Plan-driven methods

Overview

Big work goes best when requirements and design are settled and approved before building starts, with formal gates between stages. Winston Royce's 1970 paper on large software systems was later read as the 'waterfall', and Robert Cooper's stage-gate and Britain's PRINCE methods spread the idea. Critics say fixing everything early fails when needs change.

Plan-driven methods divide a project into stages, such as requirements, design, building, testing and use, and finish and approve each before the next begins. In 1970 Winston Royce, an American engineer who managed software for spacecraft, published a paper on managing large software systems. It drew the stages as a cascade, but warned that the simple version was risky, and added steps to go back and to build a pilot version first. Later readers kept the picture and dropped the warning, and by the late 1970s the sequence had the name waterfall.

Read more (2 more paragraphs)

Its key ideas are getting the requirements right early, signed documents and formal reviews at the end of each stage. Barry Boehm showed in 1981 that a fault found late in a project can cost many times more to fix than one found at the start, and in 1986 he proposed the spiral model, which repeats the stages in loops driven by risk. Robert Cooper's stage-gate process, from new-product research in Canada, put a go or stop decision at each gate. In Britain, government projects adopted PRINCE, later PRINCE2, with a business case checked at every stage.

Critics, among them the authors of the Agile Manifesto, say that fixing requirements early fails when users cannot know what they need until they see something working, and that late testing hides problems until they are costly. Large public IT programmes, such as Britain's National Programme for IT in the health service (2002 to 2011), are often cited. Defenders reply that bridges, aircraft, medical devices and public contracts need agreed designs and clear approval points, and that Royce and Boehm both built in feedback. The habit worth keeping: decide which choices must be fixed early, and fix only those.

Where it answers

Key terms

Waterfall
A sequence of stages, each finished and approved before the next starts; a name later readers gave to Royce's diagram.
Stage gate
A decision point between stages where a project is reviewed and then continued, changed or stopped.
Requirements specification
A document setting out what the finished product must do, agreed before design begins.
Cost of change
Boehm's finding that a fault costs far more to fix the later in a project it is found.
Spiral model
Boehm's 1988 model, which passes through planning, risk analysis, building and review in repeated loops.

In their words

“The major distinguishing feature of the spiral model is that it creates a risk-driven approach to the software process rather than a primarily document-driven or code-driven process.”
Barry Boehm, A Spiral Model of Software Development and Enhancement (1988)

Further reading

  • Managing the Development of Large Software Systems · Winston W. Royce
  • Software Engineering Economics · Barry W. Boehm
  • Winning at New Products · Robert G. Cooper

Learn this

Compare

Cite or share this page

A plain reference you can paste into notes or an essay:

Quest2Plan. “Plan-driven methods.” https://quest2plan.com/learn/ideas/plan-driven. Accessed 29 November 2026.