
Teams and organizations · 1947 onward
Change management
Overview
Change in an organization has to be led on purpose, through stages that loosen old habits, move people and then make the new way stick. The idea is traced to Kurt Lewin (1947) and was spread by William Bridges (1991) and John Kotter (1996). Critics say change is continuous, not a planned event, and that the stages are too neat.
Change management grew from the work of Kurt Lewin, a German-born psychologist who left for the United States in 1933. In papers published around his death in 1947, he described a group's habits as a balance held by forces for and against change, and wrote of unfreezing a level, moving it and freezing it at the new one. Later writers turned this into a three-step model for managers. William Bridges, in Managing Transitions (1991), turned attention from the change itself to the inner transition people go through. In 1996 John Kotter of Harvard Business School published Leading Change, with eight steps.
Read more (2 more paragraphs)
Kotter's steps begin with a sense of urgency and a guiding coalition, move through a vision that is shared widely and the removal of obstacles, and end with early wins, keeping up momentum and rooting the new ways in the culture. He drew them from the failures he had seen: declaring victory too soon, or skipping the hard early work. Bridges added that every change begins with an ending. People first let go of the old, pass through a confusing neutral zone and only then make a new beginning. A hospital merging two wards, or a town council moving into a new building, meets all three.
Critics have three main objections. Historians of management argue that Lewin never set out a neat three-step model; it was built later from a few lines of his and used to give newer methods a famous founder. Others say change is not an event with a start and an end but a continuous flow of small adjustments, and that step models suit consultants' timetables better than real life. The often-quoted claim that seventy per cent of change programmes fail has no sound evidence behind it. Defenders reply that step models are checklists, not laws, and help people avoid known mistakes. The habit worth keeping: name what people are losing before you sell them what they gain.
Where it answers
Who should plan the work?
A small guiding group should plan it in stages, building urgency and early wins so that others come along.
See how other practices answer “Who should plan the work?” →
When it goes wrong
At the transition: what people are being asked to give up, and whether anyone has helped them let go.
Key terms
- Unfreeze, change, refreeze
- The three-step model of change credited to Kurt Lewin: loosen the old balance, move, then settle at the new one.
- Force field
- Lewin's picture of a situation as held steady by forces pushing for and against change.
- Guiding coalition
- Kotter's term for a group with enough standing and trust to lead a change across an organization.
- Neutral zone
- Bridges's middle phase of transition, after letting go of the old and before the new feels normal.
- Episodic and continuous change
- The contrast between change as a planned break and change as the steady adjustment of daily work.
In their words
“The study of the conditions for change begins appropriately with an analysis of the conditions for "no change," that is, for the state of equilibrium.”
Further reading
- Leading Change · John P. Kotter
- Managing Transitions · William Bridges
Learn this
1 lesson on the voyage
Compare
Cite or share this page
A plain reference you can paste into notes or an essay:
Quest2Plan. “Change management.” https://quest2plan.com/learn/ideas/change. Accessed 29 November 2026.