Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Steady

Deming in Japan

In one line Deming's 1950 lectures helped Japan's industry change, but one teacher explains only part of a country's recovery.

In July 1950 an American statistician began a course of lectures in Tokyo that would later be told as the start of a legend. Five years after the war, much of Japan's industry was still being rebuilt, and its engineers wanted ways to make goods well with little to spare.

The Union of Japanese Scientists and Engineers, JUSE, had begun studying statistical quality control, and it invited W. Edwards Deming, who had first visited Japan in 1947 to help plan a census. He gave an eight-day course for engineers in Tokyo and a one-day course for top managers at Hakone. Quality, he told them, was management's job, and suppliers, factory and customers formed one system to be studied and improved. By his own later account he said they could compete with the world's best within five years. He gave the royalties from the printed lectures to JUSE, which used them to found the Deming Prize, first awarded in 1951.

The tale is often told as if one visitor rebuilt Japanese industry. The record is more crowded. Officers of the American occupation, among them Homer Sarasohn, had already worked with Japan's radio and telephone makers on quality, and Sarasohn recommended Deming. Joseph Juran taught in Japan from 1954, and Japanese engineers such as Kaoru Ishikawa carried the ideas further than their teachers. The economy had other engines too: orders for the Korean War from 1950, high savings lent to industry, and a ministry that steered investment.

So how much can one teacher explain? Deming brought a clear method and a message managers were ready to hear, at a time when much else was in place. Earlier in the course, The System, Not the Person set out his view that results come from systems; by that view, crediting a country's recovery to one person would be odd. What his teaching added is still argued about.

Go deeper

Deming's fame came late at home. For thirty years he was far better known in Japan, whose government decorated him for his work there, than in the United States. That changed in 1980, when a television documentary, If Japan Can... Why Can't We?, presented him as the man Japanese industry had listened to. American companies began asking for his help, and he spent his last years, into his nineties, teaching managers across the country.

Who gets the credit

Illustration: Who gets the credit

Oumou works for the education ministry in Thiès, Senegal, and has been asked to explain a success. Two years ago a visiting statistician ran a two-week course for the heads of department at the region's technical colleges, teaching them to chart pass rates and test small changes. Since then pass rates have climbed from about 60 to 75 per cent, and the board wants to hire the same trainer for every region.

Oumou visits the colleges before writing. The course clearly mattered: the departments whose heads kept charting improved most. But the same two years brought new workshops paid for by a regional fund, a revised syllabus, and in two colleges a new principal who gave heads time to meet. Departments that had the course without the time or the equipment barely moved. Her report backs the trainer, and adds that the course worked where colleges were ready to use it, so the other regions need the time and tools as well as the teacher.

Try this today Think of a success you have seen credited to one person. List three other things that changed at the same time.

Question 1 of 2

A visitor to a quality exhibition in Tokyo sees a medal bearing Deming's face and asks the guide how the prize began.

Which answer should the guide give?

Question 2 of 2

A regional agency in Mersin, Turkey, wants to revive its struggling ship-repair yards. Its plan is to fly in one famous quality expert for a week of lectures and expect the yards to be transformed.

What does the story of Deming in Japan suggest about this plan?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Deming in Japan.” https://quest2plan.com/learn/lesson/deming-in-japan. Accessed 29 November 2026.

Sources
  • The Deming Prize (JUSE) — JUSE's own account of Deming's 1950 courses in Tokyo and Hakone, his donated royalties and the founding of the prize.
  • Deming Prize — The prize's founding, its categories and its winners over the years.
  • Homer Sarasohn — His work with Japan's communications industry under the occupation, and his recommendation of Deming.