Ohno used kanban, small cards that travel with parts, so each step makes only what the next step has used. Shigeo Shingo cut die changes from hours to minutes with single-minute exchange of die, and designed poka-yoke, simple devices that make a mistake impossible or obvious. Managers were taught genchi genbutsu: go to the real place and see the real thing before deciding.
Critics, among them the American labour writers Mike Parker and Jane Slaughter, called it management by stress: every buffer removed means more pressure on the worker. Others warn that very thin stocks can stall whole industries when an earthquake or a blocked port breaks the chain, and that ideas from car plants fit poorly with one-off projects. Defenders answer that the system was always meant to expose problems so they could be solved, and to develop the people who solve them. Hospitals, offices and software teams have adapted it. The habit worth keeping: go and see the work before you decide.
Where it answers
Who should plan the work?
The people doing the work, coached by leaders who come and see, should improve their own standard a little every day.
See how other practices answer “Who should plan the work?” →
When it goes wrong
At the floor itself: go and see where work waits, piles up or gets redone, and stop to fix it at once.
Key terms
- Just-in-time
- Making only what is needed, when it is needed, in the amount needed, so stock and waiting shrink.
- Jidoka
- Building quality in by stopping a machine or line as soon as something goes wrong, so the cause is fixed at once.
- Kanban
- A card that travels with parts in a factory and signals the step before to make or send more, so nothing is made too early.
- SMED
- Single-minute exchange of die: Shingo's method for cutting machine changeovers from hours to under ten minutes.
- Poka-yoke
- A simple device or design that makes a mistake impossible or instantly visible, such as a part that fits only one way.
Further reading
- Toyota Production System: Beyond Large-Scale Production · Taiichi Ohno
- A Study of the Toyota Production System from an Industrial Engineering Viewpoint · Shigeo Shingo
- The Machine That Changed the World · James P. Womack, Daniel T. Jones and Daniel Roos
Learn this
Compare
Cite or share this page
A plain reference you can paste into notes or an essay:
Quest2Plan. “Lean and the Toyota Production System.” https://quest2plan.com/learn/ideas/lean. Accessed 29 November 2026.