Teams Wake Up at the Midpoint

In one line Many project teams keep their first approach until about halfway to the deadline, then change course sharply.

Many teams drift through their first weeks and then race at the end. Connie Gersick, an American organizational researcher, set out to watch how project teams develop. Her study, published in 1988, followed eight real teams from their first meeting to their deadline, sitting in on every meeting: groups of graduate students, a bank task force, hospital administrators and a community fundraising committee. Their deadlines ranged from about a week to six months.

She found no common sequence of stages. Each team settled on a way of approaching its work almost at once, often in its first meeting, and kept to it. Then, close to halfway between first meeting and deadline, almost every team changed sharply: it dropped old habits, went back to its sponsors or supervisors and made a burst of progress. A steadier period followed, then a final push. The trigger was the calendar, members noticing that half their time had gone, not how much work was done. Gersick called this punctuated equilibrium: long stability broken by short upheavals.

Set beside The Stages of a Team, and Their Limits, the contrast is clear. Tuckman described how members come to terms with each other; Gersick described how a team's way of tackling its task holds and then shifts. Her sample was small, and later studies have not always found the turn at exactly halfway; some researchers argue it shows how people pace work under a deadline rather than how groups grow.

For a lead the finding is practical. If teams are open to rethinking near the midpoint, plan a real review there: is our approach still right, and what would we do if we started today? J. Richard Hackman gave similar advice, naming the midpoint as a moment when coaching helps most. The catch is the start: whatever a team falls into at its first meeting may last half the project.

Go deeper

Gersick tested the idea again in a laboratory, in a study published in 1989, giving groups a task to finish within a set time, and the laboratory groups showed the same turn near the halfway point. The finding has an awkward side. If teams tend to rethink when they notice half their time has gone, a team whose deadline is vague, or keeps moving, may never get a clear midpoint, and so may miss its natural moment to stop and rethink.

Week five in Tunis

Illustration: Week five in Tunis

Rafiq leads a team of four at a research institute in Tunis, writing a grant proposal to test drought-tolerant wheat on farms in the south. They have ten weeks. At the first meeting they agreed to begin with a thorough review of past studies, and for five weeks they read, summarized and compared. Rafiq had also put a meeting in the calendar for the end of week five, with one item on the agenda: our plan.

At that meeting they laid out what they had: a fine forty-page review, no budget and no farmers yet willing to host trials. Rafiq asked what they would do if they were starting that day. The answer was obvious once asked. They cut the review to three pages, two members phoned a farmers' cooperative near Kairouan that afternoon, and the other two drafted the budget. The proposal went in two days before the deadline, with a letter of support from the cooperative.

Try this today Find the halfway date of something you are working on, and put a short meeting there with one question: if we started today, what would we do?

Question 1 of 2

A design team in Cebu, the Philippines, has twelve weeks to plan new signs for a ferry terminal. The sponsor wants to know when the team is most likely to rethink its approach.

Going by Gersick's study, when should the sponsor expect that turn?

Question 2 of 2

Ji-woo is planning the calendar for a six-month survey of rural clinics, run from a university in Daejeon, South Korea. She wants to make use of Gersick's finding.

Which plan puts the finding to best use?