Two Kinds of Variation
In one line Some variation is built into a process and some has a cause you can find; mistaking one for the other makes things worse.
No two things a process makes are quite the same. Two loaves from one oven differ by a few grams; a laboratory that weighs one sample twice gets two slightly different readings. Since results always vary, the useful question is why a particular result varies, and whether anyone should do something about it.
Walter Shewhart, a physicist working on the quality of telephone equipment for Western Electric, gave an answer in a short memo dated 16 May 1924; the next year he joined the new Bell Telephone Laboratories. Some variation, he argued, comes from many small chance causes built into the process; it is steady and predictable within limits. Other variation has an assignable cause that can be found and named, such as a worn tool or a new batch of material. Today these are usually called common and special causes.
His memo held the first control chart, and his book Economic Control of Quality of Manufactured Product (1931) set out the method. Results are plotted in time order around a centre line at their average, with limits usually three standard deviations either side, worked out from the process's own data rather than from anyone's hopes. A point beyond a limit, or a long run on one side of the line, is a signal to look for a special cause. Points scattered inside the limits are the process's normal voice.
That last part is the hardest to accept. A manager who adjusts a machine or questions a worker after every bad day is treating common causes as special, and each adjustment adds a disturbance of its own, so the scatter grows. The opposite mistake, waving away a real signal, lets a broken tool run on. Earlier in the course, The System, Not the Person drew the lesson for blame: reducing common-cause variation means changing the process, which is management's work.
Go deeper
Why three standard deviations? Shewhart chose the limits as a practical balance between two costly mistakes: limits drawn too tight send people hunting for causes that are not there, and limits drawn too wide hide real ones. He defended the choice by how it worked in factories rather than by theory alone. Later writers added rules for patterns inside the limits, such as a run of seven or eight points on one side of the centre line, and they still disagree on the exact numbers. They agree that the rules should be chosen before looking at the data, not after.
Turning the filler up and down

Maryam runs the quality laboratory at a dairy in Irbid, Jordan, where a machine fills pots of yoghurt meant to hold 500 grams. Every hour a technician weighs five pots and phones the average to the line. When it comes in light, the shift supervisor turns the filler up a notch; when it comes in heavy, he turns it down. The supervisors are proud of how closely they watch the machine, yet the pots still range from 488 to 514 grams, and a supermarket has complained.
Maryam plots two months of hourly averages in time order and works out the limits from the data. Only one point lies outside them, on a morning when a new nozzle had been fitted. The rest is ordinary scatter, and most of the turning up and down has been answering it. She asks the supervisors to adjust only when a point breaks a limit. Within a month the range narrows to 494 to 508 grams. To narrow it further, she tells the plant manager, the filler itself will have to change.
Try this today Pick a number you check often, such as a weekly cost or a daily count, and plot its last twenty values in order before reacting to the newest one.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Two Kinds of Variation.” https://quest2plan.com/learn/lesson/two-kinds-of-variation. Accessed 29 November 2026.
Sources
- Walter A. Shewhart — His work at Western Electric and Bell Telephone Laboratories, the memo of 16 May 1924, his 1931 and 1939 books, and chance and assignable causes.
- Control chart — How a control chart is built, three-sigma limits, rules for signals, and the chart's history.