Just in Time

In one line Make only what the next step needs, when it needs it, and let low stock show the problems that big piles hide.

For much of the twentieth century, most factories pushed. Each department made as much as it could, as fast as it could, and passed the results on, so parts piled up between steps. Taiichi Ohno, who moved to Toyota's car business in 1943 and spent decades reshaping its workshops, turned this round. In his system the later step pulls: it takes what it needs, and the earlier step makes only enough to replace what was taken.

The idea owed something to supermarkets. Toyota began studying how their shelves were stocked in the late 1940s: a shopper takes what they need and staff refill the gap, rather than the shop piling up goods just in case. Ohno's version used cards, called kanban. A card travels with each container of parts; when the container is emptied, the card goes back to the step that made the parts as an order for exactly that many more. Toyota applied this in its main plant's machine shop in 1953. No card, no production.

Pulling means small batches and little stock, and that was the point. Lean writers often compare stock to water in a river: a high level hides the rocks. Lower it and the rocks appear, such as a machine that often breaks, a late supplier or a step that makes faulty parts. Toyota cut the number of cards on purpose so that such problems would show and be fixed. Ohno set out the system in his book Toyota Production System (1978), published in English in 1988.

Just in time has a price. With little stock, one failure can stop everything, as many factories have found when floods, earthquakes or pandemics cut their supplies. The system works only where problems are fixed fast, which is why the habit taught in Go and See mattered so much to Ohno.

Two bins of brake pads

Illustration: Two bins of brake pads

Wangari runs the parts store for a bus company's workshop in Nakuru, Kenya. The shelves are crammed, because the company orders spares in bulk each quarter to get a discount. Yet buses still sit idle waiting for parts, since the store is full of the wrong ones, and nobody can say what is there without a morning's search.

Wangari moves the common parts into pairs of bins. Each bin holds about a week's use and carries a card. When a mechanic empties the first bin, its card goes into a box by her desk, and she orders exactly one bin's worth from a supplier in town, who delivers in two days. Within a month the store is half empty and the buses wait less. Then something new shows up: the brake pad card comes back twice as often as any other. With no pile to hide it, the mechanics trace the wear to two buses with badly adjusted brakes.

Try this today Look at one pile at home or at work: paper, parts, unanswered messages. Ask what problem that pile lets you ignore.

Question 1 of 2

A bakery in Arequipa, Peru, bakes 900 rolls each night to the same plan for the cafés it supplies, and throws away about a fifth because some cafés use fewer than expected.

What would a pull system change?

Question 2 of 2

In a motorbike assembly plant in Hai Phong, Vietnam, a card arrives at the frame shop from the welding line that uses its frames.

What is the arriving card telling the frame shop?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Just in Time.” https://quest2plan.com/learn/lesson/just-in-time. Accessed 29 November 2026.

Sources
  • Kanban — Toyota's study of supermarkets from the late 1940s, its use of kanban in the machine shop from 1953, and the rules for cards.
  • Toyota Production System — Just in time and jidoka as the system's two pillars, and how Ohno and Eiji Toyoda built it.
  • Taiichi Ohno — Ohno's career at Toyota from 1943 and his book Toyota Production System (1978; English 1988).