Quality and lean · 1924 onward
The quality movement
Overview
Quality is built into the system that does the work, not inspected in at the end, and most faults belong to that system rather than to the workers. Walter Shewhart began it at Western Electric in 1924, and W. Edwards Deming, Joseph Juran and Kaoru Ishikawa carried it into post-war Japan. Critics say its programmes often became paperwork and slogans.
The quality movement holds that the way to good work is to understand and improve the process that produces it. It began in May 1924, when Walter Shewhart, a physicist at the Western Electric telephone company in the United States, sent his manager a one-page memo with the first control chart. Building on his work, W. Edwards Deming took these ideas to Japan, lecturing to engineers and managers from 1950, and Joseph Juran followed in 1954. Japanese industry built on them, and by the 1980s American and European firms were coming to learn from Japan.
Read more (2 more paragraphs)
Its key ideas are reading variation, improving in small cycles and drawing on the people closest to the work. Shewhart separated common causes of variation, built into the process, from special causes that can be traced and removed. Deming taught the plan, do, study, act cycle and fourteen points for management, among them ending quotas and management by objective. Juran described quality as a trilogy of planning, control and improvement. Kaoru Ishikawa spread quality circles, small groups of workers who study their own problems, and the fishbone diagram for tracing causes.
Critics say that in the 1980s and 1990s many organizations bought the slogans without the thinking, and total quality programmes turned into posters, paperwork and certificates. Others note that statistical control suits repeated work better than one-off projects, and that Deming's attack on targets and rankings asks managers to give up tools they trust. Defenders answer that the failures were in the copying, not the ideas, and that hospitals, factories and public services around the world use its cycles and charts to reduce harm. The habit worth keeping: look at the system before you blame the person.
Where it answers
Who should plan the work?
Management should design the system, but with the people who run it, testing each change in small cycles.
See how other practices answer “Who should plan the work?” →
When it goes wrong
At the system and its variation, before blaming anyone: most faults are built into the process.
Key terms
- Control chart
- A graph of a process measure over time, with limits that show whether variation is ordinary or a sign that something has changed.
- Common and special causes
- Shewhart's split between variation built into the process (common) and variation from a particular event that can be traced (special).
- PDSA cycle
- Plan, do, study, act: try a small change, see what happens, learn from it and adjust before going wider.
- Quality circle
- A small group of workers who meet regularly to study and solve problems in their own work.
- Fishbone diagram
- Ishikawa's cause-and-effect chart, which sorts the possible causes of a problem into branches such as methods, materials and machines.
In their words
“The workers are handicapped by the system, and the system belongs to the management.”
Further reading
- Economic Control of Quality of Manufactured Product · Walter A. Shewhart
- Out of the Crisis · W. Edwards Deming
- Quality Control Handbook · Joseph M. Juran