Build It In, Don't Inspect It In

In one line Quality comes from how the work is done; checking at the end finds faults but does not stop them being made.

A workshop that makes chairs can get quality in two ways. It can make each chair, have an inspector check it at the end, and send the faulty ones back. Or it can ask, for every fault the inspector finds, what in the making caused it, and change that. The first way catches bad chairs. The second way makes fewer of them.

W. Edwards Deming, the American statistician who taught quality methods in Japan from 1950, made this one of the fourteen points for management in his book Out of the Crisis (1986): stop depending on inspection to achieve quality. Inspection, he argued, arrives too late. By the time a fault is found, the time, material and labour that went into it are spent, and the process that produced it will go on producing more. Earlier in the course, The System, Not the Person set out his view that most faults come from the way work is set up; building quality in means changing that set-up.

Hospitals learned the same lesson the hard way. In 1847 Ignaz Semmelweis, a doctor at the Vienna General Hospital, found that deaths from fever on one maternity ward fell sharply once doctors washed their hands in a chlorinated solution before examining women. Treating each infection is the ward's version of inspecting chairs; washing hands changes how the work is done, so that fewer infections start. Many of his colleagues rejected the idea at the time, which is a reminder that prevention can be harder to sell than cure.

Inspection still has a place. Some faults cannot be prevented cheaply, and where a failure could kill, as with a bridge cable or an aircraft part, checking the finished thing remains essential. The question for any project is where its quality mainly comes from: from catching faults, or from removing their causes. Most teams need both, and many lean far harder on the first.

Counting the wobbles

Illustration: Counting the wobbles

Elham runs a small workshop in Tabriz, Iran, that makes wooden chairs for cafés. Every evening her inspector rocks each chair on a flat board, and about one in five wobbles. Those go back to the bench, where a joiner shaves a leg or reglues a joint. The chairs that leave are sound, but the evening repairs eat a fifth of the week, and orders are falling behind.

Elham stops treating the wobbles as bad luck and starts writing down where each one comes from. After two weeks the tally is clear. Most short legs were cut on one saw, whose guide has slipped out of square, and most loose joints were glued first thing on cold mornings, when the glue sets badly. She has a fixed stop block fitted to the saw and moves the glue pot beside the stove. Within a month the wobblers fall to about one in thirty, and the inspector spends her evenings on the finish instead.

Try this today Think of a mistake you or your team keep correcting. Instead of fixing it again, ask what in the way the work is done lets it happen.

Question 1 of 2

A bread factory in Oran, Algeria, throws away about one loaf in ten because it comes out of the oven underbaked. The manager proposes hiring a second inspector at the end of the line.

What would Deming most likely urge the manager to do instead?

Question 2 of 2

Gulshan manages the sterilizing room of a clinic in Samarkand, Uzbekistan. Her staff say that clean instruments are the job of the checker who inspects every tray before it goes to the theatre.

Which reply from Gulshan best captures the idea of building quality in?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Build It In, Don't Inspect It In.” https://quest2plan.com/learn/lesson/build-it-in. Accessed 30 November 2026.