Seeing Waste

In one line Ohno's seven wastes give names to the time and effort that add nothing for the person being served.

Ohno taught his managers to look at work through the customer's eyes. Of everything that happens to a car body, a form or a patient, only some of it changes them in a way the customer would want. The rest is waste, in Japanese muda. Earlier in the course, Go and See described his habit of making people stand and watch the work; much of what he wanted them to see was waste.

He named seven kinds. Overproduction: making more, or sooner, than is needed. Waiting: people or things idle until the next step. Transport: moving things about. Extra processing: doing more than the job needs. Stock: piles of materials, work or paper. Motion: people reaching, walking and searching. Defects: mistakes that have to be found and put right. Overproduction is often called the worst, because it creates many of the others. Some later writers add an eighth: the unused skill and ideas of the people doing the work.

In offices and clinics the largest waste is usually waiting, and it is the hardest to see. A form needing four signatures may take ten minutes of real work and three weeks to come back, because it sits in a tray between each signature. A patient may spend most of a morning in a clinic and twenty minutes with anyone who treats them. Everyone is busy, so nobody notices: it is the work that waits, not the people.

Naming waste is not the same as blaming people. Most of it is built into the way the work is arranged, which is why Ohno asked managers to change the arrangement. And some steps that look like waste, such as a second check on a dangerous drug, are there for good reason. The skill is to see the waste first, and then decide.

Three hours, twenty-six minutes

Illustration: Three hours, twenty-six minutes

Zahra manages an outpatient eye clinic in Muscat, Oman, where patients complain of long mornings. With one patient's permission, she and two nurses follow him from the door to the exit, writing down every step and how long it takes.

He is in the clinic for three hours and ten minutes, and is examined, tested and treated for twenty-six minutes in all. He walks between four rooms, twice back to the same desk. He waits for drops to take effect, which is needed, and for his file to be carried by hand from the records room, which is not. He is asked his date of birth five times. Zahra pins the map on the staff room wall and asks the team to circle each waste and give it one of Ohno's names. By the end of the week the wall is covered, and the first change is simple: files are fetched the evening before.

Try this today Follow one request or form through your workplace today, and note how long it spends waiting compared with being worked on.

Question 1 of 2

At a city housing office in Shymkent, Kazakhstan, a repair request needs signatures from three managers. Each signs within minutes of reading it, yet requests take about a month.

Which kind of waste most explains the month?

Question 2 of 2

A hospital kitchen in Kumasi, Ghana, cooks lunch for every bed on the wards each day, though about a quarter of the patients have gone home or are not allowed to eat.

Which of Ohno's wastes is this, first of all?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Seeing Waste.” https://quest2plan.com/learn/lesson/seeing-waste. Accessed 29 November 2026.

Sources
  • Muda (Japanese term) — The seven wastes, why overproduction is often called the worst, and the later eighth waste of unused skills.
  • Taiichi Ohno — Ohno's life at Toyota and his part in naming the seven wastes.