Planning, Control, Improvement

In one line Juran saw quality as three jobs, planning, holding steady and raising it, and urged teams to tackle the biggest causes first.

Joseph Juran was born in Romania in 1904, grew up in Minnesota and began his career at Western Electric in 1924. His Quality Control Handbook appeared in 1951, and the Union of Japanese Scientists and Engineers invited him to Japan, where he taught managers from 1954. His message was that quality has to be managed, much as money is.

He described that management as three processes, often called the Juran trilogy. Planning comes first: find out who the customers are and what they need, then design a product and a process able to meet those needs. Control keeps the process doing what it was designed to do: measure, compare with the goal, and act on the gap, which is where the control charts of Two Kinds of Variation belong. Improvement is a different job: raising the process to a better level, project by project, by removing the causes of chronic waste that control, by itself, merely holds steady.

For improvement Juran borrowed a name. In 1941 he came across the work of the Italian economist Vilfredo Pareto, who had found that most of Italy's land was owned by a small share of its people, and he saw the same pattern in quality: a few causes usually account for most of a problem. He called them the vital few, and the rest at first the trivial many, later the useful many, since they still matter. He later wrote that the general idea was his own, and that Pareto's name had been a handy label.

The 80:20 split is a rule of thumb, not a law: sometimes it is 90:10, and sometimes causes are spread so evenly that no short list exists. The method is what counts. Tally problems by cause, sort them from largest to smallest, and start at the top.

Four hundred long waits

Illustration: Four hundred long waits

Nurgul manages an outpatient clinic in Bishkek, Kyrgyzstan, where patients often wait two hours to be seen. The staff blame different things: the doctors blame the records room, the records clerks blame late arrivals, the nurses blame the laboratory. Nurgul asks the receptionists to note, for one month, the main reason for every wait longer than an hour.

The tally covers about four hundred long waits. Missing patient files account for roughly 150, doctors starting clinics late for about 110, and the laboratory for about 40; a dozen other causes share the rest. Two causes explain two thirds of the problem. Nurgul sets up an improvement project on the files, which are now pulled the afternoon before, and agrees a fixed start time with the doctors. Then she turns to control: a daily count of missing files goes on the staffroom wall. Two months later the average wait is about seventy minutes, and the laboratory is next on her list.

Try this today Take a problem that keeps recurring and tally its last twenty cases by cause. Sort the tally from largest to smallest and look at the top two.

Question 1 of 2

A cement plant in Settat, Morocco, records why bags are rejected: torn bags make up about half, underweight bags a quarter, wrong labels about a tenth, and several small causes the rest.

Where would Juran have the plant start its improvement work?

Question 2 of 2

Mutua is leading the project for a new maternity unit in Nakuru, Kenya. Before any layout is drawn, he is asking mothers, midwives and porters what the unit must provide.

Which of Juran's three processes is Mutua carrying out?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Planning, Control, Improvement.” https://quest2plan.com/learn/lesson/planning-control-improvement. Accessed 29 November 2026.