
Lesson · 6 min Stretch
Checking the Climate
In one line A short survey can show how safe a team feels, but it misses what people will not write, so pair it with talk.
A team can check its own psychological safety, but the check has a catch: the less safe people feel, the less likely they are to say so. Edmondson's 1999 study used seven statements that team members rate from disagree to agree. They cover such things as whether mistakes are held against you, whether problems and tough issues can be raised, and whether your particular skills are valued.
Such surveys share the limits of all self-reports. People in a frightened team may give the answers they think are wanted, especially when the team is small and anonymity is doubtful. An average can hide one person who feels shut out. A high score can mean comfort rather than candour. Scores are most useful compared over time within one team, not across teams doing different work, and a survey can show that there is a problem without showing why.
So a survey works best alongside a frank conversation, ideally led by someone outside the team's line of command: what is hard to say here, and when did someone last say it? Everyday signs help too: who speaks in meetings, how long bad news takes to travel, whether near misses get reported. Then the team acts on what it learned and says what it did, because a survey followed by nothing teaches the silence of having been ignored, as Why People Stay Silent described.
The aim is not a good score but a team that can hear its own bad news.
The high score

Hanan runs programmes at a charity in Cairo, Egypt, that funds classes for children who have missed school. Her team of nine scores high on a short safety survey. Yet within a month two field officers resign, and one says on leaving that nobody ever listened to the field. Hanan realizes that with nine people and job titles on the form, few would have felt anonymous.
She asks a manager from a partner charity to hold a session with the team while she stays away. The notes come back without names. Field officers had warned for months that one partner school was barely open, but their reports were edited down before reaching her because nobody wanted to upset a long-standing partner. Hanan changes the reporting so that field notes reach her unedited, visits the school, and tells the team at the next meeting what she found and what she has done.
Try this today Ask a colleague you trust: what is one thing people here find hard to say out loud? Listen without defending.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Checking the Climate.” https://quest2plan.com/learn/lesson/checking-the-climate. Accessed 29 November 2026.
Sources
- Edmondson (1999): Psychological Safety and Learning Behavior in Work Teams (Psychological Safety Field Guide) — How the study's survey was built from interviews, and the limits of a single-company survey.
- Self-report study (Wikipedia) — The strengths and limits of questionnaires, including honesty and social desirability.
- Social desirability bias (Wikipedia) — Why people tend to give the answers they think are wanted.